| 1 | PAIPE LINE WORK |
| 2 | Supply of following sizes P.V.C. Pipe for distribution system conforming to latest/relevant Specifications with all jointing materials and specials conforming to latest/relevant I.S. specifications including F.O.R. destination and all taxe sand insurance etc. with loading unloading but excluding the cost of trenches all completeas per instructions of Engineer -in - charge. |
| 3 | Supply of P.V.C. Pipe specials as per conformation to I.S.S. suitable for above P.V.C. Pipe F.O.R. destimation including all taxes and insurance |
| 4 | Excavation of earth in ordinary soil (loamclay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the Trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer-in-charge. (OD+600)mm |
| 5 | Carting from store (upto 8Km. or with in municipal limit which is more) following sizes of P.V.C. Pipe pipes, specials coupling (Electrofusion), fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines (excluding trenching), but including cutting of pipes for making joints. |
| 6 | Making Nali crossing falling on alignment of pipe line including cost of D.I. pipe one no.(5.50m length) including supply of all materials, labour, T&P, etc complete required for proper completion of work. |
| 7 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. And also including temporary reinstatement of road by old materials. |
| 8 | Inter locking tile Road |
| 9 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. |
| 10 | Inter locking tile Road |
| 11 | Road Crossing-Excavation in foundation of trench of proper size in soil mixed with moorum, Shingle, Kankar, softrock, hardrock, including refilling, dressing and ramming earth or sand or bajri, ballast, including providing, supply, carting, lowering, laying and jointing of casing pipe of Ductile Iron with appropriate size, with rubberring joint, sand filling in gap inside pipe, insertion of distribution pipe into the encasing pipe including supply of T&P, including concrete of 150mm thick in with 40 mm gauge brick ballast local sand and cement in proportion of 8:4:1, provision for barricading, labour for traffic diversion etc. Complete for proper completion of work as per instruction of Engineer. |
| 12 | Supply of single/double ball type Sluice valve conforming to latest/relevent I.S. specifications including all taxes and insurance, complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. 50 m |
| 13 | Carting from store to site of works (upto 8Km. or with in municipal limit which is more) of following sizes screwed down Sluice valve to site of work, fixing in position including boring and threading in the main etc. complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 14 | Supply of all materials, labour T&P etc. and construction of Sluice valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 15 | Open Tembering work (0.00 to 3.00 m Deep.) |
| 16 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to ourt wall of house, with supply of 1 m G.I. Pipe (15 mm) (above ground) & average 5 mtr. MDPE pipe (20 mm) ((below ground) including specials, saddle, Tap etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instruction of Engineer as per Dwg. 12 ( excluding road restoration) |
| 17 | Extra charges for flow control valve for each FHTC |
| 18 | Shifting of existing services like pipe line, under ground cable etc during the execution of work as per requirement Please Enable Macros to View BoQ information |