Indian Tenders

Tender Notice

TDR 55199378
Tendering Authority Western Coalfields Limited
Tender No WCL wa4350-civ-e004-2026-27/40
Tender ID 2026_WCL_358540_1
Tender Brief Corrigendum : Tender For Assistance To Dust Suppression Through Water Tanker Sprinklers In Two Shifts (1St & 2Nd Shift) And Allied Jobs From In Between Abhaie Fata To Towards Mendholi Fata Under Penganga Sub Area.Nit No.: Wa4350-Civ-E-004-2026-27
City Chandrapur
State Maharashtra
Document Fees Refer document
EMD INR 41700.0 /-
Tender Value INR 33.30 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Assistance To Dust Suppression Through Water Tanker Sprinklers In Two Shifts (1St & 2Nd Shift) And Allied Jobs From In Between Abhaie Fata To Towards Mendholi Fata Under Penganga Sub Area.Nit No.: Wa4350-Civ-E-004-2026-27

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 04-05-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 08-05-2026

Key Dates

Publish Date 04-05-2026
Last Date of Bid Submission 08-05-2026
Tender Opening Date 09-05-2026

Contact Information

Company Name Western Coalfields Limited
Contact Person Jamandlamudi Sachin
Address AGM Office Wani Area

BOQ Items

Name of Work:- Assistance to dust suppression through water tanker sprinklers in two shifts (1st & 2nd shift) and allied jobs from in between Abhaie fata to towards Mendholi Fata under Penganga Sub Area.NIT no.: WA4350-CIV-E-004-2026-27
Sl. No. Item Description
1Continuous assistance in dust suppression by spraying water on roads through mobile water tankers each of 12000 litres capacity.Note:(i) This job is to be carried out by the contractor as per instructions of the Engineer-in-charge or representative.(ii) The contractor is required to carry out the job in two shifts. First shift shall be 06:00 AM to 02:00 PM and second shift shall be from 02:00 PM to 10:00 PM. The job is not to be carried out when it is raining. 12000 litre water has to be filled before the beginning of each trip and it has to be emptied by spraying on the road surface at a uniform rate. Record of route-wise trips executed the representatives of the Engineer-in-charge.. Measurement shall be the route-wise actual number of trips executed.(iii) The contractor is required to deploy water tankers of 12000 litres capacity each with arrangement of spraying water on roads. Each tanker must have all the necessary documents such as valid registration certificate, valid insurance certificate, valid PUC certificate, valid fitness certificate, etc. These documents must be available at all times with the tanker and the contractor shall also be required to submit copies of these documents before deployment of any tanker. Additionally, each tanker must have all the required safety arrangements in working conditions, such as brakes, front lights, back lights, retro-reflective stickers, etc. The contractor has to keep the tankers well-maintained. For this purpose, (different days for different tankers). All the costs such as cost of operators, fuel, oil,water, repair/ maintenance, insurance, etc. are to be borne by the contractor.(iv) The contractor is required to deploy two operators daily (in two shifts) for each tanker. one operator must carry his valid driver's licence. Providing rest days/ holidays/ leaves to them is the responsibility of the contractor and the contractor is also required to deploy suitable relievers/ substitutes. Daily attendance shall be maintained at designated place or as directed from time-to-time.
2On road in between Khandala to towards Abhaie Fata , lead for spraying to be approx 5.5 km,(up&down from filling point) @ 5 trips per shift, i.e. 10 trips in two shifts. As per inst. Of Engg. Incharge.1st shift start from 6 Am to 2 PM & 2nd shift strat from 2 PM to 10 PM.
3On road in between Khandala to towards Mendholi Fata, lead for spraying to be approx 4.5 km,(up&down from filling point) @ 5 trips per shift, i.e. 10 trips in two shifts . As per inst. Of Engg. Incharge.1st shift start from 6 Am to 2 PM & 2nd shift strat from 2 PM to 10 PM.
4Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
5Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information

Other Detail

Information Source https://coalindiatenders.gov.in
Download FileName File Description File Size
Download BOQ_371409.xls Tender Documents 0 KB
Download f93e5ce2-4531-489a-af08-c00d33ac0caf.html Tender Documents 0 KB
Download Tendernotice_1 (8).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.