| 1 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) |
| 2 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) |
| 3 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) |
| 4 | Renforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth, level up to floor five level, including cost of centering, shuttering, Finishing and Reinforceement with 1:1½:3 {1 cement : 1½ coarse sand (zone-III): 3 graded stone} |
| 5 | R.C.C. work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1 Cement : 1.5 Coarse Sand : 3 Stone Grit) in R.C.C. column. (SI No. 289) |
| 6 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) |
| 7 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) |
| 8 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 Cement : 4 Coarse sand.(Chapter No.13 Si.No.582(ii)) |
| 9 | P/L GSB with graded stone ballast with stone grit size stone ballast with hand ramming watering including all material labor T&P etc.all complete (NS) |
| 10 | Supply & fixing of pre-cast M-30 cement concrete RUBBER MOLD INTERLOCKING TILES over 40mm thick local sand bed, with 3mm thick joints filled with local sand including leveling, tempering and sweeping etc., interlocking bricks will be as description given in direction issued by the IRCSC-03-2004 and should be ISI marked all complete. 80mm thick, Strength should not less than M-30. (tiles I shape decided by Engineer-in-charge with ISI Mark) (Chater No. 20 Si.No.17E) |
| 11 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-15 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter Sr.No.6 Si.No..4.1.3) |
| 12 | Finishing Wall Putty Aproved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all material. (15-Chapter Si.No.27 New) |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 Itr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. (Chapter No.15 Si.No.17) |
| 14 | Mild steel of iron in heavy size such as trusses built up gates record reck, roof work gates etc. brought to required form including drilling holes revitting are welding where neccesary, and also including supply of steel bolts , nuts wastage etc. and there fixing required for completion of the work. (Chapter No.10 Sr.No.2) |
| 15 | Sub Total |
| 16 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 17 | Grand Total Please Enable Macros to View BoQ information |