| 1 | PERMANENT RESTORATION OF NARORE KHUL RD(0-1160M) AT PLACES |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc |
| 6 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 40mm thick with 20 mm nominal size stone aggregate |
| 7 | Carraige of sand from nud to site of work av. 70km by MT and av H.L 800m |
| 8 | Carraige of stone agg. From source to site of work av. 25km by MT and av H.L 800m |
| 9 | PERMANENT RESTORATION OF OSSU KHUL RD (0-1800M) AT PLACES |
| 10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected 1 meter from cutting edge |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc |
| 14 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 40mm thick with 20 mm nominal size stone aggregate |
| 15 | Carraige of sand from nud to site of work av. 45km by MT and av H.L 100m |
| 16 | Carraige of stone agg. From source to site of work av. 105km by MT and av H.L 100m Please Enable Macros to View BoQ information |