Indian Tenders

Tender Notice

TDR 55329646
Tendering Authority Public Health Engineer Organisation
Tender No ACEPHBGR 01/2026-27
Tender ID 2026_PHEO_128762_1
Tender Brief Tender For External Electrification To Intake Well Wtp And Zonal Reservoirs In Connection To The Work Augmentation Of Water Supply System Along With Ancillary Works For Patnagarh Town.
City Patnagarh
State Odisha
Document Fees INR 10000 /-
EMD INR 682082.0 /-
Tender Value INR 6.82 Crore /-
Tender Type Tender
Bidding Type National Competitive Bid
Competition Type Indian

Tender Details

Tender for External Electrification To Intake Well Wtp And Zonal Reservoirs In Connection To The Work Augmentation Of Water Supply System Along With Ancillary Works For Patnagarh Town.

Key Dates

Publish Date 04-05-2026
Last Date of Bid Submission 18-05-2026
Tender Opening Date 19-05-2026

Contact Information

Company Name Public Health Engineer Organisation
Contact Person Additional Chief Engineer, P.H. Division, Balangir
Address Additional Chief Engineer, P.H. Division, Balangir

BOQ Items

Name of Work:- External Electrification to intake well WTP and zonal reservoirs in connection to the work Augmentation of water supply system along with ancillary works for Patnagarh town.
Sl. No. Item Description
1Part-I (For proposed 33KV line)Supply,Transportation and erection Cost of 11 Mtr long 150x150 MM RS joist Pole for 33 KV line and DP 34.6kg/mtr etc. all complete as per the direction of Engineer-In-Charge
2Supply,Transportation and erection of 500 KVA 33/0.4 KV (Cu) Transformer plinth Mounted,BIS Energy level-II, Ammendment -4 IS(1180) etc. all complete as per the direction of Engineer-In-Charge
3Cost of accessories for 500 KVA 33/0.4 KV Transformer plinth Mounted, MS Chanel 100x50x6mm etc. all complete as per the direction of Engineer-In-Charge
4Supply,Transportation and erection of MS Chanel 75x40x6mm etc. all complete as per the direction of Engineer-In-Charge
5Supply,Transportation and erection of MS Angel 50x50x6mm etc. all complete as per the direction of Engineer-In-Charge
6Supply,Transportation and erection of 11KV Polymer Disc Insulator B&S (70KN) etc. all complete as per the direction of Engineer-In-Charge
7Supply,Transportation and erection of 11KVH/W fitting for Disc (70KN) etc. all complete as per the direction of Engineer-In-Charge
8Supply,Transportation and erection of PG Clamp for 100 sqmm AAAC etc. all complete as per the direction of Engineer-In-Charge
9Supply,Transportation and erection of GI Flat 50x6mm etc. all complete as per the direction of Engineer-In-Charge
10Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
11Supply,Transportation and erection of 11KV A/B Switch (400A,3 Pole,Hz type) etc. all complete as per the direction of Engineer-In-Charge
12Supply,Transportation and erection of 11KV DD Fuse 3Pole etc. all complete as per the direction of Engineer-In-Charge
13Supply,Transportation and erection of DD Fuse Link Unit (30A) etc. all complete as per the direction of Engineer-In-Charge
14Supply,Transportation and erection of 11KV Lightning Arrestor etc. all complete as per the direction of Engineer-In-Charge
15Supply,Transportation and erection of Conductor ACSR PVC (61.7 sqmm) etc. all complete as per the direction of Engineer-In-Charge
16Supply,Transportation and erection of H.T Stay set complete etc. all complete as per the direction of Engineer-In-Charge
17Supply,Transportation and erection of H.T Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
18Supply,Transportation and erection of H.T Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
19Supply,Transportation and erection of 7/10SWG Staywire etc. all complete as per the direction of Engineer-In-Charge
20Supply,Transportation and erection of 40mm nominal bore GI Pile (medium gauge )earthing device etc. all complete as per the direction of Engineer-In-Charge
21Supply,Transportation and erection of Pipe HDPE (25mm) etc. all complete as per the direction of Engineer-In-Charge
22Supply,Transportation and erection of Pipe GI (100mm) etc. all complete as per the direction of Engineer-In-Charge
23Supply,Transportation and erection of 1Cx600mm 2 LT XLPE Cable (Armoured) etc. all complete as per the direction of Engineer-In-Charge
24Supply,Transportation and erection of LT Distribution Box with 400 Amps ACB etc. all complete as per the direction of Engineer-In-Charge
25Supply,Transportation and erection of AI Cable Soket 70mm etc. all complete as per the direction of Engineer-In-Charge
26Supply,Transportation and erection of AI Cable Soket 95mm etc. all complete as per the direction of Engineer-In-Charge
27Supply,Transportation and erection of GI .Bolts ,Nuts & Washers etc. all complete as per the direction of Engineer-In-Charge
28Supply,Transportation and erection of GI Barbered wire for Anticlimbling etc. all complete as per the direction of Engineer-In-Charge
29Supply, all labour & T&P forDanger Plate etc. all complete as per the direction of Engineer-In-Charge
30Supply,Transportation and erection of Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
31Supply, all labour and Concrete materials for stay anchor plate etc. all complete as per the direction of Engineer-In-Charge
32Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge
33Supply, all labour & T&P for Economic Brick Design fencing etc. all complete as per the direction of Engineer-In-Charge
34Supply, all labour,materials & T&P for Plinth for transformer etc. all complete as per the direction of Engineer-In-Charge
35Supply, all labour & T&P , Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
36Supply, all labour & T&P Concreting for ACB Base etc. all complete as per the direction of Engineer-In-Charge
37Supply, all labour & T&P for Drawing approval etc. all complete as per the direction of Engineer-In-Charge
38Supply, all labour & T&P for Inspection fee with drawing approval etc. all complete as per the direction of Engineer-In-Charge
3933KV Line using 148 Sq.mm insulated AAACSupply,Transportation and erection of 13 mtr 150X150 RS Joist Pole 34.6Kg/m etc. all complete as per the direction of Engineer-In-Charge
40Supply,Transportation and erection of 148 sq.mm insulated AAAC for 33 KV line etc. all complete as per the direction of Engineer-In-Charge
41Supply,Transportation and erection of Mid Span Joint for 148sq.mm insulated A etc. all complete as per the direction of Engineer-In-Charge
42Supply,Transportation and erection of Tension Assembly Wedge etc. all complete as per the direction of Engineer-In-Charge Type
43Supply,Transportation and erection of IPC (148 Insulated AAAC) etc. all complete as per the direction of Engineer-In-Charge
44Supply,Transportation and erection of Mechanical Connector etc. all complete as per the direction of Engineer-In-Charge
45Supply,Transportation and erection of Non-Metallic Alignment Ties etc. all complete as per the direction of Engineer-In-Charge
46Supply,Transportation and erection of MS Channel 100x50x6mm etc. all complete as per the direction of Engineer-In-Charge
47Supply,Transportation and erection of MS Channel 75x40x6mm etc. all complete as per the direction of Engineer-In-Charge
48Supply,Transportation and erection of Fish Plate 50x6mm etc. all complete as per the direction of Engineer-In-Charge
49Supply,Transportation and erection of GI Flat 50x6mm etc. all complete as per the direction of Engineer-In-Charge
50Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
51Supply,Transportation and erection of 33 KV V- Cross Arm (GI)-22 KG etc. all complete as per the direction of Engineer-In-Charge
52Supply,Transportation and erection of GI Back Clamp for V cross arm (33KV)1.7 etc. all complete as per the direction of Engineer-In-Charge
53Supply,Transportation and erection of 33 KV F Clamp etc. all complete as per the direction of Engineer-In-Charge
54Supply,Transportation and erection of 33KV Disc Insulator (B &S), Polymer 90 etc. all complete as per the direction of Engineer-In-Charge
55Supply,Transportation and erection of 33KV H/W Fitting (B & S type) for Disc I etc. all complete as per the direction of Engineer-In-Charge
56Supply,Transportation and erection of PG Clamp for 148 Sqmm AAAC etc. all complete as per the direction of Engineer-In-Charge
