|
| 1 | CENTRALIZED MATERIAL (SUPPLY) |
| 2 | 8 m. Long STP 410 SP-10 (BPHD GAL.) |
| 3 | Earthing Rod MS 20x2500 mm |
| 4 | GI wire 5mm/6 SWG |
| 5 | Stay Set GI 16x1800 mm |
| 6 | Stay Wire GI 7/3.15 mm 7/10 SWG |
| 7 | LT XLPE AB Cable 3x120+1x95+1x16 mm |
| 8 | LT XLPE Cable 1 x 70 Sq.mm |
| 9 | NON-CENTRALIZED MATERIAL (SUPPLY) |
| 10 | Dead end clamp with I Hook AB Cable SP-21 |
| 11 | LT Clamp with N&B ST Pole SP-10 |
| 12 | Stay Clamp for SP-21 with Nut & Bolt |
| 13 | Suspension Clamp with I Hook HT AB Cable |
| 14 | Stay Insulator 100x115 |
| 15 | PG Clamp |
| 16 | Piercing Connector 35 Sq.mm-25 Sq.mm |
| 17 | LT Distribution Box 3 Phase |
| 18 | AL Crimping Type LUGS 25 Sq.mm |
| 19 | MS Half Clamp for LT Distribution Box |
| 20 | LABOUR PART |
| 21 | Erection of Earthing Rod |
| 22 | Excavation of Pit for stay set |
| 23 | Erection of LT Stay Set |
| 24 | Grouting of Stay Set |
| 25 | Excavation of Pit for Pole |
| 26 | Erection of Single SP-21 Pole |
| 27 | Grouting of Pole |
| 28 | Muffing of Pole |
| 29 | Dismantling of LT line 1 P 2 W (Weasel) |
| 30 | Dismantling of LT line 2 P 3 W (Weasel) |
| 31 | Dismantling of LT line 3 P 4 W (Weasel) |
| 32 | Cartage SP-21/23 Pole, 0-20 Km |
| 33 | Cartage of Petty Material, 0-20 Km |
| 34 | Headload Cartage SP-21/23 Pole (1-3 Km) |
| 35 | Headload Cartage of Material (1-3 Km) |
| 36 | Laying of LT XLPE ABC 3x120+1x95+1x16 Sq.mm |
| 37 | Installation of LT Dist Box 3 Ph for LT AB |
| 38 | Disconnection & Reconnection of Consumer |
| 39 | Back Cartage of Petty Material 51-70 KM |
| 40 | Laying & Fixing LT XLPE Cable |
| 41 | Fixing of Suspension Clamp with I Hook |
| 42 | Erection of Dead end Clamp |
| 43 | Back Head Load Cartage of Petty Material 1-3 KM |
| 44 | Erection of Stay Clamp |
| 45 | Fixing of Piercing Connector 50-25 Sqmm |
| 46 | Fixing of PG Clamp 70-25 Sq.mm Please Enable Macros to View BoQ information |