| 1 | Earth work in road diversion including all lead & lift with mannual compaction and dressing etc. including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 2 | Dismantling brick work in cement morter including stacking of material with a distance of 60 M including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 3 | Dismantling reinforced cement concrete 1:2:4 including stacking of material with a distance of 60 M including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 4 | Earth work in excavtion in foundation in ordinary soil including 30m lead & 1.5m lift with back filling including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 5 | Finishing wall with water proofing cement paint of approved manufacturers such as super snowcem durocem of required shade on uncoted wall surface (one coat over one coat) white cement primer to given shade after throughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and all cost of material on old surfac without priming. |
| 6 | Providing & laying of C.C. 1:3:6 in foundation with cement, coarse sand and stone ballast upto 20-40mm gauge including proper curing and compaction etc. including cost of all material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 7 | Providing & laying of C.C. 1:2:4 in with cement, coarse sand and stone ballast upto 20mm gauge. including proper curing and compaction etc. including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 8 | Providing & laying of R.C.C. 1:1.5:3 (M20) in with cement, coarse sand and stone ballast upto 20mm gauge. including cost of all material, labour and T&P but excluding cost of steel reinforcement for proper completion of work as per direction of Engineer-in-charge. |
| 9 | Centering & shuttering for C.C. & R.C.C. including cost of all material, labour and T&P etc. for completion of work as per direction of Engineer-in-charge. |
| 10 | Providing & laying R.C.C. 1:1:2 with cement, coarse sand & stone grit 20mm gauge including proper curing and compaction etc. including cost of all material, labour and T&P etc. For proper completion of work as per direction of Engineer-in-charge. |
| 11 | Providing and Laying of Steel reinforcement including cutting, bending, binding & placing in position including cost of all material, labour and T&P etc. for proper completion of work. |
| 12 | Providing & laying of C.C. M-25 in wearing coat with cement, coarse sand & stone grit including proper curing, compaction and all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 13 | Providing & fixing of 75 mm dia PVC pipe as a drainage spout including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer- in- charge. |
| 14 | Earth work in removing road diversion including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer- in-charge. |
| 15 | Printing/Painting/Writing of letter upto 20 cm.ht. including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 16 | Providing and applying Pre-Moulded Joint Filler 20mm thick for expansion joint including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer- in- charge. |
| 17 | Earthwork in embankment by power transported earth with a lead beyond 200m. and upto 1.00km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time as per govt. orders. |
| 18 | Shifting of dismantlled material, malba, Kuda kabaar etc including all cost of material, labour and T&P etc. required to be disposed at a distance of 10 km from Site as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |