| 1 | Routine work in FGD | Routine work in FGD |
| 2 | Engagement of skilled ( Fitter ) cum field operator in 1X660 MW FGD system during a shift (08 hrs.) | Engagement of skilled ( Fitter ) cum field operator in 1X660 MW FGD system during a shift (08 hrs.) |
| 3 | Engagement of unskilled manpower in 1X660 MW FGD system during a shift (08 hrs.) | Engagement of unskilled manpower in 1X660 MW FGD system during a shift (08 hrs.) |
| 4 | General Cleaning work in FGD | General Cleaning work in FGD |
| 5 | Engagement of unskilled manpower in general shift ( 08 Hrs.) | Engagement of unskilled manpower in general shift ( 08 Hrs.) |
| 6 | BREAKDOWN WORK In FGD | BREAKDOWN WORK In FGD |
| 7 | GGH Water High Pressure Water Jet Cleaning | GGH Water High Pressure Water Jet Cleaning |
| 8 | Repairing of Radial and Axial Sector Plates including static seals of GGH | Repairing of Radial and Axial Sector Plates including static seals of GGH |
| 9 | Servicing of Guide Bearing of GGH. | Servicing of Guide Bearing of GGH. |
| 10 | Servicing of Pumps (up to15 KW) i.e. SHC Feed Pump 16 m3/hr, Emergency Storage Tank Pump 160 m3/hr, Limestone Slurry Feed Pump 45 m3/hr, Reclaim(Fitrate) Tank Pump 45 m3/hr, Waste Water Transfer Pump 13 m3/hr etc.) | Servicing of Pumps (up to15 KW) i.e. SHC Feed Pump 16 m3/hr, Emergency Storage Tank Pump 160 m3/hr, Limestone Slurry Feed Pump 45 m3/hr, Reclaim(Fitrate) Tank Pump 45 m3/hr, Waste Water Transfer Pump 13 m3/hr etc.) |
| 11 | Replacement of drive belt of Pumps (up to15 KW) | Replacement of drive belt of Pumps (up to15 KW) |
| 12 | Routine work in SCR | Routine work in SCR |
| 13 | Engagement of unskilled Manpower in 1X660 MW SCR system during a shift (08 hrs.) | Engagement of unskilled Manpower in 1X660 MW SCR system during a shift (08 hrs.) |
| 14 | BREAKDOWN WORK In SCR | BREAKDOWN WORK In SCR |
| 15 | Welding Works( Repaining of Duct/ Reactor chamber/Piping etc | Welding Works( Repaining of Duct/ Reactor chamber/Piping etc |
| 16 | Erection of Scaffolding | Erection of Scaffolding |
| 17 | Replacement of flange gasket of head valve assembly of LRSB | Replacement of flange gasket of head valve assembly of LRSB |
| 18 | Servicing of gear boxes of rotary/Traverse motion of LRSB | Servicing of gear boxes of rotary/Traverse motion of LRSB |
| 19 | Replacement of orifices of soot blowing system | Replacement of orifices of soot blowing system |
| 20 | Repairing/replacement of damaged trip rod cover plate/trip rod by proper grinding & welding with suitable cast iron welding electrode | Repairing/replacement of damaged trip rod cover plate/trip rod by proper grinding & welding with suitable cast iron welding electrode |
| 21 | Servicing of carriage housing of LRSB | Servicing of carriage housing of LRSB |
| 22 | Replacement of gland packing to arrest steam leakage from LRSB lance tube | Replacement of gland packing to arrest steam leakage from LRSB lance tube |
| 23 | Replacement of damaged lance tube of LRSB | Replacement of damaged lance tube of LRSB |
| 24 | Straightening of bend lance tube of LRSB | Straightening of bend lance tube of LRSB |
| 25 | Complete servicing/revisioning of jam long retractable soot blowers (LRSB) for their smooth operation | Complete servicing/revisioning of jam long retractable soot blowers (LRSB) for their smooth operation |