Tender Brief Tender For Repairing Of Link Road Jhukiya To Atwa Gul Urwa Via Soti Nala Gram Tapesiya Bandha. (Premixing And Seal Coat Work By Mixal)
City Gonda
State Uttar Pradesh
Document Fees INR 3186 /-
EMD INR 179000.0 /-
Tender Value INR 17.70 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Repairing Of Link Road Jhukiya To Atwa Gul Urwa Via Soti Nala Gram Tapesiya Bandha. (Premixing And Seal Coat Work By Mixal)

Key Dates

Publish Date 21-04-2026
Last Date of Bid Submission 04-05-2026
Tender Opening Date 05-05-2026

Contact Information

Company Name Rajya Krishi Utpadan Mandi Parishad
Contact Person Dy. Director Construction
Address Rajya Krishi Utpadan Mandi Parishad Gonda

BOQ Items

Name of Work:- Repairing of Link Road Jhukiya To Atwa Gul urwa Via Soti Nala Gram Tapesiya Bandha. (Premixing and Seal Coat work By Mixal)
Sl. No. Item Description
1Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8\\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100\\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee.
2WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405
3Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
4Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Mixal, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
5Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Mixal.
6S/F of signboard as per direction of engineer in charge
7S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 350mm Dia Pipe
8(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00%
9(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1.50%
10(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 3.00%
11(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 4.50%
12(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 6.00%
13Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clayor sand) including lift upto1.5 m. lead upto 50 m and dressing of side sand rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C with in a lead of 30 m.(251)
14Providing and laying Cement concrete 1:4:8 (1cement :4 Course sand :8 graded brick Ballast 40mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(S.I. No. 275)
15Class-150 brick work in1:4 (1 cement and 4 coarse sand) mortarin foundationand plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(S.I. 305b)
16Providing and laying Cement concrete 1:2:4 (1 cement : 2coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(279b)
17WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405
18Supply Of Rubber module reflective Zig Zag 80 mm Thick.Precist Compressed C.C. Inter Locking as lock compressive strngth shall not be less then 30MPA and wight not less then 5.50kg each block including of 50mm thich bedding sand joint filling with sand all material labour T&P etc.required for proper complation of the work over the prepared base concrete as directed by Engineering-in-charge .
19(Interlocking Work Item No. 13 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
20(Interlocking Work Item No. 14 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
21(Interlocking Work Item No. 13 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%
22(Interlocking Work Item No. 13 T0 18)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%
23(Interlocking Work Item No. 13 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 8323e900-2855-4ccc-b7c8-029fdb0b49fd.html Tender Documents 0 KB
Download BOQ_2127103.xls Tender Documents 0 KB
Download T1_JhukiyaAtwa_merged.pdf Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.