| 1 | Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Srno. 3.16 Specification 305. |
| 2 | Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 3 | M 150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 4 | 12mm Thick plaster with cement mortar in proportion of 1:4 cement and Coarse sand over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) |
| 5 | Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand and 2 cm (3/4)\\"gauge' approved stone grit in the proportion of 1:2:4 excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all otehr materials, labour and T&P etc. required for proper completion of the work. |
| 6 | Cement Concrete in m20 complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per Sor Rate Item no 283 & 283 A & 284 A complete in all respects. |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar |
| 8 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 |
| 9 | Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. Sor No 279 |
| 10 | Providing Concrete For Preinforced concrete M-25 in open Foundations complete Asper Drawing and Technical Specification MoRTH Clauses 12.08 E Case II |
| 11 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar |
| 12 | M 150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 13 | Fabrication Supply and Fixing Of M.S Angle Mild steel or iron work in heavy sizes such as trusses; builts up gates, door, frames, record racks roof work, gates etc. wrought to required form including drilling holes, rivetting or welding where necessary, and also including supply of steel, bolts, nuts etc. & their fixing required for proper completion of the work.Sor |
| 14 | 12mm Thick plaster with cement mortar in proportion of 1:3 cement and Corse sand of over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) |
| 15 | Finishing walls with' one coat. of water' proof cement paint of approved quality of previously' old 'treated surface with this paint to give an even shade including supply of all materials, labour 'and T&P etc. required for the proper completion of the work. |
| 16 | Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes, fine steel/wood scrappers sand papering and knotting including cost of all materials, labour and T&P etc. required for proper completion of the work. S.I.No-1 Chapter 15 New Item |
| 17 | Painting first coat over priming coat (but excluding cost of priming cost) on wood or steel and other metal surface with superior synthetic enameland finish and inclucoat after first coat on wood or steel surface Please Enable Macros to View BoQ information |