Tendering Authority Uttar Pradesh Jal Nigam
Tender No 191/M-03/08 Dated-21.04.2026
Tender ID 2026_UPJNM_1140583_1
Tender Brief Corrigendum : Tender For Survey, Soil Investigation, Design And Supply Of All Materials, Labour, T&P Etc. Required For Construction Of Oht (Over Head Tank), Tubewell, Pump House, Rising Main, Distribution System, With Associated Works For 264 Ews Residence (Pradha
City Hapur
State Uttar Pradesh
Document Fees INR 5900 /-
EMD INR 126000.0 /-
Tender Value INR 62.91 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Survey, Soil Investigation, Design And Supply Of All Materials, Labour, T&P Etc. Required For Construction Of Oht (Over Head Tank), Tubewell, Pump House, Rising Main, Distribution System, With Associated Works For 264 Ews Residence (Pradhan Mantri Awas Yojna) In Village Hindalpur, Distt. - Hapur, Complete In All Respect As Per Specifications In Tender Document Including Testing, Commissioning, Trial & Run, Defect Liability Period (One Year For Civil Works And Two Years For E&M Works) And Its Handing Over The Complete Works Of Construction Of Oht With Associated Works For 264 Ews Residence (Pradhan Mantri Awas Yojna) In Village Hindalpur) With Its Appurtenant Works Tohapur Pilkhwa Development Authority (Hdpa) ,District - Hapur (Uttar Pradesh).

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 04-05-2026 Correction in BOQ (NIT No.) Financial Bid 15-05-2026

Key Dates

Publish Date 04-05-2026
Last Date of Bid Submission 15-05-2026

Contact Information

Company Name Uttar Pradesh Jal Nigam
Contact Person Executive Engineer
Address Office of Executive Engineer, CD UP Jal Nigam (Urban), Hapur

