|
| 1 | PERMANENT RESTORATION OF FLOOD PROTECTION WORK AT CHANUNTA & PANJGRAIN NALLAH |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 4 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 5 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 6 | carraige of stone from nearby nallah to site of work for an average distance of 500Mtr by H.L |
| 7 | PERMANENT RESTORATION OF FLOOD PROTECTION WORK AT SULGAR & CHAMPAL NALLAH |
| 8 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 9 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 10 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 11 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 12 | carraige of stone from nearby nallah to site of work for an average distance of 500Mtr by H.L |
| 13 | PERMANENT RESTORATION OF FLOOD PROTECTION WORK AT TALPAR/DHANDAL NALLAH |
| 14 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 15 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 16 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 17 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 18 | carraige of stone from nearby nallah to site of work for an average distance of 500Mtr by H.L Please Enable Macros to View BoQ information |