| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil.-DSR 2023- 2.8.1 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.-DSR 2023- 15.3 |
| 3 | Carriage of materials transport including loading unloading and stacking Lime, moorum, building, rubbish, 5.0 km sanction Rate |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).-DSR 2023- 4.1.8 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)-DSR 2023- 4.1.3 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :, 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)-DSR 2023- 5.2.2 |
| 7 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level. (SI No. 504) (Sanction Rate) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for :, Foundations, footings, bases for columns.-DSR 2023- 4.3.1 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand)-DSR 2023- 6.1.1 |
| 10 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand)-DSR 2023- 13.4.1 |
| 11 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor graded on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. for grading I material (GSB-1) (Sanction rate) |
| 12 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in charge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately).-DSR 2023- 16.75 |
| 13 | Supply and laying of black polytheine sheet as per direction of enggineer in charge etc. all complete S/R |
| 14 | trimixing of CC Surface with hardner 3.50 kg/sqm including proper completion of work-PSR 10 Please Enable Macros to View BoQ information |