| 1 | Dismantling of existing plaster including disposal of refuse as directed by engg. i/c. within a distance of 60mtr. |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge,including removal of rubbish atc., disposal of unserviceable material to the dumping ground. for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge. |
| 3 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loam clay or sand) including lift up to |
| 4 | P/Laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level- 1:4:8( 1 Cement:4 Coarse sand zone-III :8 grade stone aggregate 40mm nominal size. |
| 5 | Class-150 brick work in 1:4 cement and corse sand mortar of 1.25 fineless modulus mortar in foundation and plinth including supply of all materials, labour, tools & plants etc, required for proper completion of work. |
| 6 | Providing and laying of stone ballast with stone dust including water allowance for proper consolidation with hand ramming including labour T&P etc all complete. |
| 7 | providing And laying Checkered terrazo tiles 20mm averege thick marbal chips of size up to 6mm .in floorson 25 mm thick bed of morter1:1:1 etc all complete. |
| 8 | Class-150 brick work supper structure above plinth lebel upto floor to lexle (upto two story) including necessary. |
| 9 | 12mm thick cement plaster in single coat on fair side in 1:4 cement, fine sand etc all complete. |
| 10 | Providing and laying of wall putty for making wall surface smooth with labour T&P etc all complete. |
| 11 | Finishing walls with two coat of acrylic smooth exterior paint of best quality including supply of all material, labour T&P etc all complete. |
| 12 | M.S or Iron Work or Tubular Pipe of approved size by welding etc all ladger railing balcony railing etc all complation of work . |
| 13 | Painting or varnishing on iron work in large area with one priming coat and two coat of ready mix enamel paint of approved quality including supply of all material, labour tandP etc all complete. |
| 14 | Development of hedge bed Digging 0.45 mtr wide Supply and mixing of manure with soil in 1:1 Ratio Also Supply and planting of Muraya exotica plants incuding all Comlete of work. |
| 15 | Devlopment of lawn by doubling slection no-1 Grass incl. All complition of work. |
| 16 | S/F of 1.5 hp submersible pumb ISI mark 2000 Lpm. 60 mtr head i/c all etc (kirlosker/KSB/Cromption make) |
| 17 | Providing and fixing of PVC 20mm pipeand sprinkle Etc all complete. |
| 18 | Maintinance (1 year) Work of Hedge including all Complition of work |
| 19 | Maintinance (1year)Work of Lawn including all Complition of work |
| 20 | Supply and Fixing of Victorian Bench FRP as directed by Engineer in Charge including etc. all complete |
| 21 | GST 18% Please Enable Macros to View BoQ information |