Indian Tenders

Tender Notice

TDR 55329694
Tendering Authority Himachal Pradesh State Electricity Board
Tender No NO/HED/15/2026-27
Tender ID 2026_HPSEB_135302_1
Tender Brief Tender For Tender For providing 11 Kv Ht Line To Proposed 11/0.4 Kv, 250 Kva Substation For Sop To 67.36 Kw Load For Chc Building At Village Beetan Under Under Esd Hpsebl Dulehar.
City Haroli
State Himachal Pradesh
Document Fees INR 590 /-
EMD INR 12846.0 /-
Tender Value INR 12.84 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Tender For providing 11 Kv Ht Line To Proposed 11/0.4 Kv, 250 Kva Substation For Sop To 67.36 Kw Load For Chc Building At Village Beetan Under Under Esd Hpsebl Dulehar.

Key Dates

Publish Date 04-05-2026
Last Date of Bid Submission 11-05-2026
Tender Opening Date 11-05-2026

Contact Information

Company Name Himachal Pradesh State Electricity Board
Contact Person Sr.Xen
Address (Er.Rahul Puri) Sr. Executive Engineer, Electrical Division, HPSEBL Haroli

BOQ Items

Name of Work:- Tender for Prov. 11 KV HT Line to proposed 11/0.4 KV, 250 KVA Substation for SOP to 67.36 KW load for CHC building at village Beetan under under ESD HPSEBL Dulehar.
Sl. No. Item Description
1Erection Part of 11 KV HT Line
2Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
3Erection of Double Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
4Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
5Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
6Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
7Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
8Fixing jumper complete in all respect.
9Erection of GO switch complete in all respect.
10Erection of DO Fuse complete in all respect.
11Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
12Erection Part of 11/0.4 KV, 250 KVA Transformer
13Erection of 250 kva S/Stn. Str.:-Digging of Pit for Steel Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 2 Nos for CTPT., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. (Erection of 250 kva)
14Transportation and Loading of S/Stn. complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
15Transformer Bed (Civil Work)Complete in all respect.
16Chain Link fencing , Angle Iron ,Gate etc for transformerfencingComplete in all respect.
17Supply Part of 11 KV HT Line
18Prov. Steel Tubular Poles (9m, Working Load > 227kgf/m²) with Steel cap & Base Plate
19Prov. RCC Muff
20Prov. concrete filling in RCC muff
21Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor
22Run Through Str. ( ∆) Formation on Singlr Pole Str.
23Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
24Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
25Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
26Prov.11kv Pin Insulator with pin complete in all respect
27HT Stay /guy Arrengement
28Prov. Stay set complete
29Prov. Stay Wire HT (10.0 kg Per Stay Set)
30Earthing
31Prov.11kv Earthing set complete in all respect.
32Prov.G.I.Wire No. 8 SWG in mtr.
33Prov.Eye/Earth Hook
34Prov.MS Half Clamp
35Prov.MS Full Clamp/stay
36Prov.11kv Danger Plate (250x200x1.6 mm) Suppy by HPSEBL (2No.)
37Prov.Nuts and Bolts of Various Sizes
38Prov.Barbed Wire
39Prov. Aluminium Paint.
40Prov. Red Oxide
41Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
42Prov. D.O Fuse Unit
43Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
44Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm
45Tapping Str. Supply Material
46Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate
47Prov. RCC Muff
48Prov. concrete filling in RCC muff
49Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No.
50Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no
51Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation
52Prov.11kv Earthing set complete in all respect.
53Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm
54Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
55Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
56Prov. D.O Fuse Unit
57Prov. Stay set complete
58Prov. Stay Wire HT (10.0 kg Per Stay Set)
59Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
60Prov. Half Clamp (M.S. Flat 50X6 mm)
61Prov. Full Clamp (M.S. Flat 50X6 mm)
62Prov.11kv Danger Plate (250x200x1.6 mm) Suppy by HPSEBL (1No.)
63Supply Part of 11/0.4 KV, 250 KVA Transformer
64Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA
65Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
66Prov. RCC Muff
67Prov. concrete filling in RCC muff
68Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
69Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
70Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
71Transformer Belting & Knee Bracing
72Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
73Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
74Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
75Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
76Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
77Transformer L.T Distribution Box and GO Switch fixing Assembly
78Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
79Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
80Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
81Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
82Prov. D.O Fuse Unit
83Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
84Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
85Prov. Stay set complete
86Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
87Prov. Pipe Earthing Set
88Prov. 6 SWG GI wire For Earthing
89Panel (Distribution Box LT 250 kVA DTR MS Sheet of 1.6 mm ( 1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm( min. 100 Amp ) , AI 50X50X6 mm of length 2.2 Mtr inside .painted /powder coated after primar coating With CoppPer thimbles of 200 Amp, Insulating sleeves etc. MCCB 400 amp 3P 50kA -1 No. ICS 100 % ICU & MCCB 250 Amp 36 kA =3 nos
90Prov. Half Clamp (M.S. Flat 50X6 mm)
91Prov. Full Clamp (M.S. Flat 50X6 mm)
92Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
93Prov. Aluminium Thimble
94Prov. Copper Thimble 200 Amp
95Prov. Danger Plate
96Prov. Barbed Wire
97Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured
98Prov. Aluminium Paint.
99Prov. Red Oxide
100Prov. Re-earthing of DTR.
101LT Switched Caapcitor 81 KVAr for 250KVA
102CT-PT for HT metering tested from M& T with testing report at the time of installation Please Enable Macros to View BoQ information

Other Detail

Information Source https://hptenders.gov.in
Download FileName File Description File Size
Download 88caf119-bc70-4d0a-b302-1e693591f98b.html Tender Documents 0 KB
Download additionaltermandcondition.pdf Tender Documents 0 KB
Download BOQ_200403.xls Tender Documents 0 KB
Download Tendernotice_1 (6).pdf Tender Documents 0 KB
Download termandcondition.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.