Indian Tenders

Tender Notice

TDR 55139445
Tendering Authority Uttar Pradesh Power Corporation Limited
Tender No GEM/2026/B/7443761
Tender ID GEM/2026/B/7443761
Tender Brief Corrigendum : Bids Are invited for Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&
City Agra
State Uttar Pradesh
Document Fees Refer document
EMD INR 10000.0 /-
Tender Value INR 10 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) a) ST pole 9.0/11.0/13.0 Mtr. long , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) b) PCC pole 8.5 Mtr. long , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) C) 16 KVA T/F , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) E) 25/63 KVA T/F , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 100 KVA T/F , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 250 KVA T/F , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) G) Metering Cubical , Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm cable , Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required , Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. , Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. , Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. , Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. , Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. , Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. , Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. , Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor , Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon Conductor , Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) 50/95/120 sqmm Areal Bunch Conductor. , Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. , Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2x1.5, 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. , Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6 dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2×2 and covering the same by a stone pad for the purpose of poring water for moisture. , Mounting of following T/F on existing double pole/single pole & making HT/LT connection a) 16 KVA T/F. , Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25/63 KVA T/F. , Mounting of following T/F on existing double pole/single pole & making HT/LT connection D) 100 KVA T/F. , Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. , Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable With Making Loop complete work as per RESPO norms and direction by supervising Engineer. , Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm by drill machine/ H.D.D. Machine threw H.D.P.E. Pipe 6 Dia including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine as per for complete the work as RESPO norms. , Fixing of H.D.P.E. Pipe 6 Dia for Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable through Above H.D.P.E. Pipe). , Fixing of G.I. Pipe 6 Dia for Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm as per direction by supervising Engineer , Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1 class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable. , Removal of 63/100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end. , Removal of 16/25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end. , Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer , Making HT T off connection on existing mains labour, T &P and carrier etc. required for proper completion of work. , Installation of D.O. Fuse set on Double pole , Filling of 11 KV 3×35/70/120/185/240 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer on double pole. , Fixing of LT distribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement. , Providing & Fixing of Bolt & Nut of various sizes as per RESPO Manual Labour, T &P and carrier etc other associated works shall be born by the contractor at his own cost. , Fabircation & Fixing of Top Channel, Dropper Channel, T-off Channel & Base Angle with Hole as per RESPO Manual. Labour, T &P and carrier etc including Fabircation work shall be born by the contractor at his own cost. , Providing & Fixing of Stone Pad 300x300x75 mm Make as per RESPO Manual Labour, T &P and carriage etc and other associated works to complete the work shall be born by the contractor at his own cost. , Erection & Commissioning of Metering Cubical in all respects as per RESPO Norms and direction by supervising Engineer. , Re- sagging and stringing of ABC Conductor, Dog/Recoon & ACSR Weasel conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work. , Fixing of Bracket with Channel, Base Angle & Clamp on STP/PCC Poles as per RESPO Manual. , Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. , Installation of 11 KV Meter Piller Box & Making connection.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 07-05-2026 11-05-2026
2 04-05-2026 07-05-2026

Key Dates

Publish Date 07-05-2026
Last Date of Bid Submission 11-05-2026
Tender Opening Date 11-05-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 282005,EDC-I , B-690 Kamla Nagar, Agra