57Supply,Transportation and erection of 33KV Pin Insulator, Polymer etc. all complete as per the direction of Engineer-In-Charge
58Supply,Transportation and erection of HT Stay set complete etc. all complete as per the direction of Engineer-In-Charge
59Supply,Transportation and erection of HT Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
60Supply,Transportation and erection of HT Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
61Supply,Transportation and erection of No. 8 GI wire for earthing etc. all complete as per the direction of Engineer-In-Charge
62Supply,Transportation and erection of Earthing of support (Coil Type) etc. all complete as per the direction of Engineer-In-Charge
63Supply,Transportation and erection of 40mm nominal bore GI Pipe earthing device etc. all complete as per the direction of Engineer-In-Charge
64Supply,Transportation and erection of Pipe HDPE(25 mm) etc. all complete as per the direction of Engineer-In-Charge
65Supply,Transportation and erection of GI Nuts Bolt & Washer etc. all complete as per the direction of Engineer-In-Charge
66Supply,Transportation and erection of GI Barbered wire for anticlimbing etc. all complete as per the direction of Engineer-In-Charge
67Supply,Transportation and erection of Danger Plate etc. all complete as per the direction of Engineer-In-Charge
68Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge
69Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
70Supply, all labour ,materials & T&P. Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
71Supply, all labour ,materials & T&P Cradle Guard for Road crossing etc. all complete as per the direction of Engineer-In-Charge
7233KV Line using 100 Sq.mm AAAC line on RSJ poleSupply,Transportation and erection of 13 mtr 150X150 RS JoistPole 34.6Kg/m etc. all complete as per the direction of Engineer-In-Charge
73Supply,Transportation and erection of 100 sq.mm AAAC line etc. all complete as per the direction of Engineer-In-Charge
74Supply,Transportation and erection of MS Channel 100x50x6mm etc. all complete as per the direction of Engineer-In-Charge
75Supply,Transportation and erection of MS Channel 75x40x6mm etc. all complete as per the direction of Engineer-In-Charge
76Supply,Transportation and erection of Fish Plate 50x6mm etc. all complete as per the direction of Engineer-In-Charge
77Supply,Transportation and erection of GI Flat 50x6mm
78Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
79Supply,Transportation and erection of 33 KV V- Cross Arm (GI)-22 KG etc. all complete as per the direction of Engineer-In-Charge
80Supply,Transportation and erection of GI Back Clamp for V crossarm (33KV)1.7 etc. all complete as per the direction of Engineer-In-Charge
81Supply,Transportation and erection of 33 KV F Clamp etc. all complete as per the direction of Engineer-In-Charge
82Supply,Transportation and erection of 33KV Disc Insulator (B & S)Polymer 90 etc. all complete as per the direction of Engineer-In-Charge
83Supply,Transportation and erection of 33KV H/W Fitting (B & Stype) for Disc I etc. all complete as per the direction of Engineer-In-Charge
84Supply,Transportation and erection of PG Clamp for 100 SqmmAAAC etc. all complete as per the direction of Engineer-In-Charge
85Supply,Transportation and erection of 33KV Pin Insulator,Polymer etc. all complete as per the direction of Engineer-In-Charge
86Supply,Transportation and erection of HT Stay set complete etc. all complete as per the direction of Engineer-In-Charge
87Supply,Transportation and erection of HT Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
88Supply,Transportation and erection of HT Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
89Supply,Transportation and erection of 7/8 SWG GI wire for stay etc. all complete as per the direction of Engineer-In-Charge
90Supply,Transportation and erection of No. 8 GI wire for earthing etc. all complete as per the direction of Engineer-In-Charge
91Supply,Transportation and erection of Earthing of support (CoilType) etc. all complete as per the direction of Engineer-In-Charge
92Supply,Transportation and erection of 40mm nominal bore GI Pipe earthing device etc. all complete as per the direction of Engineer-In-Charge
93Supply,Transportation and erection of Pipe HDPE(25 mm) etc. all complete as per the direction of Engineer-In-Charge
94Supply,Transportation and erection of GI Nuts Bolt & Washer etc. all complete as per the direction of Engineer-In-Charge
95Supply,Transportation and erection of GI Barbered wire for anticlimbing etc. all complete as per the direction of Engineer-In-Charge
96Supply,Transportation and erection of Danger Plate etc. all complete as per the direction of Engineer-In-Charge
97Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge(For support)
98Supply, all labour,materials & T&P. Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
99Supply, all labour,materials & T&P.Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
10033KV metering unit arrangement Supply,Transportation and erection of 13 mtr 150X150 RS JoistPole 34.6Kg/m etc. all complete as per the direction of Engineer-In-Charge
101Supply,Transportation and erection of MS Channel 100x50x6mm etc. all complete as per the direction of Engineer-In-Charge
102Supply,Transportation and erection of Bracing Channel75x40x6mm etc. all complete as per the direction of Engineer-In-Charge
103Supply,Transportation and erection of Fish plate etc. all complete as per the direction of Engineer-In-Charge
104Supply,Transportation and erection of Aluminium Socket 240sqmm etc. all complete as per the direction of Engineer-In-Charge
105Supply,Transportation and erection of 33 KV Lightning Arrestor 30KA etc. all complete as per the direction of Engineer-In-Charge
106Supply,Transportation and erection of G.I. Pipe Earthing 3mtr.Long (OD/ID - 4)etc. all complete as per the direction of Engineer-In-Charge
107Supply,Transportation and erection of GI Flat 50x6mm etc. all complete as per the direction of Engineer-In-Charge
108Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
109Supply,Transportation and erection of GI Pipe riser (200 mm) etc. all complete as per the direction of Engineer-In-Charge
110Supply,Transportation and erection of 2.5mmsq 10core ControlCable etc. all complete as per the direction of Engineer-In-Charge
111Supply,Transportation and erection of GI Nuts, bolt & Washer etc. all complete as per the direction of Engineer-In-Charge
112Supply,Transportation and erection of HT Stay Set complete etc. all complete as per the direction of Engineer-In-Charge
113Supply,Transportation and erection of HT Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
114Supply,Transportation and erection of HT Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
115Supply,Transportation and erection of 7/10 SWG GI wire for stay etc. all complete as per the direction of Engineer-In-Charge
116Supply,Transportation and erection of Pipe HDPE (25 mm) etc. all complete as per the direction of Engineer-In-Charge
117Supply,Transportation and erection of Danger Plate etc. all complete as per the direction of Engineer-In-Charge
118Supply,Transportation and erection of GI Barbered wire for anticlimbing etc. all complete as per the direction of Engineer-In-Charge
119Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge(For support)
120Supply, all labour,materials & T&P. Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
121Supply, all labour,materials & T&P.Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
12233KV Cable Termination DPSupply,Transportation and erection of 13 mtr 150X150 RS Joist Pole 34.6Kg/m etc. all complete as per the direction of Engineer-In-Charge
123Supply,Transportation and erection of MS Channel 100x50x6mm etc. all complete as per the direction of Engineer-In-Charge
124Supply,Transportation and erection of MS Channel 75x40x6mm etc. all complete as per the direction of Engineer-In-Charge
125Supply,Transportation and erection of Fish Plate 50x6mm etc. all complete as per the direction of Engineer-In-Charge
126Supply,Transportation and erection of GI Flat 50x6mm etc. all complete as per the direction of Engineer-In-Charge
127Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
128Supply,Transportation and erection of 33 KV Lightning Arrestor 30 KA etc. all complete as per the direction of Engineer-In-Charge.
