| 1 | Dagbelling 5 to 7.5 cm deep (BSR RDPR 2025 Item No.6 b) |
| 2 | Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes (BSR RDPR 2025 Item No. Vividh 191) |
| 3 | Earth work excavation by JCB Machine/Tractor attached with scraper for embankment in hard soil including pebbles, etc. and maintening bund cross section/profile with initial lead of 250 m and lift up to 3 m including loading and unloading wherver requried complete in all respect. Draft based on chapter 5th of irrigation page no. 32 to 34 (effective from 01/01/2017) machinary work in Hard Soil(BSR RDPR 2025, Item no. 196 B) |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respectHard soil mixed with Kankar / boulders, Morrum(WRD BSR 2023, Chapter no. V, Item no. 1 c) |
| 5 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respectSoft / Disintegrated rock (WRD BSR 2023, Chapter no. V, Item no. 2 a) |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respectHard Rock not requiring blasting,(BSR WRD 2023, Chapter no. V, Item no. 2b) |
| 7 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respectPhylite & Other Hard Rock requiring Nominal Blasting(WRD BSR 2023, Chapter no. V, Item no. 2 c) |
| 8 | Cement Concrete 1 Cement : 4 Sand : 8 Aggregate Stone of 40 mm nominal size including pouring in the foundation, tamping, and compaction etc. 1:4:8(i) 40 mm crusher broken stone aggregate if hand broken gravel is used in place of aggregate, the same quantity shall be payable but 30 % reduction shall be made in rate of aggregate.(ii) If Vibrator and mixer are not used, 3% reduction shall be made.(BSR RDPR Kushalgarh 2025 Item No. 15 A) |
| 9 | Drilling holes of 35 mm diameter for anchor rods.Upto 1.50 m depth(BSR WRD 2023, chapter XI, Item No. 1 a) |
| 10 | Cutting , Bending, Setting, and Fastening of iron for RCC work including Supply.(BSR RDPR Kushalgarh Item No. 61) |
| 11 | Centering, Shuttering ( Takhta and Dulabandi) for laying RCC roof, slab, balcony, lintel etc. up to 4.5 meter height and removal etc. as per specifications.(B) Shuttering Steel(BSR RDPR Kushalgarh 2025 Item No. 93 B) |
| 12 | Cement Concrete 1 Cement : 3 Sand : 6 Aggregate Stone of 20 mm nominal size including pouring in the foundation, tamping, and compaction etc. for Anicut, 1:3:6, If Vibrator and mixer are not used, 3% deduction Should be made(BSR RDPR 2025 Kushalgarh Item No. 170 B) |
| 13 | Supply of Stone for Kharanja work for Apron in Cement Mortar of Veraddha Stones 1:6, Filling up the empty space between two stones with mortar upto full height(BSR RDPR Kushalgarh 2025 Item No. 149 B) |
| 14 | Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone.(BSR RDPR 2025 Item No. 167) |
| 15 | Applying enamal paint in three layers to give an even shade, Creating an even surface on new/old work.(BSR RDPR Kushalgarh 2025 Item No. 82 A) |
| 16 | Painting distance mark stone and lettering with light blue white or yellow un-washable paint including cost of material(WRD BSR 2023, Chapter no. XVIII, Item no. 13) Please Enable Macros to View BoQ information |