| 1 | Dismantling / Erection Work |
| 2 | Complete dismantling of 132/33 KV, 40 MVA Transformer-I&II (Kanohar & IMP MAKE ) accessories after opening of jumpers, removal of earthings and opening of cables and cable connections , dismantle of all radiators, conservator tank, oil pipe lines, all bushings, turrets, fan motors, marshalling box, RTCC panel etc. with proper gaskets along with nuts and bolts to complete the jobs satisfactorily including proper stacking. Blanking plates, nuts and bolts shall be provided by the UPPTCL. All other T&P, gaskets etc. shall be provided by the contractor at his own cost at 220 KV S/S Sirsaganj . |
| 3 | Shifting of main tank of 40 MVA, 132/33 KV Transformer-I&II (Kanohar & IMP MAKE ) make from plinth up to 20 meters distance including turning of tank, if required, including all T&P and all other works required to complete the job satisfactorily at 220 KV S/S Sirsaganj. |
| 4 | Additional shifting of 40 MVA T/F-I&II to safe distance by 5 Mtrs. |
| 5 | Dismantling of 33 KV CT (03Nos) ,132 KV LA with structure and all other associated work necessary for shifting of main tank. |
| 6 | Shifting of main tank of New 63 MVA, 132/33 KV Transformer I&II from unloading site to plinth 20 meters distance including turning of tank, if required, including all T&P and all other works required to complete the job satisfactorily at 220 KV S/S Sirsaganj. |
| 7 | Additional shifting of main tank of New 63 MVA T/F to safe distance. 5 Mtrs or part there of. |
| 8 | Complete erection of new/old & used 63 MVA, 132/33 KV Transformer I&II by shifting & erection of radiators, conservator tanks, all bushings, their turrets, connecting all pipe lines, cooling fans, motor drive mechanism of tap changer, RTCC panels, marshaling box etc. to complete the job satisfactorily including first filling of oil and topping up of transformer oil (Not circulation) in tank radiators, oil pipe lines, conservator tank etc. and all other associated works for satisfactorily completion of work. 132/33 kV, 63 MVA T/F accessories provided by UPPTCL. |
| 9 | Centrifuging of complete/fresh transformer oil in transformer in main tank and filling of balance oil into transformer by centrifuging machine to be arrenged by the contractor with skilled operator and taking the B.D.V and PPM values of the oil periodically till the required value is achieved as per direction of supervising engineer at 220 KV S/S Sirsaganj Firozabad. |
| 10 | Erection of following equipment including shifting of material/equipment from store to errection site including all other associated work to complete the job satisfactions as per direction of supervising Engineer |
| 11 | 120 KV L.A with surge counter |
| 12 | 33 KV C.T (2000/1250/1) with juction box with structure |
| 13 | Termination connection With New system of various size Control Cables (2X2.5 Sq mm, 4X2.5 Sq mm,6X2.5 Sq mm,10X2.5 Sq mm) of T/F in Marshalling Box and transformer tools to RTCC panel by providing Cable Glands, Lugs, Ferrules, Cable Ties and Lugs etc. including making necessary holes in glands plates or box wherever required, supply and fixing of cable glands of appropriate size, supply and providing ferrules and nos. for each core of cable and its termination with crimping Type Lugs of Dowell/Coma/Jackson Make and all other associated work to complete the job successfully as per technical specifications. |
| 14 | Earthing of new/old & used 63 MVA 132/33 KV Transformer body & neutral , including Marshaling Box, RTCC panel etc. with MS flat in place of dismantled equipments with 50X6 mm / 75X10 mm MS flat and connecting the same with main earthmat at two places as required including painting of such MS flats with green enamel paint above ground surface.MS flats provided by the UPPTCL. |
| 15 | Jumpering work of 63 MVA T/F with Zebra/Moose/Panther conductor all 33KV & 132KV Equipment,between LA and CT,Bushings (HV and LV) |