129Supply,Transportation and erection of 33KV Disc Insulator (B &S), Polymer 90 etc. all complete as per the direction of Engineer-In-Charge
130Supply,Transportation and erection of 33KV H/W Fitting (B & S type) for Disc I etc. all complete as per the direction of Engineer-In-Charge
131Supply,Transportation and erection of PG Clamp for 232 Sqmm AAAC etc. all complete as per the direction of Engineer-In-Charge
132PG Clamp for 148 Sqmm AAAC etc. all complete as per the direction of Engineer-In-Charge
133Supply,Transportation and erection of HT Stay set complete etc. all complete as per the direction of Engineer-In-Charge
134Supply,Transportation and erection of HT Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
135Supply,Transportation and erection of HT Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
136Supply,Transportation and erection of Aluminium Socket 240 sqmm etc. all complete as per the direction of Engineer-In-Charge
137Supply,Transportation and erection of GI Pipe Riser (200 mm) etc. all complete as per the direction of Engineer-In-Charge
138Supply,Transportation and erection of 7/8 SWG GI wire for stay etc. all complete as per the direction of Engineer-In-Charge
139Supply,Transportation and erection of 40mm nominal bore GI Pipe earthing device
140Supply,Transportation and erection of Pipe HDPE(25 mm) etc. all complete as per the direction of Engineer-In-Charge
141Supply,Transportation and erection of GI Nuts Bolt & Washer etc. all complete as per the direction of Engineer-In-Charge
142Supply,Transportation and erection of GI Barbered wire foranticlimbing etc. all complete as per the direction of Engineer-In-Charge
143Supply,Transportation and erection of Danger Plate etc. all complete as per the direction of Engineer-In-Charge
144Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge(For support)
145Supply, all labour,materials & T&P. Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
146Supply, all labour,materials & T&P.Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
14733KV HTTV Meter with MU AMRSupply,Transportation and erection of metering Unit 33KV3P4W 20/1 AMP etc. all complete as per the direction of Engineer-In-Charge
148Supply,Transportation and erection of Meter HTTV3P4W-/1A-110V 0.2 ACCWith BO etc. all complete as per the direction of Engineer-In-Charge
149Supply,Transportation and erection of Modem GPRS 4G/LTECompatible W/access etc. all complete as per the direction of Engineer-In-Charge
15033 KV 4 Pole structure with 2Nos IsolatorsSupply,Transportation and erection of 13 mtr 150X150 RS JoistPole 34.6Kg/m etc. all complete as per the direction of Engineer-In-Charge
151Supply,Transportation and erection of Bracing Channel 75x40x6mm- 8x4mtr. Long,etc. all complete as per the direction of Engineer-In-Charge
152Supply,Transportation and erection of Fish plate etc. all complete as per the direction of Engineer-In-Charge
153Supply,Transportation and erection of 33 KV 800Amp Isolatorwithout earth switch etc. all complete as per the direction of Engineer-In-Charge
154Supply,Transportation and erection of 33KV Pin Insulator,Polymer etc. all complete as per the direction of Engineer-In-Charge
155Supply,Transportation and erection of 33KV Disc Insulator(polymer) 120 KN etc. all complete as per the direction of Engineer-In-Charge
156Supply,Transportation and erection of 33KV H/W Fitting (B&SType) 120KN (Single)etc. all complete as per the direction of Engineer-In-Charge
157Supply,Transportation and erection of PG Clamp for 232mmsqAAA Conductor etc. all complete as per the direction of Engineer-In-Charge
158Supply,Transportation and erection of G.I. Pipe Earthing 3mtr.Long (OD/ID - 4 etc. all complete as per the direction of Engineer-In-Charge
159Supply,Transportation and erection of GI Flat 50x6mm etc. all complete as per the direction of Engineer-In-Charge
160Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
161Supply,Transportation and erection of H.T.Stay set complete etc. all complete as per the direction of Engineer-In-Charge
162Supply,Transportation and erection of HT Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
163Supply,Transportation and erection of HT Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
164Supply,Transportation and erection of 7/8 SWG Staywire etc. all complete as per the direction of Engineer-In-Charge
165Supply,Transportation and erection of GI Nuts, bolt & Washer etc. all complete as per the direction of Engineer-In-Charge
166Supply,Transportation and erection of Pipe HDPE (25 mm) etc. all complete as per the direction of Engineer-In-Charge
167Supply,Transportation and erection of Danger Plate etc. all complete as per the direction of Engineer-In-Charge
168Supply,Transportation and erection of GI Barbered wire for anticlimbing etc. all complete as per the direction of Engineer-In-Charge
169Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge
170Supply, all labour,materials & T&P. Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
171Supply, all labour,materials & T&P.Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
17233 KV 4 Pole structure with 2Nos IsolatorsSupply,Transportation and erection of 33 KV 3C, 95 sqmm XLPE Cable etc. all complete as per the direction of Engineer-In-Charge make-POLYCAB/HAVELS/FINOLEX
173Supply,Transportation and erection of O/D Jointing Kit for 3C, 95 sqmm XLPE Cable etc. all complete as per the direction of Engineer-In-Charge
17433KV DP with 1Nos of IsolatorSupply,Transportation and erection of 13 mtr 150X150 RS JoistPole 34.6Kg/m etc. all complete as per the direction of Engineer-In-Charge
175Supply,Transportation and erection of MS Channel 100x50x6mm-4.5mtr. Long, 8Nos etc. all complete as per the direction of Engineer-In-Charge
176Supply,Transportation and erection of Bracing Channel 75x40x6mm- 8x4mtr. Long, etc. all complete as per the direction of Engineer-In-Charge
177Supply,Transportation and erection of Fish plate etc. all complete as per the direction of Engineer-In-Charge
178Supply,Transportation and erection of 33KV Disc Insulator (polymer) 120 KN etc. all complete as per the direction of Engineer-In-Charge
179Supply,Transportation and erection of 33KV H/W Fitting (B&SType) 120KN (Singl) etc. all complete as per the direction of Engineer-In-Charge
180Supply,Transportation and erection of PG Clamp for 232mmsq AAA Conductor etc. all complete as per the direction of Engineer-In-Charge
181Supply,Transportation and erection of Aluminium Socket 240 sqmm etc. all complete as per the direction of Engineer-In-Charge
182Supply,Transportation and erection of 33 KV 800Amp Isolator without earth switch etc. all complete as per the direction of Engineer-In-Charge
183Supply,Transportation and erection of 33 KV HG Fuse complete set 400 Amps. etc. all complete as per the direction of Engineer-In-Charge
184Supply,Transportation and erection of G.I. Pipe Earthing 3mtr.Long (OD/ID - 4) etc. all complete as per the direction of Engineer-In-Charge
185Supply,Transportation and erection of GI Flat 50x6mm etc. all complete as per the direction of Engineer-In-Charge
186Supply,Transportation and erection of GI Flat 25x6mm etc. all complete as per the direction of Engineer-In-Charge
187Supply,Transportation and erection of H.T.Stay set complete etc. all complete as per the direction of Engineer-In-Charge
188Supply,Transportation and erection of HT Stay Insulator etc. all complete as per the direction of Engineer-In-Charge
189Supply,Transportation and erection of HT Stay Clamp etc. all complete as per the direction of Engineer-In-Charge
190Supply,Transportation and erection of 7/8 SWG Staywire etc. all complete as per the direction of Engineer-In-Charge
