Indian Tenders

Tender Notice

TDR 55095852
Tendering Authority Telecommunications Consultants India Limited
Tender No TCIL/ITTIV/94/2026_1
Tender ID 2026_TCIL_274790_1
Tender Brief Corrigendum : Tender For Price Bid expression of interest No: Tcil/Ittiv/94/2026_1 Date:15/04/2026 Selection Of Pre-Bid Partner For Establishing Network Operation Centre (Noc) For Grid-India Along With Enhanced Hardware Infrastructure For Existing
City Delhi
State Delhi
Document Fees INR 11800 /-
EMD INR 500000.0 /-
Tender Value Refer document
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Price Bid expression of interest No: Tcil/Ittiv/94/2026_1 Date:15/04/2026 Selection Of Pre-Bid Partner For Establishing Network Operation Centre (Noc) For Grid-India Along With Enhanced Hardware Infrastructure For Existing Soc Name Of The Bidder Company : Sn Item Description Unit Qty (A) Unit Price (Inr) (B) Price Exluding Gst (Inr) C=A X B Gst(%) (D) Total Price Incl Gst(Inr) C X (100+D)/100 A Cost Of The Software & Hardware Including 5 Years Back-To-Back Oem Warranty As Per Ts And Installation And Configuration. , Network Visibility, Management & Configuration Including Necessary Capturing Devices (If Any) At Both Central And All 6 Site Locations , Network Visibility And Management Tool Along With Server Monitoring , Network Device Configuration Manager (Ncm) , Network And Application Packet Capturing And Analysis System, Along With Central Service Dashboard Including Necessary Capturing Devices (If Any) At Both Central And (All 6) Site Locations , Network Detection & Response (Ndr) Including Necessary Capturing Devices (If Any) At Both Central And All 6 Site Locations , Service Management And Ticketing Tool Including Necessary Systems / Subscriptions For Complete 5 Years Tenure Of The Project Along With Cost Of Migration (If Any) , Hardware And Software For Above Tools At Remote Locations , Network Taps (With Unidirectional Restrictions At The Hardware Level) , Pfs With 48 X 10G Interfaces Sw+Hw , Managed L3 Switch (8 X1/10G Interfaces With Sw+Hw) , 1. Other Hardware And Software Components (Such As Trap Server/Collector With Storage) Required To Collect & Store (5 Days Data In Case Of Link Failure) Data From Ot Network Through Unidirectional Gateway (At Physical Level) For The Tools Mentioned In Item 1.1 (10 Nos.) 2. Other Hardware And Software Components (Such As Trap Server/Collector With Storage) Required To Collect & Store (5 Days Data In Case Of Link Failure) Data From It Network For The Tools Mentioned In Item 1.1(6 Nos.) , Hardware And Storage (With Necessary Software) For The Above Tool At Central Noc Location , Server Hardware / Appliance Along With Required Os, Application, Databases And Accessories For Storing And Retaining All Data For At Least 01 Year At Dc Delhi , 2X2 55 Inch Video Wall With Controller For Integrating The Panels To A Single Display , 24 Inch Workstation With Cpu And Os , Unidirectional Air-Gapped Gate Between It And Ot Integration , Necessary Hardware And Software For Data And Configuration Backup Of Dc At Backup Site. , Any Other Software, Hardware, Db Etc. Required To Provide End-To-End Solution , Bidder Efforts & Oem Cost For Installation And Configuration B Comprehensive Operation And Maintenance , Deputation Of L2 Resource On 24 X 7 Basis , Cost For Initial Tuning And System Configuration By Engaging Technical Expert (As Per Qualification Available In Ts For A Period Of At Least 6 Month) Till Tuning Of The System Whichever Is Later. , Comprehensive Operation And Maintenance Cost Of Bidder Including Oem Scope Of Work (Including Audit Cost And Compliance To Various External/Internal Audit Finding Etc.) Grand Total Including Gst Note A) Products/Items Mentioned Above Shall Meet All The Requirements Specified Under Technical Specification. B) Minimum 20% Of Total Contract Price (Supply Installation And Comprehensive Operation And Maintenance) Shall Be Kept For Comprehensive Operation And Maintenance.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 07-05-2026 Corrigendum7 Date 14-05-2026
2 05-05-2026 Corrigendum6 Date 07-05-2026
3 05-05-2026 Corrigendum6 Date 07-05-2026
4 04-05-2026 Corrigendum5 Date 05-05-2026
5 04-05-2026 Corrigendum5 Date 05-05-2026
6 04-05-2026 Corrigendum5 Date 05-05-2026
7 27-04-2026 Corrigendum4 Date 04-05-2026
8 27-04-2026 Corrigendum3 Technical Bid 04-05-2026
9 27-04-2026 Corrigendum4 Date 04-05-2026
10 27-04-2026 Corrigendum3 Technical Bid 07-05-2026
11 27-04-2026 Corrigendum4 Date 04-05-2026
12 27-04-2026 Corrigendum3 Technical Bid 05-05-2026
13 27-04-2026 Corrigendum4 Date 04-05-2026
14 27-04-2026 Corrigendum3 Technical Bid 14-05-2026
15 23-04-2026 Corrigendum2 Date 01-05-2026
16 23-04-2026 Corrigendum2 Date 01-05-2026
17 23-04-2026 Corrigendum2 Date 01-05-2026
18 23-04-2026 Corrigendum2 Date 01-05-2026
19 23-04-2026 Corrigendum2 Date 01-05-2026
20 22-04-2026 Corrigendum1 Date 23-04-2026
21 22-04-2026 Corrigendum1 Date 23-04-2026
22 22-04-2026 Corrigendum1 Date 23-04-2026
23 22-04-2026 Corrigendum1 Date 23-04-2026
24 22-04-2026 Corrigendum1 Date 23-04-2026