| 16 | Transformer Oil sample Collection, Testing of Transformer Oil at CPRI/ERDA lab Noida/Bhiwani & Finishing test Report for |
| 17 | a- Dissolve Gas analysis test-02 Nos |
| 18 | b- Breakdown Voltage test-02 Nos |
| 19 | c- Water content test-02 Nos |
| 20 | Checking and strengthening of Delta earthing for Transformer’s neutrals by additional welding and interconnections using 75X10 mm MS flat .(MS flat will be provided by the UPPTCL.) |
| 21 | Fabrication of sand storage drums for fire fighting purpose from transformer oil drum for different bay's as details below.. The work includes cutting of drums in two half. Making proper stand of 1 feet in height for the drums by MS angle of size 50x50x6 mm also providing cover on top of it by fabrication with MS sheet of size 18 SWG 650 mm, dia including straitening and bending the sheet in \\"Umbrella\\" shape. Fixing of 02 nos. MS handle in upper side (Opposite to each other). Also providing fixing arrangement of it with drums. Painting the complete drum cover with one coat of red oxide primer of good quality then painting with two coats of synthenic enamel paint in red, under side is white. Writing fire and in opposite side of top covers with white paint and all other associated work to be complete the work satisfactory. Filling the sand storage dum with Yamuna sand after placing in 132 KV and 33 KV switch yard. This complete work comprise as one job. Empty transformer oil drums shall be provided by the department free of cost & all T&P labour and required material shall be arranged by the contractor at his own cost |
| 22 | Providing & fixing of safety fire bucket 9 liter capacity as per IS standard made of heavy duty galvenised iron sheet of gauge 18 to 20 SWG. |
| 23 | Supply. Fabrication and laying of 200NB MS B Class & 25 NB dia (for Emulsitire) and 100 NB.80 NB dia (for Hydrant) C-class Gl pipe line above the ground as per drawing and specification complete with associated work like cutting bending, welding including fixing of bend/elbow. tee, socket, reducer, flanges etc icluding connecting, fixing with old Emulsifire/Hydrant equipments and pipe line. Above work also includes 03 Nos. crossing of roads and cable trenches under ground digging the earth and finally filling, leveling of earth including concreting of road crossing as per standard ratio of RCC (Under ground pipe line should anticorrosive treated by bituminous painting with one coat of red oxide and two coats of synthetic enamel paint of best quality ISI mark). Contractor shall be provide supply of all materials, labour. side shuttering if required and T&P etc. approved for completion of work. |
| 24 | Supply& laying of 200/150 mm.dia 'B' class GI Pipe provided by Agency for Emulsifire System. |
| 25 | Construction of base support and foundation for above upper ground pipe line of size 200 NB, 100 NB, 80 NB and water hydrant point as per civil standard norms and fixing support base plate with due grouting of 04 по Foundation Eye holts (Plinth size-0.30X0.30X0.45 MTR & R: C:C Ratio 1:2:4). |
| 26 | Supply & Laying of 100 mm dia 'B' class GI pipe above ground pipe line in place of old, defective Hydrant pipe line. |
| 27 | Supply & Laying of 80 mm dia 'B' class GI pipe above ground pipe line in place of old, defective Hydrant pipe line and new Hydrant post. |
| 28 | Supply & Installation of Gun metal single headed 63 mm. Hydrant post complete with all accessories fixture and fitting such as GM Hydrant valve, MS hose box of size( 600X600) mm with pure synthetic RRL reinforced rubber lined) hose with 63 mm dia ,GM coupling branch pipe etc. |
| 29 | Supply of FRP Mobile Foam Unit, 100 Ltr. Capacity of reputed Make consisting of following item: |
| 30 | (A) Inline foam inductor-01 No. |
| 31 | (B) Foam making Branch-01 No. |
| 32 | (C) Synthetic House pipe 63mm Dia ISI Marked IS:636 Make Female Coupling as per IS:903,15 MTR Length 01 No. |
| 33 | (D) AFFF Foam compound, 6% make Foamier-100Ltr. Please Enable Macros to View BoQ information |