191Supply,Transportation and erection of GI Nuts, bolt & Washer etc. all complete as per the direction of Engineer-In-Charge
192Supply,Transportation and erection of Pipe HDPE (25 mm) etc. all complete as per the direction of Engineer-In-Charge
193Supply,Transportation and erection of Danger Plate etc. all complete as per the direction of Engineer-In-Charge
194Supply,Transportation and erection of GI Barbered wire for anticlimbing etc. all complete as per the direction of Engineer-In-Charge
195Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. as per the direction of Engineer-In-Charge etc. all complete as per the direction of Engineer-In-Charge
196Supply, all labour,materials & T&P. Fabrication & Galvanisation etc. all complete as per the direction of Engineer-In-Charge
197Supply, all labour,materials & T&P.Earthing Pit for Pipe Earthing etc. all complete as per the direction of Engineer-In-Charge
198Electrification work for WTP(as per TPWODL estimate)Supply, transportation and errection of 13 meter long 150x150 MM RS joist pole for 33KV line and DP 34.6kg/mtr etc. all complete as per the direction of Engineer-In-Charge
199Supply, transportation and errection of 33KV O/D VCB -1600A, with indoor CR panel & without PT ,WITH outdoor CT for &T/F & LINE protection all complete as per the direction of Engineer-In-Charge
200Supply, transportation and errection of 750KVA 33/.4 KV S/S BIS Level-II Ammendment -4 IS(1180) all complete as per the direction of Engineer-In-Charge
201Supply, transportation and errection of Cost of accessories for S/S for 750KVA 33/.4 KV DTR all complete as per the direction of Engineer-In-Charge
202Supply, transportation and errection of 33 KV line with 232 sq.mm AAAC using 13 mtr RS joist pole & with one set of cradle guard for road crossing all complete as per the direction of Engineer-In-Charge
203Supply, transportation and errection of 33KV DP for cable termination using 13 mtr RS joist pole all complete as per the direction of Engineer-In-Charge
204Supply, transportation and errection of 33KV DP with isolator using 13 mtr RS joist pole all complete as per the direction of Engineer-In-Charge
205Supply, transportation and errection of 33KV Lightning Arrestor all complete as per the direction of Engineer-In-Charge
206Supply, transportation and errection of 33KV line with 300sq.mm XLPE cable (i.e 15 mtr termination at DP + 50mtr in UG (open trench) +5mtr termination at metering cubicle unit) all complete as per the direction of Engineer-In-Charge(Make-Poly cab/Havels/Finolex)
207Supply, transportation and errection of I/D Jointing kit for 3C, 300SQ.MM XLPE Cable all complete as per the direction of Engineer-In-Charge
208Supply, transportation and errection of O/D Jointing kit for 3C, 300SQ.MM XLPE Cable all complete as per the direction of Engineer-In-Charge
209Supply, transportation and errection of Tapping arrengment for XLPE cable (except cost of pole ) all complete as per the direction of Engineer-In-Charge
210Supply, transportation and errection of G.I Pipe earthing , 40mm .dia medium gauge 3mtr long for MC all complete as per the direction of Engineer-In-Charge
211Supply, transportation and errection of 33KV PT all complete as per the direction of Engineer-In-Charge
212Supply, transportation and errection of 2.5sq.mm 10core control cable all complete as per the direction of Engineer-In-Charge(Make-Poly cab/Havels/Finolex)
213Supply, transportation and errection of 2.5sq.mm 4core control cable all complete as per the direction of Engineer-In-Charge(Make-Poly cab/Havels/Finolex)
214Supply, transportation and errection of Earthing of VCB all complete as per the direction of Engineer-In-Charge
215Supply, transportation and errection of 25X6mm GI flat for earthing for MC all complete as per the direction of Engineer-In-Charge
216Supply, transportation and errection of AI socket 70mm all complete as per the direction of Engineer-In-Charge
217Supply, transportation and errection of GI nuts &bolts of assorted size MC earthing all complete as per the direction of Engineer-In-Charge
218Supplying all material,labour,T&P for construction of Brick masonry Control cable trench with 1:4 cement mortar having 300mm width,500 mm depth including cement plastering with 1:2:4 C.C base all complete as per the direction of Engineer-In-Charge
219Supply, transportation and errection of VCB with CT foundation all complete as per the direction of Engineer-In-Charge
220Supplying all material,labour,T&P for construction of Plinth for 750KVA DTR etc.all complete as per the direction of Engineer-In-Charge
221Supply, transportation and errection of S/S boundry wall with upper part barbed wire fencing with provision of gate and metal spreading(3layer of 20-40mm size) all complete as per the direction of Engineer-In-Charge
222Supplying all material,labour,T&P for Excavation of cable trench length by providing all necessary tool. Manpower, pump etc.suitable for HT & LT cable laying ,BA will supply necessary barricades at the excavation site all complete as per the direction of Engineer-In-Charge
223Supplying and spreading filling other works with fine sand under floors,ground etc. as per EIC instruction scope of work also includes watering ramming , consolidation and dressing complete and other works if required at site all complete as per the direction of Engineer-In-Charge
224Supplying all material labour T&P for backfilling of cable excavation site all complete as per the direction of Engineer-In-Charge
225Supply, transportation and errection of Cable route maker along the cable route at an interval of 30mtr with civil works all complete as per the direction of Engineer-In-Charge
226Design,Drawing,construction of RCC frame structure 5m x 6m Cubicle Control Room of 4 M height including Blower, Exahust fan, adequate shutter arrangement,Cubicle foundation near the S/S etc.complete in all respect as per the direction of Engineer-In-Charge
227Supplying all materials,labour,T&P for Earthing pit for pipe earthing with charcoal salt etc all complete as per the direction of Engineer-In-Charge
228Supplying all materials,labour,T&P for Concreting of Stay all complete as per the direction of Engineer-In-Charge
229Supplying all materials,labour,T&P for Concreting of pole all complete as per the direction of Engineer-In-Charge
230Supplying all materials,labour,T&P for deposition of inspection fee for 33KV line with drawing approval all complete as per the direction of Engineer-In-Charge
231Supplying all material,labour,T&P for Stamp duty all complete as per the direction of Engineer-In-Charge
232ESTIMATE (METER ) Part-IISupply, transportation and errection of 33KV Metering cubicle(with suitable CT Ratio) all complete as per the direction of Engineer-In-Charge
233Supply, transportation and errection of HTTV meter with box all complete as per the direction of Engineer-In-Charge
234Supply, transportation and errection of of AMR Set Up all complete as per the direction of Engineer-In-Charge
235Commissioning and testing of Metering Cubicle etc. all complete as per the direction of Engineer-In-Charge
236Supplying all material,labour,T&P for Inspection fees for Metering Cubicle all complete as per the direction of Engineer-In-Charge
237Supply & Installation of 500 KVA DG Set with RCC Foundation, DG Set Sheet Shed with Pipes, Chemical Earthing- 4 nos. & Aluminium Power Cable of Required Length as per DG !NA Rating & Type and Control Cable for AMF DG Set of Required Length. This Indudes Tranportation to the Site, Trail Run with Required Amount of Diesel, CommisslOnlng, O,angeover and Anyother Instructions as perDirectlOn of the Engineer-In-Charge.