BOQ Items

Sl. No. Item TitleItem Description
1Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) a) ST pole 9.0/11.0/13.0 Mtr. longCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) a) ST pole 9.0/11.0/13.0 Mtr. long
2Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) b) PCC pole 8.5 Mtr. longCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) b) PCC pole 8.5 Mtr. long
3Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) C) 16 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) C) 16 KVA T/F
4Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) E) 25/63 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) E) 25/63 KVA T/F
5Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 100 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 100 KVA T/F
6Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 250 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 250 KVA T/F
7Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) G) Metering CubicalCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) G) Metering Cubical
8Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm cableCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm cable
9Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if requiredCarriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required
10Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
11Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
12Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
13Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
14Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
15Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
16Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
17Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductorLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor
18Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon ConductorLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon Conductor
19Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) 50/95/120 sqmm Areal Bunch Conductor.Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) 50/95/120 sqmm Areal Bunch Conductor.
20Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
21Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
22Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
23Mounting of following T/F on existing double pole/single pole & making HT/LT connection a) 16 KVA T/F.Mounting of following T/F on existing double pole/single pole & making HT/LT connection a) 16 KVA T/F.
24Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25/63 KVA T/F.Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25/63 KVA T/F.
25Mounting of following T/F on existing double pole/single pole & making HT/LT connection D) 100 KVA T/F.Mounting of following T/F on existing double pole/single pole & making HT/LT connection D) 100 KVA T/F.
26Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
27Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable With Making Loop complete work as per RESPO norms and direction by supervising Engineer.Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable With Making Loop complete work as per RESPO norms and direction by supervising Engineer.
28Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm by drill machine/ H.D.D. Machine threw H.D.P.E. Pipe 6\\" Dia including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine as per for complete the work as RESPO norms.Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm by drill machine/ H.D.D. Machine threw H.D.P.E. Pipe 6\\" Dia including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine as per for complete the work as RESPO norms.
29Fixing of H.D.P.E. Pipe 6\\" Dia for Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable through Above H.D.P.E. Pipe).Fixing of H.D.P.E. Pipe 6\\" Dia for Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable through Above H.D.P.E. Pipe).
30Fixing of G.I. Pipe 6\\" Dia for Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm as per direction by supervising EngineerFixing of G.I. Pipe 6\\" Dia for Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm as per direction by supervising Engineer
31Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1\\" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1\\" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.
32Removal of 63/100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.Removal of 63/100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
33Removal of 16/25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.Removal of 16/25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
34Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineerCutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
35Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.
36Installation of D.O. Fuse set on Double poleInstallation of D.O. Fuse set on Double pole
37Filling of 11 KV 3×35/70/120/185/240 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer on double pole.Filling of 11 KV 3×35/70/120/185/240 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer on double pole.
38Fixing of LT distribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.Fixing of LT distribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
39Providing & Fixing of Bolt & Nut of various sizes as per RESPO Manual Labour, T &P and carrier etc other associated works shall be born by the contractor at his own cost.Providing & Fixing of Bolt & Nut of various sizes as per RESPO Manual Labour, T &P and carrier etc other associated works shall be born by the contractor at his own cost.
40Fabircation & Fixing of Top Channel, Dropper Channel, T-off Channel & Base Angle with Hole as per RESPO Manual. Labour, T &P and carrier etc including Fabircation work shall be born by the contractor at his own cost.Fabircation & Fixing of Top Channel, Dropper Channel, T-off Channel & Base Angle with Hole as per RESPO Manual. Labour, T &P and carrier etc including Fabircation work shall be born by the contractor at his own cost.
41Providing & Fixing of Stone Pad 300x300x75 mm Make as per RESPO Manual Labour, T &P and carriage etc and other associated works to complete the work shall be born by the contractor at his own cost.Providing & Fixing of Stone Pad 300x300x75 mm Make as per RESPO Manual Labour, T &P and carriage etc and other associated works to complete the work shall be born by the contractor at his own cost.
42Erection & Commissioning of Metering Cubical in all respects as per RESPO Norms and direction by supervising Engineer.Erection & Commissioning of Metering Cubical in all respects as per RESPO Norms and direction by supervising Engineer.
43Re- sagging and stringing of ABC Conductor, Dog/Recoon & ACSR Weasel conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work.Re- sagging and stringing of ABC Conductor, Dog/Recoon & ACSR Weasel conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work.
44Fixing of Bracket with Channel, Base Angle & Clamp on STP/PCC Poles as per RESPO Manual.Fixing of Bracket with Channel, Base Angle & Clamp on STP/PCC Poles as per RESPO Manual.
45Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
46Installation of 11 KV Meter Piller Box & Making connection.Installation of 11 KV Meter Piller Box & Making connection.

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download ca2813f1-8764-4927-8d0f-ea5db49813cc.pdf Tender Documents 0 KB
Download 1776251677.xlsx Tender Documents 0 KB
Download 1776317248.pdf Tender Documents 0 KB
Download 1776317262.pdf Tender Documents 0 KB
Download 1776317281.pdf Tender Documents 0 KB
Download 1776317287.pdf Tender Documents 0 KB
Download 1776317296.pdf Tender Documents 0 KB
Download 1776317301.pdf Tender Documents 0 KB
Download 1776317306.pdf Tender Documents 0 KB
Download 1776317312.pdf Tender Documents 0 KB
Download 1776317323.pdf Tender Documents 0 KB
Download 1776317329.pdf Tender Documents 0 KB
Download 1776317353.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.