Name of Work:- tuin xkSrecq)uxj ds vUrxZr xzke lykjiqj dyka nknjh esa tksxh eksgYys ds okYehdh dkWYkksuh fo|qr VªkalQkeZj ls ysdj cM+s ukys rd lh0lh0 jksM dk fuekZ.k dk;ZA | Sl. No. | Item Description | |
| 1 | Earth work in cutting or in embankment in ordinary soil, including remming and dressing the surface to required lev vels including 1.50M. Lift and 15.00 K.M Cartage as directed by the Engineer- incharge. S I No. 253 (a), 261(c) ,231(a) Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor mount grader on prepared surface, mixing by mix in place method Tractor with rotavator at OMC, and compacting with Three wheel 80-100 KN Static Roller to achieve the desired density, complete as per Technical Specification Clause 401. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 3 | Providing, Laying, Spreading and compacting WBM grading-3 stone aggregates of specific sizes ot water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density, complete as per Technical Specfication Clause 405. Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | | 4 | Construction of un reinforced and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other ytpe as per alause 1501.2.2 m30 9grade) 1:1.5:3) coarse sand and fine aggreagte conforming to is code 383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and approprite weight batcher using approved mix design laid in approved fixed side form work spreading the curing of concrete slabs for 14 days curing compund ( Wherespecifed ) shifting of materials & concrete etc as per si no 20.18 New Item (a) Including cost of, all material, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. Please Enable Macros to View BoQ information |
|