238Providing & Fixing of IK07 IP 66 protected LED Street Light Luminaire on existing bracket/pole. Fixture made of powder coated single piece pressure die cast aluminum LM6/ ADC12 material with heat dissipation fins on housing with UV stabilized PC/Toughened Glass cover (UV stablzation report submitted for UV cover ) and secondary lens on each LED & should be SMD type . The System level Luminaire efficacy >=120 lm/ wt with High Power LEDs is to be used and potted driver must be potted & has a unique BIS R number with Input Voltage AC 120 to 270 V AC with High voltage Cutoff @>=300 V AC and Auto resetting Safety ,Input Frequency 50Hz±3% Power Factor >0.95 driver Efficiency >85% ,THD(I) 70 and CCT 5700K +355K. Surge protection shall be min ≥ 4 KV internal and min 10 KV external. driver should be Phase to phase protection of 440 V for 4 Hrs. Manufactures Word Mark/Name Engraved/Embossing on die cast housing to allow traceability/authenticity. Fixture shall be AS PER IS 10322 Complianced.LED Street Light fixture 60 Watt
239Supply and erection of M.S. Galvanized Octagonal pole ( as per BSEN 40-3-3:2003 /BSEN 10025/IS 2062 IS:875 Part-1 – 2015/ for MS plate for base flange )of following length and dimension as per table P-01 with base plate on the cement concrete foundation of M20 grade (1:1.5:3) as per IS 456/IS 2911. with the help of anchor bolts of grade 6.8 (IS: 1367 P III ). The pole shall have a weatherproof flush door and locking arrangements. complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure\\"A\\" attached with this BSR .Octagonal MS Poles made of S-355JO grade steel sheet , folded lengthwise to obtained Octagonal shape, having single longitudinal seam weld and hot dipped galvanised internally & externally in accordance with IS 2629(5.0METER HEIGHT)
240Supply, Installation of Chemical earthing with crystaline conducting material for back fill compound & installation of maintenance free eathing electrode with ISI mark 25mm dia Electrode as secandary electrode with wall thickness of 2.6mm and the primary earthing electrode will be 25mm x 6mm hot dipped galvanised strip filled with a highly conductive & non corrosive compound inbetween the primary earthing & the secandary earthing.A solid G.I base plate of 300x 300mm seals the unit at the bottom. ground filling compound will be provided in 25kg per bag -2nos exavation of earth pit refilling precast RCC chamber with lid etc. all complete as per the site requirement earthing system (Two nos of earthing for panel Two nos of meter connect to GI flat as per design consulted with 150kg
241Design,Drawing & Construction of Electrical and MCC Control Room (12X6) One Storey Building, complete in all respect as per technical specification and as per direction of Engineer-IN-Charge.
242PLC PANEL & AUTOMATION SYSTEM AT INTAKE WELLSupply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit being operrated remotely from Intake, with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard make. (Schneider/Siemens/Rockwell)
243Supply, Installation and commissioning of single phase 2KVA online UPS with pure sine wave & float cum boost charging with battery rack and maintenance free battery system including cables power plug, switch etc. all Complete Works
244Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
2458 Port Ethernet Switch With Power Supply, Duly Wired In Box, Suitable For Out Door Duty
246Gigabit SFP to RJ45 Fibre multi Media Converter | Fibre to Ethernet Converter | 10/100/1000Mbps RJ45 Port to 1000Base-LX Dual-Mode Fibre (Make - Delink or equivalent)
247OFC Splicing with pigtails
248Fibre Pigtail/patch cord 1 mtr
249SM(OS2) Duplex Patch cord 10mtr LC-SC,PC type
250SM(OS2) Duplex Patch cord 3mtr LC-SC,PC type
251Provision of Pressure transmitter make - WIKA S-10, 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at raw water rising main, including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.
252LAYING OF HDPE PIPE :Laying of HDPE Pipe by HDD method using HDD machine upto 90 mm dia including hire charges of HDD machine,operator,POL lubricant etc.excluding cost of pipe.
253Supply and Laying of 40MM OD (8Kg/cm2)dia HDPE pipe (Make: Supreme/equivalent) in cable trench as per specification and directions of Site Engineer / Engineer-in-Charge.(excluding earth work)
254Supply and Installation of pre-fabricated Joint Box with lid for OFC loop and termination including labour as per telecom specification and directions of Site Engineer / Engineer-in-Charge.
255LAYING OF OFC CABLE:Supply and Laying of 12 core enamoured Optical fibre cable ( OFC. Fibre glass with F-G 62.5/125micron, 2.6DB/KMF600) to various sites through HDPE pipe /in Air ( pole to pole ), relaying testing of each cable drum for each fibre and tahing the OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/Site Engineer.
256Supply and Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/Site Engineer.