BOQ Items

Name of Work:- Survey, Soil investigation, design and Supply of all materials, labour, T&P etc. required for Construction of OHT (Over Head Tank), Tubewell, Pump House, Rising main, Distribution System, with associated works for 264 EWS Residence (Pradhan Mantri Awas Yojna) in Village Hindalpur, Distt. - Hapur, complete in all respect as per specifications in tender document including testing, commissioning, trial & run, defect liability period (one year for civil works and two years for E&M works) and its handing over the complete works of Construction of OHT with Associated works for 264 EWS Residence (Pradhan Mantri Awas Yojna) in Village Hindalpur) with its appurtenant works toHapur Pilkhwa Development Authority (HDPA) ,District - Hapur (Uttar Pradesh).
Sl. No. Item Description
1SCHEDULE (G-1)
2RCC Overhead Tank
3Supply of all materials labour T&P etc. required for complete construction of R.C.C. Over Head Tank of following capacity and staging min 0.6 m above buildup ground level with main components, soil testing and ‐assuming bearing capacity of soil as 8 MT, including cost of survey and supply of design and drawings. All the water retaining components of OHT shall be casted in M 30 grade cement concrete and minimum grade of concrete‐ of foundation and staging should be M 25 with approved opc cement, coarse sand and stone grit as per I.S. 11682 and I.S.456 Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part III for wind load on structure and including 1M wide RCC staircase (Saperate two column based RCC staircase), 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One Stainless steel ladder inside the tank from top dome to bottom dome, railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, proper ventilator at top dome in circular shape of 1.2 m dia, Food Grade epoxy coating of FOSROC / Asian paints Triblock or reputed brand on inside surface area of water container after testing of water tightness, two coat of apex painting over one coat of primer of approved colour after finishing of RCC surface with grinder,
4Repairs of pin holes, unevenness of all concrete surface and steel pipe works, Ultra Sonic Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309 1969 and I.S. 3013 1966, C.I. /M.S. manhole of min 60x60cm size with locking arrangement.
5Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet/outlet , overflow and washout (as per approved design) with Bell Mouth as per latest / relevant I.S. specifications with all jointing materials for proper completion of work, Construction of 120mm thick RCC floor in 1:1.5:3 with cement, coarse sand, approved stone grit and reinforcemen‐t@8mm dia@250mm c/c both way over 100mm thick PCC 1:4:8 Construction of washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC(6Kg-f)/ HDPE (PN-6.0) pipe as per latest relavent I.S. code for disposal of water from overflow and washout chamber to suitable point outside the water works compound including necessory earth filling in campus, Gardening work with 2 nos Palm tree, landscaping work, installation of fountain in water works campus, watch & ward of all campus etc complete in all respect as per direction of Engineer-in-charge. including testing of bearing capacity of soil for various sites for proposed water works.
6125 KL/22 m staging
7SCHEDULE (G-2)
8RISING MAIN
9Supply of following sizes of pipes including cost of pipes with cost of its Specials, FOR destination, all duties and insurance charges, cost of jointing materials, loading unloading, third party inspection charges, packing and forwarding charges, road transportation charges etc complete .
10D.I. Pipe K-9 conforming to IS 8329 / 2000 or its latest amendment
11100 mm dia
12Dismantling of following type of road surface either single or multiple layers (In case of multiple layers only top layer will be measured for payment) for laying of pipe line including sorting out of serviceable and unserviceable materials proper stacking of serviceable materials at suitable place and disposal of unserviceable materials at suitable place. Due to excavation, chowked drains are to be cleared also.
13Interlocking C.C. Tile Road
14Excavation of earth in ordinary/hard soil (loam, clay, sand, kankar or any strata ) to give 1 mt. cover from top of the pipe including lift upto 1.5 mt. and lead from centre of trenches and refilling of earth in 20 cm. layers with watering and raimming etc. complete in all respect.
15Carting, laying & jointing following type of pipes and lowering the same into already prepared trenches and laying true to alignment and gradient, including all labour, T&P, supply & fixing of all HDPE / D.I./ CI specials conforming to latest / relevant IS specification as per requirement of site, loading and unloading, shifting of public utilities, interconnection with existing pipe line and seggregation of zone if any, also includes sectional pressure testing of pipe line , barricading for safety purpose etc. all complete as per direction of Engineer in charge.
16D.I. Pipe K-9
17100 mm dia
18Supply, Carting to site of work, lowering, fixing and jointing of following sizes of fittings in trenches including FOR destinstion, all duties and insurance, cost of fittings, all jointing materials as per latest relevant IS Code, such as rubber packing, nut bolts any type of HDPE/D.I. specials etc. complete work as per direction of Engineer in charge.
19C.I. D/F Sluice Valve
20100mm Dia
21RCC thrust block in RCC 1:1.5:3 (1 part of cement, 1.5 parts coarse sand and 3 parts stone grit 10 to 20 mm ) including cost of material, shuttering, all labour T&P etc. complete work.
