| 1 | Dismantlling lnterlocking tiles tiles work in floors/Roads laid in dry sand including stacking with 50 metre lead for thicknessof tile 60mm to 80mm |
| 2 | Class-150 brick work in 1:4 cement and Coarse sand (1.25 fineness modulus mortor in Foundation including supply of all material, labour and tolls and plants etc. All complete. (cp-6,S.I. No. 2) |
| 3 | 12mm cement plaster in single coat on rough site of single of half brick wall for interior plastering up to floor to level including internal rounded angles not excluding 80mm in girth and finished even and smooth. (b) 1cement : 4 Coarse sand. (Chapter No.13 Si.No. 583 (iii)) |
| 4 | Providing and laying cement concrete in l :5:10 ( Cement : 5 Coarse sand : 10 graded stone aggregate40 mm nominal size) and curing complete, lncludingcost of form work. in Foundation and floors. |
| 5 | Providing and laying in position machine batched andmachine mixed design mix M-25 grade cementconcrete for reinforced cement concrete work, usingcement content as per approved design mix, includingpumping of concrete to site of laying and including thecost of centering, shuttering, finishing but excludingreinforcement, including admixtures in recommendedproportions as per lS: 9103 to accelerate, retard seltingof concrete, improve workability without impairingstrength and durability as per direction of Engineer-in-charge.(Note i Cement content considered in this itemis @ 330 kg/cum. Excess/ less cement used as perdesign mix is payable / recoverable separately). |
| 6 | R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3) |
| 7 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars) |
| 8 | Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) |
| 9 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) |
| 10 | Carrige of Ballast, Kankar, Coal, Grit or Sand etc. by head load up to 90 meters (3 Chain only) including loading & unloading but excluding stacking. |
| 11 | Supply & Fixing Granite Board 2.5\\"x4\\" Size Display Board including Painting, Lettering etc. all complete. (None Schedule) |
| 12 | Sub Total (A) |
| 13 | Add / Deduction For Estimate Figure Amount Match |
| 14 | Grand Total Please Enable Macros to View BoQ information |