Indian Tenders

Tender Notice

TDR 55071412
Tendering Authority Maharashtra Metro Rail Corporation Limited
Tender No N2-079/AFC-04/2026
Tender ID 2026_MMRCL_1294629_1
Tender Brief Corrigendum : Tender For Design, Supply, Installation, Testing And Commissioning Of Open Loop Emv Ncmc Card And Qr Based Automatic Fare Collection (Afc) System Along With Camc For Nagpur Metro Rail Project Phase-Ii
City Nagpur
State Maharashtra
Document Fees INR 88500 /-
EMD INR 7700000.0 /-
Tender Value INR 154.30 Crore /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Design, Supply, Installation, Testing And Commissioning Of Open Loop Emv Ncmc Card And Qr Based Automatic Fare Collection (Afc) System Along With Camc For Nagpur Metro Rail Project Phase-Ii

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 23-04-2026 PreBid Link Other 25-05-2026

Key Dates

Publish Date 23-04-2026
Last Date of Bid Submission 25-05-2026

Contact Information

Company Name Maharashtra Metro Rail Corporation Limited
Contact Person ED_procurement
Address Metro Bhawan, East High Court Road (VIP Road), Near Dikshabhoomi, Ramdaspeth, Nagpur-440010

BOQ Items

Name of Work:- DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II
Sl. No. Item Description
1Laying and Jointing PVC Pipe. Heading
2DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II MAHARASHTRA METRO RAIL CORPORATION LIMITEDDESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II Name of Bidder 0.0 BID SUMMERY Quoted Price Conversion Rate as per ITB 32.1 Total Converted Amount in INR USD EURO INR USD EURO INR In Figure In Words 0.0 0.0 0.0 0.0 INR Zero Only MAHARASHTRA METRO RAIL CORPORATION LIMITED\\"DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II” Bid Total [THIS DOCUMENT IS TO BE PREAPARED AND COMPLETED BY THE TENDERER] The total fixed Lump Sum Price of this Contract for AFC System is: Foreign Currency(USD) Foreign Currency(EURO) Indian Rupees(INR) In figures: 0.0 In figures: 0.0 In figures: 0.0 In words: In words: In words: The above lump sum price including taxes shall be apportioned among the cost centre as below: Apportionment of Lump Sum Price among Cost Centres as per Annexure-1 SECTION : FOR ALL REACH Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture, and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) 0.0 0.0 0.0 SECTION MS - MISCELLANEOUS (ALL REACH) Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) H SHE, IT and Any other Requirements 0.0 0.0 0.0 TOTAL (H) 0.0 0.0 0.0 SECTION - Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) I Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) 0.0 0.0 0.0 TOTAL (I) 0.0 0.0 0.0 BID TOTAL (A to I) 0.0 0.0 0.0 Note: Prices for Cost Centres to be indicated in above table shall match with amount quoted for Cost of Schedules provided in APPENDIX 1 (Minimum BOQ for AFC System) PRICING DOCUMENTSCHEDULE OF AMOUNTS APPORTIONED TO COST CENTRES as per Annexure-1 1- REACH 1A1 SECTION (PS) Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture, and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) = 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) = 0.0 0.0 0.0 TOTAL (A to G) for REACH-1A1 (PS) = 0.0 0.0 0.0 2- REACH 1A2 SECTION Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture, and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) = 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) = 0.0 0.0 0.0 TOTAL (A to G) for REACH-1A2 = 0.0 0.0 0.0 3- REACH 2A1 SECTION Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture, and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) = 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) = 0.0 0.0 0.0 TOTAL (A to G) for REACH-2A1 = 0.0 0.0 0.0 4- REACH 2A2 SECTION Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture, and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) = 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) = 0.0 0.0 0.0 TOTAL (A to G) for REACH-2A2 = 0.0 0.0 0.0 5- REACH 3A SECTION Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) = 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) = 0.0 0.0 0.0 TOTAL (A to G) for REACH-3A = 0.0 0.0 0.0 6- REACH 4A SECTION Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) A Plans & Design Document 0.0 0.0 0.0 B Manufacture, and Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 TOTAL (A to D) = 0.0 0.0 0.0 Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instruments 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 TOTAL (E to G) = 0.0 0.0 0.0 TOTAL (A to G) for REACH-4A = 0.0 0.0 0.0 7. All Reaches (MISCELLANEOUS) Section Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) H SHE, IT and Any other Requirements 0.0 0.0 0.0 TOTAL (H) for ALL REACHES = 0.0 0.0 0.0 8. Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) Cost Centre Cost Centre Description Total Apportioned Amounts of Cost Centre Items (In USD) (In EURO) (In INR) I Comprehensive Annual Maintenance Contract (CAMC) OCC, BCC & SDC 0.0 0.0 0.0 Comprehensive Annual Maintenance Contract (CAMC) R1A1 Section 0.0 0.0 0.0 Comprehensive Annual Maintenance Contract (CAMC) R1A2 Section 0.0 0.0 0.0 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section 0.0 0.0 0.0 Comprehensive Annual Maintenance Contract (CAMC) R2A2 Section 0.0 0.0 0.0 Comprehensive Annual Maintenance Contract (CAMC) R3A Section 0.0 0.0 0.0 Comprehensive Annual Maintenance Contract (CAMC) R4A Section 0.0 0.0 0.0 TOTAL (I) 0.0 0.0 0.0 MAHARASHTRA METRO RAIL CORPORATION LIMITED\\"DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II”(THIS DOCUMENT IS TO BE PREAPARED AND COMPLETED BY THE TENDERER) Annexure-1INDEX OF COST CENTRES INDEX OF COST CENTRES Cost Centre Cost Centre Description Cost to be apportioned (Excluding Cost of CAMC) A Plans & Design Documents Not more than 7% of Bid Total B Manufacture, and Delivery Not more than 45% of Bid Total C Installation, Site Testing Not more than 8 % of Bid Total D System Acceptance Test, Integrated Testing and Commissioning Not more than 10% of Bid Total I Comprehensive Maintenance Period (60 Months) Not less than 20% of Bid Total SECTION MS - MISCELLANEOUS Cost Centre Cost Centre Description Cost to be apportioned (Excluding Cost of CAMC) E Training Amount quoted in section MS and relevant cost centre shall be actual cost & not apportioned cost. (Service during DLP shall not be less than 2%) F Spares, Special Tools, Testing Equipment and Measuring Instruments G Service during DLP (24 Months) for the commissioned and tested Systems H SHE, IT and Any other Requirements SECTION Comprehensive Maintenance Period (60 Months) Cost Centre Cost Centre Description Cost to be apportioned I Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) 1. Cost of 1st Year CAMC - Not more than 10% of Total cost of CAMC2. Cost of 2nd Year CAMC - Not more than 15% of Total cost of CAMC3. Cost of 3rd Year CAMC - Not more than 20% of Total cost of CAMC4. Cost of 4th Year CAMC - Not more than 25% of Total cost of CAMC5. Cost of 5th Year CAMC - Not more than 30% of Total cost of CAMC PRICING DOCUMENTAnnexure-1 SCHEDULE OF AMOUNTS APPORTIONED TO COST CENTRES (Annexure-1) Cost Centre Descriptions (To be completed and submitted as part of ‘Schedules’ under Section IV: Bidding Forms) 1- REACH 1A1 SECTION (PS) 1.1 REACH 1A¹ SECTION (PS) - COST CENTRE No. A: Plans & Design Documents This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:A. Contractor’s Project Plan, Document Submission Procedure, Social, Health & Safety Plans, Interface Management Plan with Designated Contractors.B. Works Programme and Document Submission Programme.C. Submission of Plans such as:a) Preliminary System Assurance Plansb) EMC Management Plans.c) RAMS Plansd) Software Quality Assurance Planse) Quality Plans.f) Site Safety Plans.g) System Verification and Validation Planh) SHE Plani) Earthing, Lightning and surge Protection Planj) OthersD. Preliminary System Design for AFC System, consisting of:a) Preliminary System design including system architecture, software design specifications etc. for Automatic Fare Collection system at Stations including quantities of components for all stations.b) Software and system verification and validation standards with complete verification and validation documents for all Stations.c) Preliminary System design including system architecture, software design specifications etc. for Automatic Fare Collection system at OCC & BCC including quantities of components in OCC & BCC . d) Software and system verification and validation standards with complete verification and validation documents for OCC & BCCe) Specifications for Automatic Fare Collections equipment for OCC & BCC including the requirement of power, space and mounting details f) Layout Plan of Automatic Fare Collection equipment at OCC & BCC including cable routes etc.g) Specifications for Automatic Fare Collections equipment for 1A1 Section station including the requirement of power, space and mounting details. h) Layout Plan of Automatic Fare Collection equipment at for 1A1 Section station including cable routes etc.i) Layout plan of Automatic Fare Collection equipment at Software Testing & Development Centre (SDC), for installation and cable routes of AFC equipment such as Gates, Ticket Office Machine (TOM), Digital Kiosk, TVM, Cashless Card Dispenser, Ticket Reader (TR) etc.j) Detailed Interface Documents with the Designated Contractors.k) Detailed design for interface with Bank/ Financial Institute.l) Detailed Interface design documents for integration with CCHS.m) Detailed interface design document for integration with NMRP Phase-I AFC SystemE. Final System Design of AFC System, consisting of:a) Final design of all Automatic Fare Collection system for OCC & BCC.b) Final design of AFC system for Stations, all sub-systems for Automatic Fare Collection e.g. Automatic Gates, Ticket Office Machine/EFO, Validator, Digital Kiosk, TVM, Cashless Card Dispenser, HHD, cabling, station computers, Router, switch, swing barrier, Emergency switch with housing etc., for NMRP Phase-II. c) Final drawings for the accepted Final Design for AFC systems for OCC & BCC.d) Final drawings for the accepted Final Design for AFC systems for Stations for 1A1 Section.e) Complete software application, COTS, licenses for OCC & BCC.f) Complete software application, COTS, licenses for Station equipments for 1A1 Section. g) Any other item(s)considered necessary to comply with Scope of Work. 1.1 REACH 1A¹ SECTION (PS) - COST CENTRE No. A: Plans & Design Documents Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: A1 Contractor’s Project Plan, Document Submission Procedure, Social, Health & Safety Plans, Interface Management Plan with Designated Contractors. A2 Works Programme and Document Submission Programme. A3 Submission of all the Plans as per GS & PS. A4 Preliminary System design including system