|
Tender for Revamping And Preventive Maintenance Of Entire Meter Room In Consultation With Best. Liaison Charges To Be In The Included Rates. Cleaning Of Meter Room, Bus Bar Retaping Or New Bus Bars Provision Etc. Complete. , Supply Installation Testing and Commissioning of 30 Ma , 63 Amps 4 Pole Rccbs At Distribution Panels. , Supply Installation Testing and Commissioning of 100 Ma , 63 Amps 4 Pole Rccbs At Distribution Panels. , Supply Installation Testing and Commissioning of 100 Ma , 63 Amps 2 Pole Rccbs At Distribution Panels. , Supply Installation Testing and Commissioning of 30 Ma , 63 Amps 2 Pole Rccbs At Distribution Panels. , Preventive Maintenance Of The Main Lt Panel. Tightening Of All The Terminations, Cleaning Of Cable Cores, Of Stencilling Destinations On Rear And Front Sides Of The Panel. Replacement Of Rusted Hardware Etc. , Preventive Maintenance Of The Floor Lt Panels/ Distribution Boards Of All The Tightening Of Cable Terminations, Cleaning Cores, Of Destinations. Stencilling Of Rusted Replacement Hardware, Dressing Of Cables/Wires, Lugs To Be Provided Wherevr Required Etc. , Supply Installation Testing and Commissioning of Earthing Pits As Per The Design Given In Is 3043 With 50 Mm X 2Mtr Dia Gi Earhting Pipe And Chemical, Chmaber Making And Pit Cover To Be Provided. All Earthing Pits To Be Connected In Grid. , Supply Installation Testing and Commissioning of Lt Insulation Mat 2 Mm Thick To Be Spread In Front Of Panels. , Supply And Laying Of 25 X 3 Mm Gi Earthign Strips From New Earthign Pits. , Supply And Laying Of 16 Guage Gi Wire For Extending Earthing Connections. All Panels/Dbs To Be Provided With Two Body Earthing Connections. , Dressing Of All The Hanging Wires In The Offices On All The Floors. All Dead Wires To Be Removed. All Wires Should Be Laid In Pvc Conduits. , Making Of Single Line Diagrams Of The Main Lt Panel And Floor Panels. , Attending To All Miscelleanous Complaints Given In Electrical Safety Audit Report. , Replacement Of Old Single Pole Mcbs By New Mcbs 6 Amps To 32 Amps , Supply Installation Testing and Commissioning of New 4 Pole Mcbs Of 40 Amps Capacity , Supply Installation Testing and Commissioning of New 12 Way Tpn Disribution Boards In Place Including 63A 4P Rcbo 30Ma & 6 To 32A Single Pole Mcv Of Old Kit Kat Fuse Type Boards With All Tpn And Sp Mcbs Of Equvalient Size. , Supply And Fixing Of Danger Boards Of Suitble Size Near Electrical Panels. , Supply And Fixing Of Cpr Charts As Publsihed By National Safety Council Near Electrical Panels. , Preventive Maintenance Of All The Switch Baords Existing In The Gic Building. Also All Joints On Wiring To Be Remade With Connectors Or Proper Insulation Tape. , Supply And Laying Of 4 Sq.Mm Copper Conductor Wire In Pvc Conduits Wherever Required. (Frlsh) Insulated , Provision Of Sand Buckets With Dry Fine Sand Near Main Electrical Room And Lift Room. , Sealing Of Cable Entry Holes In Panels. , Supply And Installation Of Apfc Panel Of 200 Kvar With Associated Cabling Complete. , Supply Of Loto Kit With Locks And Tags For Locking Mcb/Mccb/Sfu. Lockout Tagout Station-1 No, Osha Safety Padlock-10 Nos, Vinyl Coated Hasp Small-2 Nos, Vinyl Coated Hasp Premier-2 Nos, Non - Conductive Hasp With 4 Holes-2 Pc. , Supply, Installation, Testing And Commissioning (Sitc) Of 250 Amps Fp Mccb-1 Nos. & 125 Amps, 4-Pole Mccb - 2 Nos., Complete With A 300 Amps Rated Prefabricated Copper Busbar System, For Replacement Of The Existing Fuse-Type Distribution Board. With Termination Of Existing 70 Sq.Mm/3.5C Cables Complete. , Supply, Installation, Testing & Commissioning (Sitc) Of 1600 Amps, 50 Ka 4P Air Circuit Breaker (Acb) Enclosure With Including Dismantling And Removal Of Existing Old Acb, Complete Replacement, Termination Of Existing Outgoing 400 Sq.Mm/3.5C X 4Nos Cables, Testing And Commissioning As Required. , Supply, Installation, Testing & Commissioning (Sitc) Of Programmable Timer For Automatic Control Of Air Conditioner In Ups Room & Lift Room, Including Wiring, Mounting, Interconnections And Complete Commissioning. , Revamping Of Existing Changeover Switch Including Retrofitting/Replacement Of Switch Mechanism And Hrc Fuses, Complete With Testing And Commissioning. , Supply, Installation, Testing & Commissioning (Sitc) Of Retrofitting Switch For Ups Input And Output Mccb. , Supply Installation Testing and Commissioning of 6 Sq.Mm/4C 2Xfy Frlsh Cable Wherever Required For Looping Of Distribution Board. , Supply Installation Testing and Commissioning of 10 Sq.Mm/4C 2Xfy Frlsh Cable Wherever Required For Looping Of Distribution Board. , Supply, Installation, Testing & Commissioning (Sitc) Of 250 Amps Fp Mccb-1 Nos & 125 Amps, 4 Pole, Mccb-2 Nos , 63 Amps Fp Mcb -9 Nos Complete With 300 Amps Rated Prefabicated Copper Busbar System, For Replacement Of The Existing Fuse Type Distribution Board With Termination Of Existing Cables , Providing All Materials And Labour For Painting Woodwork, Plain Steel Surfaces, Grills, Etc Including Scaffolding, Scrapping Existing Paint Applying One Coat Primer, Filling The Crevices And Holes With Painters Putty And Finishing With 2/3 Coats Of Approved Quality Of Synthetic Enamel Paint On M.S. Grills/ M.S Shop Doors/Main Gate/M.S Structure To Support To Sintex Tank At The Terrace Level,Etc.
|