|
| 1 | Supply of hydraulic excavator 3D (JCB, Tata Hitachi, Hyundai, Volvo etc.) with front loader of capacity 1.0 cum at site on hire charges basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge. |
| 2 | Extra for providing rock breaker arrangement instead of front loader in hydraulic excavator 3D (JCB, Tata Hitachi, Hyundai, Volvo etc.) of capacity 1.0 cum at site on hire charges basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge. |
| 3 | Supply of hydraulic excavator 20 ton having digging height of at least 8.0 m and digging depth 4.0 m (Poclain, Komatsu, Hyundai, Tata Hitachi etc.) with bucket at site on hire charge basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge.(Cost of trailers/flatbeds or specialized heavy-duty transporters to transport shall be paid separately.) |
| 4 | Extra for providing breaker arrangement instead of bucket in hydraulic excavator 20 ton having digging height of at least 8.0 m and digging depth 4.0 m (Poclain, Komatsu, Hyundai, Tata Hitachi etc.) on hire charge basis, all complete as per direction of Engineer-in-Charge. |
| 5 | Supply of trailers/flatbeds or specialized heavy-duty transporters to transport the hydraulic excavator 20 ton capacity on hire charge basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge. |
| 6 | Supply of air compressor 250 CFM with two leads for pneumatic cutter/hammer at site on hire charges basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, including pneumatic cutter/hammer with operator, all complete as per direction of Engineer-in-Charge. |
| 7 | Supply of mobile crane on hire charges basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge. |
| 8 | Supply of crane 20 tonne capacity at site on hire charges basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge. |
| 9 | Supply of tractor with trolley attachment at site on hire charges basis including driver, diesel etc., all complete as per direction of Engineer-in-Charge. |
| 10 | Supply of tipper/dumper at site on hire charges basis including operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables, all complete as per direction of Engineer-in-Charge. |
| 11 | Providing serviceman like Chowkidar, Beldar/Coolie/Sewer man/Rock Excavator/Rock Breaker/Rock Hole Driller etc. as and whenever required without delay including tools, as required to execute the services as per direction of Engineer-in-Charge. |
| 12 | Providing photographer along with all equipment for capturing photos of demolition program/events and at least 100–120 photos of size 5\\" × 7\\" placed in waterproof album, complete as per direction of Engineer-in-Charge. |
| 13 | Providing videographer along with all equipment for recording videos of demolition program/events and soft copy of videos in a pen drive, complete as per direction of Engineer-in-Charge. |
| 14 | Supplying of gas cutter along with required gas cylinders and other equipment at site on hire charges basis including operating staff and consumables, all complete as per direction of Engineer-in-Charge. |
| 15 | Disposal of building rubbish/malba/similar unserviceable dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground beyond 50 m lead, for all leads including lifts, as per direction of Engineer-in-Charge. Note: Payment shall be made only on production of MCD receipt showing ground tax payment. |
| 16 | Providing and fixing 1.60 mm thick M.S. sign board of size 1.20 m × 0.90 m with M.S. angle frame, bracing, holdfasts fixed in CC block (1:1.5:3 mix), including cutting, hoisting, welding, painting with synthetic enamel paint over primer, lettering etc., all complete as per direction of Engineer-in-Charge. |
| 17 | Supplying and applying caution tape (3 inches wide, white & red PVC material) for barricading/danger/warning at work site, weather resistant, complete as per direction of Engineer-in-Charge. |
| 18 | Less GST correction factor on DSR-2023 i.e. (1-0.973 = 0.027) |
| 19 | Add 3% Cost Index(+)= Please Enable Macros to View BoQ information |