257Automation of WTPProvision of pressure transmitter make:- WIKA S-10,0-10BAR with snuber of 316 grade & isolation ball valve with tube at raw water rising main, including cost of all materials, Transportation to site etc all complete.as per the direction of Engineer-In-Charge.(CWRM)
258Supply & Installation of insertion type water Quality analyser with all accessories , mounting bracket with required cable to be installed at raw water open channel with following tevhnical specification :- (A)-pH Analyser, Measurement range-pH 0 to 14, Process temperature-0 to 135 C (32 to 275 F), Process pressure- 1 to 17 bar (15 to 246 psi), (B)- Turbiditry Analayser, Measurement range-0.000 to 2000 NTU, Process temperature: 0 TO 60 C, Proces pressure: 0 to 4 bar, Make- Forbes Marshall, Tethys, Horiba,Siemens
259CONTROL ROOM PLC FOR WTP OPERATION: Supply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit being operrated remotely from 8 MLD WTP campus, with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard make. (Schneider/Siemens/Rockwell)
260Supply, Installation and commissioning of single phase 2KVA online UPS with pure sine wave & float cum boost charging with battery rack and maintenance free battery system including cables power plug, switch having application in 24V lot DC Battery (drytype) charging to output continious 3 hrs power backup all Complete Works
261Supply,Installation & Commissioning of SCADA software (Make-Schiender/Simens/Fox) with Graphical processor visualisation Advanced alaram management, historical and Real time trending, Built-in-reporting, Stastical process control,Multithreaded citect VBA and Cicode programming language including supply, installations of Desk top PC, Modem for receiving data, UPS etc all complete.
262Supply,Installation & Commissioning of SCADA PC Lenovo commercial DesktopI5 12gen /8gb/1tb/w11 professional/24\\" display for engineering station
263Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
264Supply, Installation & Commissioning of 43\\" LED TV for SCADA PC Extension for operator station
265Laserjet black & white Printer
266Gigabit SFP to RJ45 Fibre multi Media Converter | Fibre to Ethernet Converter | 10/100/1000Mbps RJ45 Port to 1000Base-LX Dual-Mode Fibre (Make - Delink or equivalent)
26724 port fibber optic panel or light interface unit (LIU) draw out Type
268OFC Splicing with pigtails
269Fibre Pigtail/patch cord 1 mtr
270Optical fibber 8-port managed L3 gigabit fibber switch and media converter for non-blocking throughput switching, high performance and low latency, Gigabit Ethernet SFP and RJ45 ports (Make- Dig sol- SG-GS4600FSE or equivalent
271SM(OS2) Duplex Patch cord 10mtr LC-SC,PC type
272CAT-6 Dlink cable
273Laying of CAT-6 cable either in HDPE duct underground or GI wire support
274Internet Modem with static IP for data communication
275Supply of Level Transmitter to be installed at Clarifier (1 no. each) with following specification:Range= 0 to 5 mtr, Type =Ultrasonic / Radar, Power Supply- Loop Powered 24V DC, Out Put=4-20mA Make- Vega, Techtrol, Forbes Marshall(CWR,Back wash tank)
276Supply, installation, testing & commissioning of Chemical earthing System with Backfill compound covered with earthpit and cover including transportation to site, unloading etc. all complete as per direction of Engineer-in-charge
277Control Desk -1 no., Table - 1 no. & Chairs - 2 nos. at Control Room
278CABLETRENCH: Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.2metres or bellow towards laying of 40mm dia HDPE pipe along water Pipeline including backfilling the trench, job complete in all respects, including all labour and materials complete as per specification and directions of Site Engineer /Engineer-in-Charge.
279HDPE PIPE: Supply and Laying of 40MM dia HDPE pipe (Make: Supreme/ equvalent) in cable trench or buried as per specification and directions of Site Engineer / Engineer-in-Charge.
280Supply, Installation and commissioning of Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. as per specification. all Complete Works Screened cable unarmoured1.5 sqmm 8 C CU AR Shielded Cable(Instrumentation Cable)
2811.5 sqmm 4 C CU AR Shielded Cable(Flow Meter)
2821.5 sqmm 2 CU AR Shielded Cable(PT,LT)
283Supply, Installation & Testing of the 25x5mm Earthling strip Along The Cable Trenches or Cable Trays or Fixing to Walls (by Using Proper Size of Spacer and Saddles ) or Structures or buried individually in paved/ unpaved areas (minor civil work like chipping of paved surface finishing after laying grounding loop, etc. Welding at joints, providing anti-corrosive paint for Welded portion, clamping & necessary hardware for connection, excavation & refilling, etc. including provision for risers at places as per approved drawings, all labour to be considered in installation work ) including Earthling saddles, clamps ,terminal ,lugs etc. & all other required materials all complete as per specification, drawings and direction of Engineer-in-charge
284Supply, Installation and commissioning of cable tray 80mm width to wall, celling with necessary bracket, for laying of power and data cable etc. as per specification. all Complete Works
285FILTER BED PLC CONTROL CONSOLEPLC Based Rapid Gravity Filter Bed Automation Control PLC Panel with following specifications:Supply,,Design,Manufacturing Installation, Testing, Programming, Wiring & Commissioning of PLC panel Made out of 2 MM CRCA sheet, PLC Pannel with encloser size as required, Duly Powder coated, Floor standing, Front operated, complete with interconnection with copper wire and lugs, having Type 2-1P+N 15kA Surge protection device- 1Nos, 32A 15KA MCB - 1 no, DC powered Transistor/Relay based 24DI and 16DO Ethernet PLC Module, 35 Micosecond Response time for DI/DO Switch on/off, 8ch Analog input module- 2 Nos having 1ms per channel conversion/sampling time. 4Ch Analog Output module - 2 Nos having 1ms per channel conversation/ stabilisation time. Ambient air tempature upto 550C. with 10\\" HMI having 2 ethernet, USB host & device 24VDC type- 1 Nos (Make- Siemens, Schneider, Allen Bradly). Rated DP Separate DC MCB for Indivisual Modules. 24VDC IO type slim Relay with Led for Digital out put - 16 Nos. 5 Ch Unmanaged Industrial Grade Switch- 1 Nos., 4G ethernet TCP/IP-Modbus Industrial Grade GSM Router - 1 Nos (make- Robustel, Teltonika). 1.5 mm Fuse TB with 0.5A glass fuse with Fuse blown indicator type Terminal Block for Digital Input/analog output- 60. 1.5 mm Terminal block for Digital Output - 40Nos. (Make- wago,Phoenix Contact). 24VDC powered signal isolator for Analog Input - 16 Nos., 24 VDC 6amp redundent Power supply Unit with input and output DC MCB - 2Nos ( Make- Wago, Phoenix Contact, Siemens, Schneider), Color Coded Terminal Blocks for AC/DC/earth Bus/TB - 50 Nos.(Make- Wago, Phoenix Contact, Connectwell), 2/4/6 Amp AC/DC MCB- 6nos All switchgear and controlgear make- Siemens, Schneider, ABB, C&S, L&T. All completed as per electrical specification and as per direction of EIC.
286Supply, Installation and commissioning of LT surge arrester having 5KA capacity with Spike and all accessories including cost of all materials, labour, T & P etc all complete.
