Name of Work:- C/O Link road from Old Saloh Bhadouri road from Sainsowal to Swan River Km. 0/00 to 0/900 (SH: C/O Edge wall , embankment & Providing & laying GSB at RD 0/00 to 0/330) -under MMSY | Sl. No. | Item Description | |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any height including getting out the excavated soil and disposal of surplus excavated soil as directed, within any all kind of soil including entire carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | | 2 | Providing and laying cement concrete 1:4:8 (one cement: four sand:eight graded crushed stone aggregate 40mm( forty millimeter nominal size) mechanically mixed and curing complete including cost of form work in foundation and plinth in all heights / depths including enitre carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | | 3 | Providing weepholes in brick masonry/ stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100mm(hundred milimetre)dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H)(one vertical twenty horzontial) towards drawing face complete as per drawings and technical specification clause 614,709,1204.3.7 including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government. | | 4 | Construction of embankement with approved material obtained from borrow pits with a lift upto 1.5 metre, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 with a lead all leads as per Technical Specification Clause 301.5 as per the direction of the Engineer-in- charge ,including carriage of material within all leads and lifts and other incidential.The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. | | 5 | Construction of gravel/soil aggregate sub base/base by providing well graded material of nominal maximum size grading 80mm ( Eighty millimetre) as per table 2.3 of IRC SP 77-2008 spreading in uniform layers with tractor mount appropriate grading arrangements on prepared surface mixing by mix in place method at OMC with tractor mount approptiate rotavator attachment and compaction with three wheel 80-100 KN ( Eighty to one hundred Kilo Newton) static roller capacity to achieve the desired density complete as per MORD Technical specification 2014 section-300 contained in para 2.2, 3.6 and 3.7 of IRC SP 77-2008 complete as per technical specification section 400 of caluse 402 for grading -I material including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. Please Enable Macros to View BoQ information |
|