|
| 1 | Dagbelling 5 to 7.5 cm deep |
| 2 | Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum |
| 4 | Soft / Disintegrated rock |
| 5 | Hard rock without blasting |
| 6 | Cement Concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of 20mm size |
| 7 | cement mortar for apron 1;6, 23cm kharanja for thickness |
| 8 | Random rubble stone masonary in cement mortar 1:6 forFoundation and super structure |
| 9 | Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB. |
| 10 | Cement plaster in cement sand mortar 1:4, 25mm thick with curing. |
| 11 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton Soil for Corewall and Cutoff Trench |
| 12 | Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required. |
| 13 | Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench |
| 14 | Earth work in rough (borrow area) excavation with JCB or Scraper, for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 3m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect. |
| 15 | Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone |
| 16 | Dismelting old cement plaster, skirtin raking out joints and cleaning the surface. (BSR RDPR 2023 Item No.115) |
| 17 | Providing and fixing reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wier) all complete. (BSR RDPR 2023 Item No.61) |
| 18 | Providing of centering & shuttering with steel sheets in RCC for roof, slab, chajja, linten etc. lift upto 4.5m and removing of framework etc. (BSR RDPR 2023 Item No.93 b) |
| 19 | Iron works for grill/gate etc complete including cutting, mounting and installation of flat edges, guide Tee and track channel or any part of gate with cost of material complete in all respect (BSR RDPR 2023 Item No.63) |
| 20 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) |
| 21 | Watering of earth including cost of carriage of water when source of water is up to 3 km lead |
| 22 | Dressing of uneven embankment in required profile |
| 23 | नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना |
| 24 | सीमेन्ट कांक्रिट नींव या फर्श में 40 मि.मी. नामीय माप की पत्थर गिट्टी(crusher broken)/ईट मिटटी , सीमेन्ट- रेत मसाला में 1 सिमेन्ट : 4 रेत : 8 गिट्टी अनुपात में डालना तथा कुटाई करना , तराई समेत । |
| 25 | ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि। |
| 26 | इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। Please Enable Macros to View BoQ information |