Name of Work:- Protection of reservoir at entry point of River Harabhangi at Adava of HIP. | Sl. No. | Item Description | |
| 1 | Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area and disposing off debris away from the work site, all labour charges, T&P, cess etc. complete as directed by the Engineer-in-charge | | 2 | Earth work in hard soil or gravelly soil including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 m in depth with all leads, lifts & delifts etc. complete with all labour, materials, T&P, taxes and cess etc. complete as per specification and direction of the Engineer-in-Charge | | 3 | Dumping stones for rock toe/ launching appron and packing the same to design thickness and the slopes using 30 cm and above size hard broken stones of approved quality and from approved quarry free from other deleterious materials including filling the interstices with small stones including wedges and packing surface to proper line and levels by manually or mechanically including fixing wave breakers, dewatering if any, complete with all leads, lifts, delfits, T&P, all labour, cost, conveyance, royalty, DMF, EMF, additional charges, cess & taxes of all materials excluding GST etc complete as per direction of the Engineer in charge (Measurement will be taken on finished level section ) only. | | 4 | Rough stone dry packing in aprons and revetments to designed thickness and slope using more than 30cm size hard broken granite stone of approved quality from approved quarry free from weathered skin and any other deleterious materials including filling the interstices with small stones, spalls etc and wedging with hammer and placing the surface to proper line and level, fixing key stones including dewatering, if any with all cost, labour, conveyance and all leads and lifts, royalties, DMF,EMF,additional charges, cess, taxes of all materials, T&P but excluding GST etc complete in all respect as per approved drawing, design, specification and direction of the Engineer- in- charge. Please Enable Macros to View BoQ information |
|