|
Tender for Cleaning Of Drainage Up To Silt At Site With Disposal Of 60Mtr. Including Waste Making Diversion Etc....All completion , Dismentling Of Old Damaged Interlocking Block Pavement Or B.O.E Pavement Including Stacking Of Dismantle Materials As Per Directed By Engineer-In-Charge Within Distance Of 60 Metre Etc....All completion As Per P.W.D. Schedule Road Work , Dismantling Of Old Damaged Boundary Wall Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material With In Lead Of 60 Meaters. As Per Direction Of Engineer-In-Charge....All completion As Per P.W.D Schedule Item No-692 , Excavation In Foundation In Soil Mixed With Moorum /Shingle /Kankar, Requiring The Use Of Special T&P Inculding Lift Up To 1.5 M & Lead Up To 30 M Work Excuted Under Water Or Liquid Mud And In Or Under Foul Condition.....All Complete As Per P.W.D Schedule Item No. 251+258 (A) , providing and laying Cement Concrete With 1:6:12 (1 Cement 6 Fine Sand, 12 Brick Ballast 40Mm Nominal Size Etc........All completion As Per P.W.D.Schedule Item. No. 273 , Class-150 Brick Work With 1:4 Cement & C-Sand Mortar Etc.........All completion As Per P.W.D.Schedule Item.No. 305 , 12Mm Thick Plaster With Cement & C- Sand Mortar In 1:5 Including Supply Of All Material Labor Etc.........All completion As Per P.W.D.Schedule Item. No. 584(I) , providing and laying In Cement, Concrete 4:2:1 With 20Mm Stone Aggregate Coarse Sand And Cement Etc.....All completion As Per P.W.D Schedule Item No. 279(I) , Reinforced Cement Concrete Work With Cement Approved Coarse Sand And 2Cm (3/4) Gauge Approved Stone Ballast In Proportion Of 1:1.5:3 For Slab Works Etc..........All completion As Per P.W.D.Schedule Item. No. - 284 (A). , M.S. Or Iron In Plain Work Such As R.Cc I\C Bending For Proper Shape And I\C Supply Of Steel & Its Wastage, Bend, Hooks, And Authorized Overlapping Shall Be Measured And I\C Cost Of Binding Wire.Etc...........All completion As Per P.W.D.Schedule Item. N0.504 , Earth In Cutting Or Embankment In Ordinary Soil Excavation To Done From Regular Pits With Cortage 5 Km. Distance Without Royality Etc....All completion As Per S.I No- 253 , Supply, Laying & Consolidation Of 22.4 - 53Mm. Gauge Stone Ballast And Screening Material By Hand Rammer. Etc.....All completion , Re-Laying Of Old Interlocking Bricks Including I/C Preparation Of Sub Grade To Required Camber, Filling Joint With Local Sand Etc.....All completion As Per P.W.D Schedule Item No-785 , Providing And Laying Of Factory Made 80 Mm Thick Interlocking Cement Concrete Tiels (30Mpa) Including 25Mm Thick Compacted Bed Of Fine Sand Compacting And Proper Embeding /Laying Of Interlocking Tiels Levelling And Dressing Of Surface To Required Level And Slope, Filling Joints With Fine Sand Including The Cost Of Material, Labour And T&P Etc. Required For Proper Completion Of The Work. As Directed By Engineer-In-Charge....All completion As Per S.I No-01 (New Item) , Cartage/Disposal Of Surplus Malva / Silt Upto 5Km Distance From Site....All Complete. , Supply/Fixing Of Granite Stone Indication Board In Brick Masonary Padastal Etc.... All Work completion As Per Direction Of E/I/C , Gst 18%
|