Name of Work:- tuin xkSrecq)uxj ds vUrxZr th0vkbZ0lh0 uks,Mk lSDVj 12 esa fo|ky; ds izkax.k esa baVjykWfdx lM+d fuekZ.k dk dk;ZA | Sl. No. | Item Description | |
| 1 | Earth work in cutting or in embankment in ordinary soil, including remming and dressing the surface to required lev vels including 1.50M. Lift and 15.00 K.M Cartage as directed by the Engineer- incharge. S I No. 253 (a), 261(c) ,231(a) Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor mount grader on prepared surface, mixing by mix in place method Tractor with rotavator at OMC, and compacting with Three wheel 80-100 KN Static Roller to achieve the desired density, complete as per Technical Specification Clause 401. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 3 | M-150 Brick Work in 1:4 one cement & coase sand in foundation and plinth including supply of all materials labour, Tools & Plants etc. required for proper completion of the work. S.I.No. 305 (a) Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 4 | laying of 80 mm thick I shaped compressed interlocking cement concrete paver block tiles. including leveling and dressing of surface up to required level and slopes filling joints with local sand i/c all. S I No 26(i) + 20.11 New item. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 5 | 12 mm thick plaster in 1:4 Cement and Coarse sand mortar over brick work minimum thickness not to be less than I cm. including supply of all materials, labour, Tools & Plants etc. S.I.No. 584 New Item. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 6 | C.C work in 1:2:4 cement coarse sand and 20 mm stone grit including supply of all materials, labour, T & P etc. SINo 279(a). Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. Please Enable Macros to View BoQ information |
|