TDR 55303797
Tendering Authority Uttar Pradesh Cooperative Sugar Factories Federation Limited
Tender No GEM/2026/B/7494215
Tender ID GEM/2026/B/7494215
Tender Brief Corrigendum : Bids Are invited for Fabrication And Erection Work
City Farrukhabad
State Uttar Pradesh
Document Fees Refer document
EMD INR 10000.0 /-
Tender Value INR 9.50 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Fabrication And Erection Work The Work Of Cutting And Removing The Wornout Pipe Line From Half Inch To 12 Inches Dia And Installing The New Pipe At The Same Place - Fabrication , Fabricating And Replacing Wornout Bands Nipples Crosses Reducer With New One From Half Inch Dia To 12 Inches Dia - Fabrication , Renovation Work Of Half Inch To 12 Inch Diameter Coils - Fabrication , The Work Of Fabricating And Installing New Flanges Of 6 To 12 Inches Diameter - Fabrication , The Work Of Cutting And Removing The 14 Inch To 40 Inch Wornout Pipe Line And Fabricating A New One And Installing It At The Same Place - Fabrication , Cutting And Removing Wornout Bands Nipples Crosses Tees Reducer With New One From 14 Inches To 40 Inches Dia And Fabricating New Ones And Installing Them At The Same Place - Fabrication , The Work Of Making And Installing New Flanges Of 14 Inches To 40 Inches Diameter In Place Of Warn Out Flanges - Fabrication , Fabricate The Round And Square Tank In The Mill And Installed It And Put All The Connections Up To 01 Meter - Fabrication , Fabricate The Round And Square Tank In The Mill And Installed It And Put All The Connections Above 1 Meter Diameter - Fabrication , Strengthening With Heavy Structures At Various Places - Fabrication , Strengthening With Light Structures At Various Places - Fabrication , Strengthening And Repairing Wornout Platform At Various Places - Fabrication , Making And Replacing Manholes At Various Places - Fabrication , Replacing Old And Wornout Cones At Various Places With New One And Making It With 8 Or 10 Mm Ms Plate Installing Up To 01 Meter - Fabrication , Replacing Old And Wornout Cones At Various Places With New One And Making It With 8 Or 10 Mm Ms Plate Installing Above 01 Meter - Fabrication , Making And Replacing Wornout Casing With Newone And Making It With 6 Or 8Mm Ms Plate At Various Places Of Fan - Fabrication , Making And Installing Catchers At Various Stations Including All Connections - Fabrication , Patching Work Of Wornout Equipment At Various Stations - Fabrication , Replacing Wornout Truff Of Cane Carrier Baggase Elivatore And Rbc With New Ms Plate - Fabrication , Replacing Wornout Side Plate With New Ms Plate Of Various Places - Fabrication , Replacing Wornout Runner Base And Installing A New Runner Base Of Cane Carrier And Baggage Elevator And R B C - Fabrication , Replacing Wornout Runner With New One Of Cane Carrier And Baggage Elevator And R B C - Fabrication , Removing Wornout Angle Iron And T Iron Of The Cane Carrier And Reinstalling It By Straightening The Crooked Part - Fabrication , Removing The Wornout Part Of The Suit From Different Places And Fitting It With New One - Fabrication , Chevron Grooving Of New Rollers Of The Mill - Fabrication , Chevron Grooving Of Old Rollers Of The Mill - Fabrication , Remove The Wornout Partition Plates Of The Juice Box Above And Below The Juice Heater By 10 Or 12 Mm Ms Plate And Install It - Fabrication , Installing Ribs At The Top And Bottom Partitions Of The Juice Heater - Fabrication , Repairing Save All Of Qurdbody - Fabrication , Removing Old Wornout Gutters Installed At Various Places And Installing It With New Gutters - Fabrication , Remove The Old Wornout Save All From Pan And Quard And Install It With New One - Fabrication , Reinstalling The New Umbrella Fitted Inside The Pan By Making A New One And Removing The Old One - Fabrication , Replacement Ribbon Arm Of The Mascute Receiving Crystallizer - Fabrication , Making New Separator Of A Centrifugal Machine - Fabrication , Removing The Wornout Truff Of The Hopper And Installing It With New One - Fabrication , Making And Installing New Separators For Continuous Centrifugal Machines - Fabrication , Removing The Tubes Of Quad Juice Heater And Dynamic Juice Heater And Expanding Them By Installing New Tubes And Giving Their Hydraulic Testing Satisfactory Of Size 42 Mm - Fabrication , Removing The Tubes Of Pan Installing New Tubes And