Key Dates

Publish Date 07-05-2026
Last Date of Bid Submission 14-05-2026
Tender Opening Date 14-05-2026

Contact Information

Company Name Telecommunications Consultants India Limited
Contact Person DGM DC and CS
Address TCIL Bhawan Greater Kailash I

BOQ Items

Name of Work:-
Sl. No. Item Description
1PRICE BID EOI No: TCIL/ITTIV/94/2026_1 Date:15/04/2026 Selection of pre-bid partner for “Establishing Network Operation Centre (NOC) For GRID-INDIA Along with enhanced Hardware Infrastructure for existing SOC \\" Name of the Bidder Company : SN Item Description unit Qty(A) Unit Price(INR)(B) Price exluding GST(INR)C=A x B GST(%)(D) Total Price incl GST(INR)C x (100+D)/100 A Cost of the Software & Hardware including 5 years Back-to-Back OEM Warranty as per TS and Installation and Configuration.
2Network Visibility, Management & Configuration including necessary capturing devices (if any) at both Central and all 6 site locations
3Network visibility and management tool along with Server monitoring
4Network Device Configuration Manager (NCM)
5Network and Application Packet Capturing and Analysis System, along with Central Service Dashboard including necessary capturing devices (if any) at both Central and (all 6) site locations
6Network Detection & Response (NDR) including necessary capturing devices (if any) at both Central and all 6 site locations
7Service management and ticketing tool including necessary systems / subscriptions for complete 5 years tenure of the project along with cost of migration (if any)
8Hardware and software for above tools at Remote locations
9Network Taps (with unidirectional restrictions at the hardware level)
10PFS with 48 x 10G Interfaces SW+HW
11Managed L3 Switch (8 X1/10G interfaces with SW+HW)
121. Other Hardware and software components (such as Trap server/collector with storage) required to collect & store (5 days’ data in case of link failure) data from OT network through Unidirectional gateway (at physical level) for the tools mentioned in item 1.1 (10 nos.) 2. Other Hardware and software components (such as Trap server/collector with storage) required to collect & store (5 days data in case of link failure) data from IT network for the tools mentioned in item 1.1(6 nos.)
13Hardware and storage (with necessary software) for the above tool at central NOC location
14Server Hardware / Appliance along with required OS, Application, Databases and accessories for storing and retaining all data for at least 01 year at DC Delhi
152x2 55 inch Video Wall with Controller for integrating the Panels to a single display
1624’ inch Workstation with CPU and OS
17Unidirectional air-gapped gate between IT and OT integration
18Necessary hardware and software for data and configuration backup of DC at backup site.
19Any other software, hardware, DB etc. required to provide end-to-end solution
20Bidder Efforts & OEM Cost for Installation and Configuration B Comprehensive Operation and Maintenance
21Deputation of L2 Resource on 24 x 7 basis
22Cost for initial tuning and system configuration by engaging technical expert (as per qualification available in TS for a period of at least 6 month) till Tuning of the system whichever is later.
23Comprehensive Operation and Maintenance cost of Bidder including OEM scope of work (including audit cost and compliance to various external/internal audit finding etc.) Grand total including GST Note a) Products/items mentioned above shall meet all the requirements specified under technical specification. b) Minimum 20% of total contract price (Supply Installation and Comprehensive Operation and Maintenance) shall be kept for Comprehensive Operation and Maintenance.

Other Detail

Information Source https://etenders.gov.in/eprocure/app
Download FileName File Description File Size
Download 978e52f0-5d20-49aa-b9dd-06b2f55c3567.html Tender Documents 0 KB
Download TCILBOQ.xls Tender Documents 0 KB
Download TenderDocument.pdf Tender Documents 0 KB
Download Tendernotice_1 (2).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.