287Gigabit SFP to RJ45 Fibre multi Media Converter | Fibre to Ethernet Converter | 10/100/1000Mbps RJ45 Port to 1000Base-LX Dual-Mode Fibre (Make - Delink or equivalent)
288For Clear Water outletSupply & Installation of insertion type water Quality analyser with all accessories , mounting bracket with required cable to be installed at raw water open channel with following tevhnical specification :- (A)-pH Analyser, Measurement range-pH 0 to 14, Process temperature-0 to 135 C (32 to 275 F), Process pressure- 1 to 17 bar (15 to 246 psi), (B)- Turbiditry Analayser, Measurement range-0.000 to 100 NTU, Chlorine analyser,Process temperature: 0 TO 60 C, Proces pressure: 0 to 4 bar, Make- Forbes Marshall, Tethys, Horiba, Hach
289Provision of Pressure transmitter make - WIKA S-10, 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at clear water rising main, including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.
290Installation, commissioning & Supplying all labour, T & P for PT along with snubber and needle valve, 1.0 sq.mm 2 core copper braided screen cable Wire, screw, grip & clamp for DI / MS pipe fitting.
291Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete incluiding 30 mtr Screened cable including cost of materials , all labours, T&P etc. all complete as per the direction of Engineer-in-charge.
292Supply, installation, testing and commissioning of Electromagnetic Flow Meter (EMF) As Per ISO 4064, for Raw/Pure water with accuracy +/- 0.5% of measured value & protection as per given specifications for size 100mm to 1000mm including sensor, transmitter, surge protector, cable GI duct if suitable size 25mm and power supply of flow meter must be 24V DC, 24V DC SMPS with MCB, Surge Protection Device, GSM/GPRS modem (with Simcard suitable for available telecom network and its charges valid for 36 months) including the pipe cutting, levelling and installation of flow meter in the pipelines with necessary tool tackles, cranes including 36 months gurantee, flow meter data dashboard must be prepared web based applicable which can be accesible from anywhere over internet etc complete, as may be required at site & based on technical specifications (Make: Krohne Marshall/ ABB/ Siemens/ Adept Fluidyne/ Toshniwal/ Emerson/ E&H/ Yokogawa).350mm (CW Common Delivery) dia Full bore type Electro Magnetic Water Flow meter
293500mm (WTP inlet) dia Full bore type Electro Magnetic Water Flow meter
294600mm (Intake common delivery) dia Full bore type Electro Magnetic Water Flow meter
295Supply & installation of Actuator with following technical specification as a part of auto wash of filter bed : -Water Tight to IP68 to IEC 529, Naturally cooled, Motor Data: a) Voltage / Phase / Frequency, b) Admissible voltage fluctuation, c) Admissible Frequency flucation, d) Admissible voltage & frequency filuation 715V , 3 phase, 50Hz, Actuator internal / external control panel & fittings, Make: Auma / Rotork300mm Actuator
296supply and installation of 5star AC having 2Ton capacity all complete as per the direction of Engineer-In-Charge.
297Providing, erecting Electric Valve Actuator for non rising spindle type sluice valve of PN 1.6 rating, totally enclosed, weather-proof and dust proof construction with IP-67, protection class suitable for installation in any position without lubrication, leakage or other operational difficulty with special grease filled gear box and hand wheel for emergency manual operation which will automatically dis-engage on restoration of power to motor and with 10 watt single phase space heater and continuous local mechanical position indicator and individually replaceable counter gear assembly and with two torque and four limit switches with S.S. flap and operated with gear driven cams and of rating 250 Volt, 5 Amp, AC/DC, torque switch dial and with TEFC squirrel cage induction motor working on 440 Volts +/- 10%, 3 phase, 50 Hz AC of intermittent duty rating S2, insulation class \\"F\\" and temp rise restricted to class \\"B\\" with IP - 67 protection class suitable for DOL starting and with three thermostat and 30% over load margin. The torque rating of reduction gear box shall be atleast 1.5 times max. torque required for opening and closing of valve with integral starter for ON & OFF operation (Make-VAG/AVK/Hawle, Actuator make- Auma/ Rotork)150mm dia(Gate Valve) PN-1.6
298250mm dia(Gate Valve) PN-1.6
299300mm dia (Gate Valve) PN-1.6
300350mm dia (Gate Valve) PN-1.6
301400mm dia (Gate Valve) PN-1.6
302450mm dia (Gate Valve) PN-1.6
303600mm dia (Gate Valve) PN-1.6
304SCADA and Automation work to ESRs,GSRs and Distribution systemDesigning, Supplying, Installing,Commissioning & testing of Flow Control Valve / Pressure reducing valve for inlet with flow measuring, flow controlling, pressure monitering & webbased with cable, PLC etc. complete. Hydraulically operated self-actuated Flow & Level Control Valve (either with float or altitude pilot) with downstream orifice having Ductile Iron valve body, Y-Pattern, Double chamber unitized actuator,Fusion bonded Epoxy coating,Copper control tubing, with Latching Solenoid & Pilot operated as per design, additional Speed control feature, drip tight sealing, In-line serviceable, Internals Stainless steel & protected diaphragm suitable for drinking water WRAS/NSF/DVGW approved.
305250 mm dia(Line Pada)
306Supply, installation, testing & commissioning of DI Pilot Altitude flow control valve of double chamber (Globe Type) with orifice plate for purpose to close valve at maximum water level of ESR & open to refill the ESR At lower altitude control valve should be worked at minimum pressure 1kg/cm2. An altitude control valve control at level of a tank. The altitude valve will remain open while the tank is not full and it will close when the tank reaches its maximum level. the opening & closing the valve will work without external power sources(electric, pneumatic or man power). it will work automatically. the body, spool & cover will be DI ASTM A-536 standard, spring, steam, jam nut, cover bolt, & cover waser should be SS, DI/SS Diaphragm plate Nytrill/Nylon Diaphragm, Brozen Cover Bushing, Seat plate & ring, The Approved Make: (ADEPT/VAG/SINGER/BURMAD-700/DORT-S300) with 2nos solenoid including cost of all materials with all taxes transportation to site/storage with insurance.250 mm dia.(WTP ESR)
307Providing, Erecting Electric Valve Actuator for non rising spinle type sluice valve of PN 1.6 rating, totally enclosed, weather proof and dust proof construction with IP-67, protection class suitable for installation in any position without lubrication, leakage or other operational difficulty with special grease filled gear box and hand wheel for emergency manual operation which will automatically dis-engage on restoration of power to motor and with 10 watt single phase heater and continuous local mechanical position indicator and individually replaceable counter gear assemble and with two torque and four limit switches with S.S. flap and operated with gear driven cams and of operated with gear driven cams snd of rating 250 Volt, 5 Amp, AC/DC, torque switch dial and with TEFC squirrel cage induction motor working on 440 Volts +/- 10%, 3 phase, 50 Hz AC of intermittent duty rating 32, insulation class \\"F\\" and temp rise restricted to class \\"B\\" with IP-67 protection class suitable for DOL starting and with three thermostat and 30% over load margin. the torque rating of reduction gear box shall be atleast 1.5 times max. torque required for opening and closing of valve with integral starter for ON & OFF operation (Make: VAG/AVK/Hawle Actuator make- Auma/Rotork)250 mm dia(Gate Valve)
308300 mm dia(butter fly Valve)
309Supply,Fitting and Fixing of Solenoid Operated On/Off Valve with Timer Controller -Designing, Supplying, Installing, Commissioning & testing of Solenoid operated hydraulically controlled On/Off Valve with Timer Controller for ESR outlet with time based On-Off application which performs Opening and Closing operations on pre-set timings. The valve should offer minimum restriction while allowing the flow inclusive of all the accessories like inbuilt timer controller, batteries etc. complete as per given specifications .The Approved Make: (ADEPT/VAG/SINGER/BURMAD) with 2nos solenoid including cost of all materials with all taxes transportation to site/storage with insurance.150 mm dia
310200 mm dia
311250 mm dia
312Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete incluiding 30 mtr Screened cable including cost of materials , all labours, T&P etc. all complete as per the direction of Engineer-in-charge.In Sub-DMA
313Provision of Pressure transmitter make - WIKA S-10, 0-10 BAR with snuber of 316 grade & isolation ball valve with tube at clear water rising main, including cost of all materials, Transportation to site etc all complete. as per the direction of Engineer-in-charge.