Expanding Them And Giving Hydraulic Tesing With Satisfactory Trial Of Size 96 Mm - Fabrication , Removing The Wornout Flue Gas Ducting Of Both The Boilers And Installing It With Newone Making From New Or Old Plates - Fabrication , Removing The Wornout Front And Roof Plate At Boiler Number 1 And 2 And Installing With A New Plate - Fabrication , Removing The Damaged Boiler D Er And Installing A New One - Fabrication , Making Bagasse Suit And Installing. - Fabrication , Replacement Of Juice Over Flow Box Of Clarifier - Fabrication , Making And Installing Bed Of Motor And Pumps At Various Places As Per Requirement - Fabrication , Replacement 6 Inch Dia Cooling Pipe Of Sulfur Furnace - Fabrication , Removing The Monitor Casing Of A Machine From Old Machine And Installing It And Giving Its A Trial - Fabrication , Making Amd Replacing Manholes At Various Places - Fabrication , Making And Replacing The Enternals Of Cather Of The Pan. - Fabrication , Making And Replacing The New Hood Of Cane Cutter - Fabrication , Removing The Old Bottom Plate Of The Lowest Compartment Of The Clarifier And Placing A New Plate On It After Placing An Angle Trap As Per The Instructions And Giving A Satisfactory Water Trial - Fabrication , Reinstalling The Stirrer Of The Clarifier And Giving A Satisfactory Trial - Fabrication , Removing The Shaft Of A Pug Mill And Replacing The Old Bushes On Both Sides And Fitting New Ones - Fabrication , Removing And Refitting The Shaft Of A Brown Sugar Magma Mixer And Installing With New Bush - Fabrication , Reinstalling The Trufff Of Connecting Rod Of The Hopper - Fabrication , Making And Installing New Catcher Strainer - Fabrication , Removing The Old Rail Line Of The Trolley Of The Unloader And Fitting The New Rail Line Satisfactorily And Doing Water Level - Fabrication , Reinstalling The Old Rail Line Of The Unloader S Bridge And Fitting It And Checking Water Level Etc - Fabrication , Removal Of Old And Weak Channels Of 3 Inches To 10 Inches Diameter Installed At Various Places And Installation Of New Ones As Per Requirement - Fabrication , Cutting And Straightening Old Plates Installed At Various Places As Per Requirement - Fabrication , Removal Of Old And Wornout Scrubber Installed On Sulfur Furnace And Making And Replacing With 8 Or 10 Mm Plate And Making All The Connections - Fabrication , Removing The Trufff Plate Including Support Corroded Shell And Top Cover Plate Of The Top Chamber Of The Clarifier And Fitting The New Plate And Giving It S A Water Proof Trial - Fabrication , Re-Installation Alignment And Trial Of Hopper Driving End - Fabrication , Making And Installing The Top Cover Of The Centrifugal Machine - Fabrication , Making An Arm And Installing It On The Shaft Of Pug Mill - Fabrication , Making And Installing Scrubber And Bottle Jackets Of Sulfur Furnace - Fabrication , Making And Installing Drum Type Sulfur Furnace - Fabrication , Cutting Out The Corroded Save All And Making And Fitting It With A New Plate - Fabrication , Modify The Juice Sulfiter By Reducing The Cell Diameter As Per The Drawing - Fabrication , Removing The Screen Of Old Dsm And Fitting A New One And Replacing Its Wornout Frame - Fabrication , Removing The Wornout Mixed Juice Spreader Installed In The Mill And Installing A New One As Per The Instructions - Fabrication , Cleaning All The Tubes Of The Transient Heater And Giving Hydraulic Testing - Fabrication , Replacement And Straighthening Of Wornout Plate Of Unloader Trolley - Fabrication , Cutting Out The Corroded Juice Tray Of Mill And Installing A New One And Giving Satisfactory Trial - Fabrication , Installing Guides On Both Sides Of The Chain Near The Cutter In The Cane Carrier - Fabrication , Making And Replacing Of Wornout Suit With New One Of Cane Carrier - Fabrication , Dismantling The Wornout Catcher Of The Quad S Fourth Body And Making And Installing Its With New 8 Mm Plate - Fabrication , Removing Old And Damaged Gear Of Vacuum Crystallizer And Installing New Gear Doing Alignment And Giving Satisfactory Trial - Fabrication , Making And Installing The Oil Tray Of Mill House With New One. - Fabrication , Making New Frame Of Inter Carrier Using 8 Mm Plate And Angle And Channel - Fabrication , Straightening Of Wornout Columns Of Cane Carrier And Bagasse Carrier Approx 2 Fit Hight - Fabrication Total Quantity : 80

