| 1 | PERMANENT RESTORATION OF FLOOD PROTECTION WORK AT GHORDI NALLAH, NALLAH GHORRIAN AND ITS TRIBUTARIES |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 4 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 5 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 6 | carraige of stone from nearby nallah to site of work for an average distance of 500Mtr by H.L |
| 7 | CONSTRUCTION OF PROTECTION WORK AT SLETA NALLAH AT PANCHAYAT SARSOO |
| 8 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc |
| 12 | Carraige of sand from local source to site of work av. 55km by MT and av H.L 200m |
| 13 | Carraige of stone agg. From local source to site of work av. 10km by MT and av H.L 200m |
| 14 | PERMANENT RESTORATION OF FLOOD PROTECTION WORK AT MANI BINDLA NALLAH |
| 15 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 16 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 17 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 18 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 19 | carraige of stone from nearby nallah to site of work for an average distance of 500Mtr by H.L Please Enable Macros to View BoQ information |