22M.S. or iron work in plain work such as R.C.C. work brought to required shape as necessary including bending for proper completion of the work including supply of steel and wastage.
23Supply of all materials and construction of following chambers as per type design of U.P. Jal Nigam (Urban) including supply of all labour, material, T&P etc. complete.
24Sluice/Scour Valve chambers (Masonry Type)
25Reinstatement of following type of roads including supply of all materials, labour, T&P etc. required for proper compiition of work as per specifications
26SCHEDULE (G-3)
27Construction of New Pump House cum Chloronating Room size 3.60X3.0 X3.60 m and 1.8x2.5x3.0 m including supply of all material,labour,T&P etc. complete.(other specifications and details can be get from engineer-in-charge.) with all as per type Design.
28Construction of 1.0X1.0X1.3 m mansory type byepass chamber including plaster, supply of all materials, labour, T&P etc. required for proper completion of work.
29Extra Ist class brick work in 1:6 cement and coarse sand mortar in foundation and plinth due to low land area including supply of all materials, labour,T&P etc required for proper compltion of work.
30SCHEDULE (G-4) (MISCELLANEOUS WORKS)
31Supply of the following pipes including railway freight, insurance charges F.O.R. etc. complete as per IS 8329:2000 or its latest amendment for Interconnection with already laid distribution main.
32200mm Dia D.I. Class K-7
33Interconnection of supply main DI, K-7 200 pipeline (from OHT) with distribution main (already laid by HPDA) including supply of all required CI/DI specials, labour and T&P etc. complete for proper completion of work.
34Supply of following sizes of D.I. D/F sluice valves as per I.S. 14846:2000 TESTED TO 10 Kg/sqm fixing in pipe line trenches, jointing and testing complete.
35200mm Dia
36Carting of following sizes D.I.D./F Sluice Valve and specials and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete including supply of jointing materials.
37200 mm dia
38Excavation for pipeline work in Ordinary Soil with lift up to 1.5 m and lead up to 50 m including filling back the excavated earth into the trenches with watering, ramming and disposal of surplus earth with in 50 m lead.
39Carting, Laying and Jointing of following size of DI pipes and specials and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete including testing of pipe lines and cutting of pipes.
40200mm dia
41Supply of all materials and construct following chambers as per type design with supply of all labour, T&P etc. complete.
42Masonary Type Chamber as per Unit Estimate
43Supply and Fixing of 100 mm fire Hydrant Valve
44E&M WORKS
45Transportation of rig machine erection, dismantling and associated T&P Complete in all respect including required all material , labour etc.
46DRILLING OF TUBEWELL BORE
47Drilling of 500 mm. dia bore from G.L. to 60 M. BGL
48Drilling of 450 mm. dia bore from 60 BGL to 100 M. BGL
49Drilling of 450 mm. dia bore from 100 BGL to 150 M. BGL
50Logging of bore hole by electirc logger
51TUBEWELL ASSEMBLY - MSERW Tube well assembly with all required parts like plain pipe, slotted pipe, MS rings, well cap, bail plug clamp, reducer, central guide, support structure etc. as required and as per typed design complete in all respect.
52200 mm. dia 7.1 mm thick MSERW Plain Pipe with MS ring & reducer
53150 mm.dia 7.1 mm thick M.S. Plain pipe & Slotted pipe with MS ring
54Lowering of Tubewell assembly duly welded including welding electrode
55200 mm. dia 7.1mm thick MSERW Plain / Slotted Pipe
56150 mm. dia Plain/Slotted Pipe 60 M. BGL to 100 M. BGL
57150 mm. dia Plain/Slotted Pipe 100 M. BGL to 140 M. BGL
58Supply & Shruoding of Lal Kuan Pea Gravel 1.6 to 4.8 mm. size for Tubewell
59DEVELOPMENT OF TUBEWELL
60Transportation, Erection, Dismantling of 150 P.S.I. Compressor.
61Charges for Development by 150 P.S.I. Compressor per hour.
62Transportation, Erection, Dismantling of 1 Cusec O.P. Unit and yeild Test.
63Charges for Development by 1 Cusec O.P. Unit per hour.
64Chemical and Bacteriological test of water sample form departmentel / NABL approved lab.
65Site Clearance, Baricating, gravelshifting and other allied works required for construction of tube well.
66SITC of pumping plant 350 LPM discharge 59 mtr. head including starter,control panel, complete in all respect coupled with 10 H.P. Motor .
67Voltage stabilizer (240 to 500V) 15 KVA.
68SITC of main piping and valves with 24m column pipe, electronic type chlorinating plant, power wiring, earthing, painting, tool set, M.S. cross for reducer, wiring of pump house (Internal & External), Chain pulley block and gauges complete in all respect with all required material, T&P and labour. Main Piping and valves of 80mm dia.
693 Mtr. long heavy duty size 80mm dia column pipe same as above spare (for 12 mtr length )
70Copper cable size 2x3x10sq mm. flat
714 x 35 sq. mm Al. cable
72Supply and fixing of fire extinguisher of 5 kg capacity conforming to IS:15683:2006
73Supply of rubber mats for electrical purpose as per IS:5425-1969, plain/chequered (1mX2m)- 19mm thickness
74Motor inspection, B&L and challan fee
75Installation, testing and comissioning of 6 LPH Chlorinating plant.
76Installation, testing and comissioning of pumping plant & associated all equipments as per approved drwaing shall be done by bidder including painting of pumping plant and main piping valves.
77Trial & Run of TW for 3 months Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download BOQ_2129970.xls Tender Documents 0 KB
Download TenderDocumentHandalpurOHT.pdf Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Download 505eaba7-6215-4be7-b2a2-f76c6b901aab.html Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.