| 1 | Cleaning Jungle i/c uprooting of rank vegetaion grass,bush, wood tree annd sapling of girth up to 30 cm measured at a heiight of 1m above ground level & removal ooof rubbish up to adistance of 50 m oout side the pperiphery of area cleared. Chapter no 4 SI no 259 |
| 2 | Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 5000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 with 45 -63 mm stone ballast as per Technical Specification Clause 405) |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 6 | Edging with straight over burnt bricks, laid dry lengthwise including excavation, refilling, consolidation, with a hand packing and spreding nearly surplus earth within a lead of 50 metres. SI |
| 7 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 8 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 9 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. |
| 10 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 |
| 11 | Supply and fixing information board |
| 12 | Providing and fixing of kilometere stone as per IRC-8 including painting and letter writing etc as per direction of E/I.(Km -stone). |
| 13 | Providing and fixing of Hectometere stone as per IRC-8 including painting and letter writing etc as per direction of E/I. (Hecto mt. -stone) |
| 14 | E/w in excavation in foundation in ordinary soil including lead up to 30.00 m and lift 1.50m and all labour material and T&P etc. as per SI. No. 251 |
| 15 | Concrete with 4Cm. Gauge stone ballast and Coarse sand and cement in 6:3:1 in foundation I/c all complete etc. as per Sl.No. 281 |
| 16 | M-150 class brick work in 1:4 cement & coarse sand mortar in foundation up to plinth as per SI No. 305 NS |
| 17 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(600 mm Dia Hume Pipe) |
| 18 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3 |
| 19 | 15 mm cement plaster in 1:4 cement & coarse sand in single coat on fail side of single or half brick wall for interior plastering including arises, interior rounded angles cambers and rounded angles not exceedng 80mm in grith and finish even and smooth SI. No. 13.5 Please Enable Macros to View BoQ information |