| 1 | JHARKHAND URJA SANCHARAN NIGAM LIMITED Tender Inviting Authority:- General Manager, Transmission Zone-IV, Medininagar Price Part (Part-II) e-NIT No. 60/PR/JUSNL/2026-27 Name of Work Annual maintenance work of 400/220/132 KV Grid Sub-Station, Latehar for the period from 01.07.2026 to 31.12.2026 Name of the Bidder S.No. Description Unit Qty. Approved Rate (Rs) Amount(Rs) |
| 2 | Supply of Manpower For Preventative / Routine Maintenance of Grid Substation as per schedule provided by Engineer Incharge. a Highly Skilled ( Experienced Electrician / Technician) Mandays 6.0 20879.17 125275.01999999999 b Skilled ( Electrician / Technician) Mandays 6.0 18075.05 108450.29999999999 c Un-skilled Helper Mandays 12.0 13088.1 157057.2 |
| 3 | Mobilisation of Lobour (one gang should consist of 20 person) in special case. |
| 4 | Erection, Connection, Testing & Commissioning all Complete work : (i) Erection, Connection, Testing & Commissioning of 400 KV C.B. Nos. 1.0 100249.11 100249.11 (ii) Erection, Connection, Testing & Commissioning of 220 KV C.B. Nos. 1.0 100249.11 100249.11 (iii) Erection, Connection, Testing & Commissioning of 132 KV C.B. Nos. 1.0 42458.45 42458.45 (iv) Erection, testing and commissioning of 400 KV CT/CVT Nos. 1.0 10614.61 10614.61 (v) Erection, testing and commissioning of 400 KV LA Nos. 2.0 3302.08 6604.16 (vi) Erection, testing and commissioning of 220 KV CT/ CVT. Nos. 1.0 10614.61 10614.61 (vii) Erection, testing and commissioning of 132 KV CT/ CVT. Nos. 1.0 7549.0 7549.0 (viii) Erection, testing and commissioning of 220 KV LA. Nos. 2.0 3302.08 6604.16 (ix) Erection, testing and commissioning of 132 KV LA. Nos. 2.0 3302.08 6604.16 |
| 5 | Dismantling of following equipments at site. (i) 400 KV CB includig cable termination Nos. 1.0 60149.47 60149.47 (ii) 220 KV CB includig cable termination Nos. 1.0 60149.47 60149.47 (iii) 132 KV CB includig cable termination Nos. 1.0 25475.07 25475.07 (iv) Dismantling of 400 KV CT/CVT Nos. 1.0 6368.77 6368.77 (v) Dismantling of 400 KV LA Nos. 2.0 1981.25 3962.5 (vi) 220 KV (1 PHASE) CT or PT including cable termination Nos. 1.0 6368.77 6368.77 (vii) 132 KV (1 PHASE) CT or PT including cable termination Nos. 1.0 4529.4 4529.4 (viii) Dismantling of 220 KV LA. Nos. 2.0 1981.25 3962.5 (ix) Dismantling of 132 KV LA. Nos. 2.0 1981.25 3962.5 |
| 6 | Engagement of Hydra/ Crane for routine/breakdown the maintenance work in the GSS whenever required Add. Hrs. 20.0 2100.0 42000.0 |
| 7 | Transportation of equipments/materials by up to 6 MT truck from Transmission Central Store Namkum or Other GSS/Sites within 200 KM radius to GSS Latehar. |
| 8 | Transportation of equipments/materials by up to 6 MT truck from Stores/GSS within 100 KM radius to GSS Latehar. |
| 9 | Provision of self propelled manlift with operator and their labour & statutory compliances for maintenance work in Switchyard equipments and Power Transformers. |
| 10 | Loading, unloading, Mobilisation and Demobilisation Charges for the self propelled manlift. |
| 11 | Provision of fuel for man-lift @ 4 litres/ hour for 120 hours. |
| 12 | Provision of fuel for 250 KVA DG set @ 24 litres/ hour for 60 hours. |
| 13 | Assessment of battery charger at 400/220/132 KV GSS, latehar |
| 14 | Maintenance and replacemnt of defective parts/ equipments of battery. |
| 15 | Testing transfomer oil by recognized laboratory including supply of sampling bottle a BDV Nos. 16.0 1722.11 27553.76 b DGA Nos. 16.0 8404.36 134469.76 c Contingency (To & Fro Charges including fooding & lodging) Nos. 8.0 4100.0 32800.0 |
| 16 | Repair and Overhauling of 3 ph Submerisble pump set including cost of materials, lifting & lay down of Submersible pump from bore well, repair of water supply pipe all complete job and Transportation cost. |
| 17 | Rewinding and overhauling of 3-phase motor of motorised isolator/ earthswitch, including dismantling and erection. |
| 18 | Rewinding and overhauling of 1-phase spring charging motor of SF6 circuit breakers including dismantling and erection. |
| 19 | Repair and overhauling of Fire fighting pump |
| 20 | Preventive & periodic maintenance of DG set including all necessary consumables used in maintenance |
| 21 | Supply of Consumables viz. Markin cloth, Cotton waste, cable lugs, cable ties, Brush, torch cell, Petrollium Jelly, Grease, Petrol, lubricant, WD-40 rust remover, etc., whatever required time to time for O&M work of G/S/S. |
| 22 | Repair / servicing / ovehauling of vacume pump of 400 KV C.B. |
| 23 | Air Conditioner (Split, tower and Casette type) Maintenance. In single tower type unit there are two units of AC, so for maintenance two nos. have been considered for each one tower type unit.(i) Tower Unit (x 2 nos. AC units) = 8x 2 = 16 Nos. (ii) Casette Type = 08 Nos. (iii)Split (Wall mounted) Type = 09 Nos. a Annual Maintenance with all spares Each 18.0 8000.0 144000.0 |
| 24 | Sub-Total A (Rs.) (Sl. No. 1) |
| 25 | Sub-Total B (Rs.) (sum of Sl. No. 02 to 21) |
| 26 | Tools & Tackles, Dress Code etc. @3% on Sub-Total A (Rs.) |
| 27 | Contractor Profit@10% on Sub-Total A (Rs.) |
| 28 | E.P.F. Contribution by employer @ 12% on Sub-Total A (Rs.) |
| 29 | Adiministrative Charge@ 1% on Sub-Total A (Rs.) |
| 30 | E.S.I.C. Contribution by employer @ 3.25% on Sub-Total A (Rs.) |
| 31 | Total (Rs.) (sum of Sl. No. 22 to 28) |
| 32 | Quoted value/rate on Total (Rs.) ie on Rs. 25,35,855.03 (To be quoted by bidder in digit only below or above upto two decimal places only) |
| 33 | GST @18% on quoted amount (Rs.) |
| 34 | Total after GST (Rs.) |
| 35 | Labour Cess @1% |
| 36 | Grand total (Rs.) |
| 37 | Says (Rs.) Amount in word: Note: Bidder will only quote value on Total ie. On Rs. 25,35,855.03 in above format at Sl. No. 30 |