314Level transmitter Designing, Supplying, installing, commissioning & testing of Ultrasonic level transmitter CE marked at each filter bed with following technical parameters Interfacing with PLC panel including mounting arrangement all complete as per specification and direction of Engineer-in-chargeRange- 0 - 5 mtrsOutput-4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.25% of Full Scale or better Enclosure- IP 68 to be installed at settling tank Make :-Vega, Techtrol, Forbes Marshall,Siemens
315Residual chlorine analyser Design, Supply, Installation,Testing of Residual chlorine analyser / meter must have automatic sensor cleaning facility at pure water sump and Interfacing with PLC panel. Residual Chlorine meter shall comprises of 3 components i.e. sensors,flow through assembly and transmitter with indicator and gives 2 outputs one to Local display & other to PLC including Mounting arrangement. Overall Range : 0 ‐ 8 mg/l (ppm) Accuracy : 2% of full scale Supply Voltage : 230 V ac Each 256718 17602 274320 ‐ Supply Voltage : 230 V ac Output : 4‐20 mA Membrane free sensor of 2 gold plated electrodes for long term stability and reference electrode (ag/Agcl) must be provided to avoid maintenance. IP 65 Nema 4 housing protection class required.all complete as per the direction of Engineer-in-charge.make (Forbes Marshall/Tethys/Horiba/Hach)Tail end in the Sub-DMAs
316Supply, installation, testing and commissioning of Electromagnetic Flow Meter (EMF) As Per ISO 4064, for Raw/Pure water with accuracy +/- 0.5% of measured value & protection as per given specifications for size 100mm to 1000mm including sensor, transmitter, surge protector, cable GI duct if suitable size 25mm and power supply of flow meter must be 24V DC, 24V DC SMPS with MCB, Surge Protection Device, GSM/GPRS modem (with Simcard suitable for available telecom network and its charges valid for 36 months) including the pipe cutting, levelling and installation of flow meter in the pipelines with necessary tool tackles, cranes including 36 months gurantee, flow meter data dashboard must be prepared web based applicable which can be accesible from anywhere over internet etc complete, as may be required at site & based on technical specifications (Make: Krohne Marshall/ ABB/ Siemens/ Adept Fluidyne/ Toshniwal/ Emerson/ E&H/ Yokogawa).150mm dia(ESR Delivery In Sub-DMA)
317200mm dia(ESR Delivery In Sub-DMA) & ESR Filling
318250mm dia(ESR Delivery In Sub-DMA)
319Supply, Installation of chemical earhing with cryslaline conducting material for back fill compound and Installation of Maintance free Earthing Electrode with ISI mark G.I pipe dia 50mm as Secondary electrode with wall thickness of 2.6mm & the primery earthing electrode will be 25mm x 6mm hot dipped galvanised strip filled with a highly conductive & non-corrosive compound in between the primary earthing & the secondary earthing. A solid G.I based plate of 300 x 300 mm seals the unit at the bottom ground silling compound will be provided in 25 Kg per bag-2 Nos. Excavation of earth pit refilling.Precast RCC chamber with lid etc all complete as per the site requirment.In ESR zones
320CONTROL ROOM PLC FOR ESR(DMAs zones) OPERATION: Supply ,Design,Manufacturing all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit being operrated remotely from ESRs campus, with provision of PLC panel for operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through GPRS only and/or integration of SMS communication system for the operation (on & off) of remote station pump house as per the UGR water level. Local data storing facility should be there and as per the future expansion the data should be stored through an application in the server for monitoring and analysis at remote places as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard make. (Schneider/Siemens/Rockwell)
321Supply fitting & fixing of different dia MS Flange ,thickness-11-12 mm150mm dia
322200mm dia
323250 mm dia
324Supply ,fitting & fixing of DI Flange Socket Tail piece for different dia pipe 150mm dia
325200mm dia
326250mm dia
327Flame cutting and facing of MS plate or pipes upto 8mm thick including supply of all labor, material, tools & plants for following plate thickness all complete as per specification and direction of Engineer-in-Charge.
328Cutting of C.I /DI pipe by eletric arc welding,at site including cost of materials,labour,T & P etc all complete
329Providing joints by welding with two welding beads/pass, conforming to IS:816-1998 (Fillet weld) to MS pipes and fittings at site by using welding generator including testing of joints, as per specification complete
330Construction of valve controlling RCC Chamber Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge.
331Filling in foundatin and plinth with sand watered and rammed including cost of sand & labour
332Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete .
333Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.R.C.C. Foundation, Plinth Band, Footings, Bases of Columns, Mass Concrete & Precast Slabs etc
334R.C.C work in ground floor of M-25 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .
335Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.Taking @ 1.0Qtl/cum
3365 Year Annual maintenance (Including contribution towards EPF, ESI, Labour cess, Contractors Profit & OH Charges but excluding cost of Energy charges)Electrification/DG at Intake and WTP -Supply of 01 No electrician(highly skilled)for daily maintenance of the internal electrical infrastructure, including DG sets and the substation premises beyond the scope of TPWODL maintenance which include fault detection and rectification of electrical components, ensuring restoration within 24 hours to maintain uninterrupted power supply to the pump houses as per the instruction of Engineer-in-charge.SCADA & Automation at intake and WTP Supply of 01 No SCADA operator ( highly skilled), 01 No SCADA assistant(skilled) and 01 No Electrician(highly skilled) for the operation and maintenance of all instrumentation and automation systems which includes regular monitoring and updating of SCADA software, maintenance of data communication and signal systems, fault identification and rectification of electrical/instrumentation issues within 24 hours, and preparation of daily reports on water quality ,electrical parameters and the online report shall be mailed daily to headquarter for daily monitoring purposes and all should be complete as per the instruction of Engineer-in-charge. Please Enable Macros to View BoQ information

Other Detail

Information Source http://tendersodisha.gov.in/nicgep/app
Download FileName File Description File Size
Download 3d967649-736c-4cd5-b2b4-136fd3bfe45d.html Tender Documents 0 KB
Download BOQ_589531.xls Tender Documents 0 KB
Download DTCN.pdf Tender Documents 0 KB
Download Tendernotice_1 (6).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.