Name of Work:- Routine, preventive, breakdown maintenance and overhauling jobs (Mechanical works) of Pressure Parts, Wind Box and Burners, Air Pre-Heaters, SCAPHs, ESPs, Aux. PRDS, Ducts, D ers & Gates, Coal pipes, Soot Blowers, Safety valves, HP/LP piping and manual valves, Fuel firing system (including fuel oil pump house) etc. of Boilers of 2x210 MW and 2x250 MW BHEL make Units of GHTP, Lehra Mohabat. | Sl. No. | Item Description | |
| 1 | To attend various Routine, preventive, breakdown maintenance and overhauling jobs (Mechanical works) of Pressure Parts, Wind Box and Burners, Air Pre-Heaters, SCAPHs, ESPs, Aux. PRDS, Ducts, Dampers & Gates, Coal pipes, Soot Blowers, Safety valves, HP/LP piping and manual valves, Fuel firing system (including fuel oil pump house) etc. of Boilers of 2x210 MW and 2x250 MW BHEL make Units of Stage-I & II at GHTP, Lehra Mohabat. | | 2 | To attend to various overhaul works pertaining to Boiler pressure parts, Wind Box & Burners, Air Pre-heaters, ESPs, Ducts, Dampers & Gates, Aux. PRDS, HP/LP Piping & manual/safety valves etc. of any one Unit of BHEL make 2X210 MW/ 2X250 MW Boiler at GHTP on Lump sum basis as per scope of work in Section-VIII-B during Annual/Mini overhauling of the Unit includes 03 MT of consumption of 6mm steel sheet. | | 3 | Rate for additional HP Joints up to 76.1 mm dia. beyond 250 Nos. in each overhauling of Unit including Radiography, if required. | | 4 | Rate for Replacement/Reversal of Inter-mediate Baskets beyond 20 nos. in each overhauling of Unit. | | 5 | Rate for Lowering/Taking out of additional Economizer Coils, if required. | | 6 | Overhauling of Safety valves, HP & LP Valves & Piping, Coal Piping, Ducts & their Expansion Joints, Dampers & Gates, Mechanical works of ESPs and LDO/HFO Pumps of any one Unit of BHEL make 2X210 MW/ 2X250 MW Boiler at GHTP on Lump sum basis as per scope of work in Section-VIII-C during Capital/Major overhauling of the Unit includes 06 MT of consumption of 6mm steel sheet. | | 7 | Rate for replacement of 6mm sheet beyond 03 MT for Mini/ Annual Overhauling (1.02) and 06 MT for Capital/ Major overhauling (1.06) of repairing of ducting system mentioned in Section-VIII-B and Section-VIII-C on Tonnage basis. | | 8 | Deployment of manpower for unforeseen jobs as per scope of work Section-VIII-D of Tender Specification | | 9 | Fitter (Mandays) | | 10 | Welder (Mandays) | | 11 | Grinder man/Gas cutter/Electrician. (Mandays) | | 12 | Rigger (Mandays) | | 13 | Skilled Worker (Mandays) | | 14 | Unskilled worker (Mandays) Please Enable Macros to View BoQ information |
|