Name of Work:- tuin xkSrecq)uxj ds vUrxZr th0th0vkbZ0lh0 uks,Mk lSDVj 52 esa ukyh dh iqfy;k o vU; fuekZ.k dk;ZA | Sl. No. | Item Description | |
| 1 | Brick Work with common burnt clay F.P.S (non modular) brick of class designation 7.5 in foundation and plint in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR 2023 S.N. 6.1.2. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 2 | 12 mm cement plaster : 1:4 (1 cement : 4 coarse sand) DSR 2023 S.N. 13.4.1. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 5.1.3. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 5:1:2. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild steel and Medium Tensile steel bars kg DSR 2023 5.22.1. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. Please Enable Macros to View BoQ information |
|