| 1 | Bored cast-in-situ M35 grade R.C.C. 1000 mm diameter Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. as per MORTH clause no - 12.24 |
| 2 | Providing and laying RCC Grade M35 using batching plant transit mixer & concrete pump complete as per MORTH specification, MORTH clause no - 12.11F(iv) case 1. |
| 3 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MORTH clause no. - 12.42 |
| 4 | Providing and constructing Temporary Island for construction of Pile foundation by Ballies Piling. Complete asper direction of engineer in charge |
| 5 | Providing and Supply of gunny bags including cost of sand and stitching of bags and laying in position.Complete asper direction of engineer in charge. |
| 6 | Making temporary Pile bridge for the purpose of During construction working in running water As detail attached.Complete asper direction of engineer in charge |
| 7 | Providing and laying RCC Grade M35 using batching plant transit mixer & Concrete pump as per MORTH specification complete. MoRth clause no - 13.5/H (p) |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications MoRTH clause no. - 13.06 |
| 9 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. as per MORTH clause no- 3.13.B |
| 10 | Back filling with local sand behind abutment, wing wall and return wall complete as per drawing and Technical Specification as per MORTH clause no- 13.9(A) |
| 11 | Providing and laying PCC Grade M25 using batching plant transit mixer & Concrete pump as per MORTH clause no- 12.8(D) case 1. |
| 12 | Furnishing and Placing Reinforced M-30 cement concrete in super-structure as per drawing and Technical Specification as per MORTH clause no -14.1C |
| 13 | Furnishing and Placing Reinforced M-35 cement concrete in super-structure as per drawing and Technical Specification as per MORTH clause no -14.1D |
| 14 | Furnishing and Placing Reinforced M-40 cement concrete in super-structure as per drawing and Technical Specification as per MORTH clause no -14.1E |
| 15 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications as per MORTH clause no -14.2 |
| 16 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications as per MORTH clause no -14.4 |
| 17 | Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. |
| 18 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification as per MORTH clause no -16.05 |
| 19 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications as per MORTH clause no -16.04 (A) |
| 20 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. as per MORTH clause no -14.16 |
| 21 | Providing and laying of a modular strip Box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.as per MORTH clause no -14.22 |
| 22 | Drainage Spouts complete as per drawing and Technical specification as per MORTH clause no -14.9 Please Enable Macros to View BoQ information |