| 1 | SUPPLY OF MATERIAL PORTION |
| 2 | Nut & Bolts |
| 3 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 4 | STAY CLAMP FOR SP-23 WITH NUT & BOLT |
| 5 | EARTH WIRE CLAMP FOR SP-23 WITH N/B |
| 6 | PP & CLAMP WITH N&B ST POLE SP-23 |
| 7 | BRACING CLAMP TOP FOR SP-23 WITH N/B |
| 8 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B |
| 9 | 11 KV Vertical type ISOLATOR |
| 10 | LABOUR PORTION |
| 11 | ERECTION OF EARTHING ROD |
| 12 | FABRICATION OF STEEL |
| 13 | EXCAVATION OF PIT FOR STAY SET |
| 14 | ERECTION OF 11 KV STAY SET |
| 15 | GROUTING OF STAY SET |
| 16 | EXCAVATION OF PIT FOR POLE |
| 17 | ERECTION OF SINGLE SP-23 POLE |
| 18 | ERECTION OF SINGLE SP-55 POLE |
| 19 | ERECTION OF SP-23 DOUBLE POLE |
| 20 | ERECTION OF SP-23 FOUR POLE |
| 21 | GROUTING OF POLE |
| 22 | MUFFING OF POLE |
| 23 | PAINTING OF SP-21/23 POLE |
| 24 | PAINTING OF SP-55 POLE |
| 25 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 26 | GUARDING OF LT/11 KV LINE |
| 27 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 28 | CONST.,INST.OF DANGER BOARD/ NUMBER PLATE |
| 29 | CARTAGE SP-21/23 POLE, 71-100 KM |
| 30 | CARTAGE SP-55 POLE, 71-100 KM |
| 31 | CARTAGE OF PETTY MATERIAL,71-100 KM |
| 32 | CARTAGE 11 KV PANELS, 71-100 KM |
| 33 | HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM) |
| 34 | HEADLOAD CARTAGE SP-55 POLE(0-1 KM) |
| 35 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 36 | MANUAL SHIFTING OF 11 KV VCB O/G |
| 37 | ERECT.11 KV VCB(O/G-B/C-I/C)PANEL |
| 38 | FIXING OF END TERM. J/KIT 3X120 SQMM O/D |
| 39 | LAYING OF 11KV CABLE IN TRENCH ALL WORKL |
| 40 | SUPPLY & FIXING OF ANTI CLIMBING DEVICE |
| 41 | CONST. OF PLINTH FOR 11 KV D/P STRUCTURE |
| 42 | INSTAL & MOUNT OF 11KV, 3-PH. DOUBLE BRK Installation of LT Distribution Box complete work Please Enable Macros to View BoQ information |