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 27-05-2026 01-06-2026
2 22-05-2026 27-05-2026
3 15-05-2026 22-05-2026

Key Dates

Publish Date 27-05-2026
Last Date of Bid Submission 01-06-2026
Tender Opening Date 01-06-2026

Contact Information

Company Name Uttar Pradesh Cooperative Sugar Factories Federation Limited
Address 209602,Sahkari Chini Mills Ltd. Kaimganj

BOQ Items

Sl. No. Item TitleItem Description
1The work of cutting and removing the wornout pipe line from half inch to 12 inches dia and installing the new pipe at the same placefabrication
2Fabricating and replacing wornout bands nipples crosses reducer with new one from half inch dia to 12 inches diafabrication
3Renovation work of half inch to 12 inch diameter coilsfabrication
4The work of fabricating and installing new flanges of 6 to 12 inches diameterfabrication
5The work of cutting and removing the 14 inch to 40 inch wornout pipe line and fabricating a new one and installing it at the same placefabrication
6Cutting and removing wornout bands nipples crosses tees reducer with new one from 14 inches to 40 inches dia and fabricating new ones and installing them at the same placefabrication
7The work of making and installing new flanges of 14 inches to 40 inches diameter in place of warn out flangesfabrication
8fabricate the round and square tank in the mill and installed it and put all the connections up to 01 meterfabrication
9fabricate the round and square tank in the mill and installed it and put all the connections above 1 meter diameterfabrication
10Strengthening with heavy structures at various placesfabrication
11Strengthening with light structures at various placesfabrication
12Strengthening and repairing wornout platform at various placesfabrication
13Making and replacing manholes at various placesfabrication
14replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing up to 01 meterfabrication
15replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing Above 01 meterfabrication
16Making and replacing wornout casing with newone and making it with 6 or 8mm ms plate at various places of fanfabrication
17Making and installing catchers at various stations including all connectionsfabrication
18Patching work of wornout equipment at various stationsfabrication
19Replacing wornout truff of cane carrier baggase elivatore and rbc with new ms platefabrication
20replacing wornout side plate with new ms plate of various placesfabrication
21Replacing wornout runner base and installing a new runner base of Cane Carrier and Baggage Elevator and R B Cfabrication
22Replacing wornout runner with new one of Cane Carrier and Baggage Elevator and R B Cfabrication
23Removing wornout angle iron and T iron of the cane carrier and reinstalling it by straightening the crooked partfabrication
24Removing the wornout part of the suit from different places and fitting it with new onefabrication
25Chevron grooving of new rollers of the millfabrication
26Chevron grooving of old rollers of the millfabrication
27Remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install itfabrication
28Installing ribs at the top and bottom partitions of the juice heaterfabrication
29Repairing save all of qurdbodyfabrication
30Removing old wornout gutters installed at various places and installing it with new guttersfabrication
31Remove the old wornout save all from pan and quard and install it with new onefabrication
32Reinstalling the new umbrella fitted inside the pan by making a new one and removing the old onefabrication
33Replacement ribbon arm of the mascute receiving crystallizerfabrication
34Making new separator of A Centrifugal machinefabrication
35Removing the wornout truff of the hopper and installing it with new onefabrication
36Making and installing new separators for continuous centrifugal machinesfabrication
37Removing the tubes of Quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of Size 42 mmfabrication
38Removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of Size 96 mmfabrication
39Removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old platesfabrication
40Removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new platefabrication
41Removing the damaged boiler damper and installing a new onefabrication
42Making bagasse suit and installing.fabrication
43Replacement of juice over flow box of clarifierfabrication
44Making and installing bed of motor and pumps at various places as per requirementfabrication
45Replacement 6 inch dia cooling pipe of sulfur furnacefabrication
46Removing the monitor casing of A machine from old machine and installing it and giving its a trialfabrication
47Making amd replacing manholes at various placesfabrication
48Making and replacing the enternals of cather of the pan.fabrication
49Making and replacing the new hood of cane cutterfabrication
50Removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trialfabrication
51Reinstalling the stirrer of the clarifier and giving a satisfactory trialfabrication
52Removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new onesfabrication
53Removing and refitting the shaft of a Brown Sugar Magma mixer and installing with new bushfabrication
54Reinstalling the trufff of connecting rod of the hopperfabrication
55Making and installing new catcher strainerfabrication
56Removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water levelfabrication
57Reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etcfabrication
58Removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirementfabrication
59Cutting and straightening old plates installed at various places as per requirementfabrication
60Removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connectionsfabrication
61Removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trialfabrication
62Re-installation alignment and trial of hopper driving endfabrication
63Making and installing the top cover of the centrifugal machinefabrication
64Making an arm and installing it on the shaft of pug millfabrication
65Making and installing scrubber and bottle jackets of sulfur furnacefabrication
66Making and installing drum type sulfur furnacefabrication
67Cutting out the corroded save all and making and fitting it with a new platefabrication
68Modify the juice sulfiter by reducing the cell diameter as per the drawingfabrication
69Removing the screen of Old DSM and fitting a new one and replacing its wornout framefabrication
70Removing the wornout mixed juice spreader installed in the mill and installing a new one as per the instructionsfabrication
71Cleaning all the tubes of the transient heater and giving hydraulic testingfabrication
72Replacement and straighthening of wornout plate of unloader trolleyfabrication
73Cutting out the corroded juice tray of Mill and installing a new one and giving satisfactory trialfabrication
74Installing guides on both sides of the chain near the cutter in the cane carrierfabrication
75Making and Replacing of wornout suit with new one of cane carrierfabrication
76Dismantling the wornout catcher of the quad s fourth body and making and installing its with new 8 mm platefabrication
77Removing old and damaged gear of vacuum crystallizer and installing new gear doing alignment and giving satisfactory trialfabrication
78Making and installing the oil tray of mill house with new one.fabrication
79Making new frame of inter carrier using 8 mm plate and angle and channelfabrication
80Straightening of wornout columns of cane carrier and bagasse carrier approx 2 fit hightfabrication

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download c0079a16-f002-4b3b-8786-b24fc3720676.pdf Tender Documents 0 KB
Download 9278466_Boq_1.xlsx Tender Documents 0 KB
Download feb_2026-05-01-13-06-32_af93be4951b5b66925dd653a6b308c4f.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.