architecture, software design specifications etc. for Automatic Fare Collection system at Stations including quantities of components for all the stations. A5 Software and system verification and validation standards with complete verification and validation document for all the stations. A6 Preliminary System design including system architecture, software design specifications etc. for Automatic Fare Collection system at OCC & BCC including quantities of components in OCC & BCC A7 Software and system verification and validation standards with complete verification and validation documents for OCC & BCC A8 Specifications for Automatic Fare Collections equipment for OCC & BCC including the requirement of power, space and mounting details A9 Layout Plan of Automatic Fare Collection equipment at OCC & BCC including cable routes etc. A10 Specifications for Automatic Fare Collections equipment for 1A1 Section station including the requirement of power, space and mounting details. A11 Layout Plan of Automatic Fare Collection equipment at for 1A1 Section station including cable routes etc. A12 Layout plan of Automatic Fare Collection equipment at Software Testing & Development Centre (SDC), for installation and cable routes of AFC equipment such as Gates, Ticket Office Machine (TOM), Digital Kiosk, TVM, Cashless Card Dispenser, Ticket Reader (TR) etc. A13 Detailed Interface Documents with the Designated Contractors. A14 Detailed design for interface with Bank/ Financial Institute A15 Detailed Interface design documents for integration with CCHS. A16 Detailed interface design document for integration with NMRP Phase-I AFC System A17 Final design of all Automatic Fare Collection system for OCC & BCC A18 Final design of AFC system for Stations, all sub-systems for Automatic Fare Collection e.g. Automatic Gates, Ticket Office Machine/EFO, Validator, Digital Kiosk, TVM, Cashless Card Dispenser, HHD, cabling, station computers, Router, switch, swing barrier, Emergency switch with housing etc., for NMRP Phase-II. A19 Final drawings for the accepted Final Design for AFC systems for OCC & BCC A20 Final drawings for the accepted Final Design for AFC systems for Stations for 1A1 Section A21 Complete software application, COTS, licenses for OCC & BCC. A22 Complete software application, COTS, licenses for Station equipments for 1A1 Section. A23 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 1.2 REACH 1A¹ SECTION (PS) - COST CENTRE No. B: Manufacture, and Delivery This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt / delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance: at Contractors premises in NagpurAFC SystemA. Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises.B. Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises.C. Delivery of EFO with all associated accessories at Contractor's premises.D. Delivery of Digital Kiosk with all associated accessories at Contractor Premises.E. Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises.F. Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises.G. Delivery of Hand-Held device (HHD) with all associated accessories at Contractor PremisesH. Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises I. Delivery of OCC & BCC : Central AFC Backoffice System/ Central Computer system (CCS) including QRTE, interface hardware with all associated accessories etc. and associated work stations at Contractor's premises.J. Delivery of Equipment’s for Software Testing and Development Center (SDC) and Software Production Test Lab with all associated accessories at Contractor's premises.K. Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises.L. Delivery of all Network equipments for OCC, BCC, SDC & R1A1 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises.M. Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises.N. Delivery of QR Ticket and other consumables at Contractor's premises O. Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises.P. Delivery of L2 & L3 Certification Q. Delivery of PCI-DSS CertificationR. Delivery of required hardware and software for integration with Phase-I AFC System (if any).S. Delivery of requisites for integration with CCHS (if any).T. Delivery of API & DLLU. Delivery of TVM with all associated accessories at Contractor Premises.V. Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. 1.2 REACH 1A¹ SECTION (PS) - COST CENTRE No. B: Manufacture and Delivery Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for:- Issue of Inspection Certificate on satisfactory completion of all Factory Tests / running - Delivery at Project site in Nagpur.- Transit Insurancefor: B1 Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises. B2 Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises. B3 Delivery of EFO with all associated accessories at Contractor's premises. B4 Delivery of Digital Kiosk with all associated accessories at Contractor Premises. B5 Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises. B6 Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises. B7 Delivery of Hand-Held device (HHD) with all associated accessories at Contractor Premises B8 Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises B9 Delivery of OCC & BCC : Central AFC Backoffice System/ Central Computer system (CCS) including QRTE, interface hardware with all associated accessories etc. and associated work stations at Contractor's premises. B10 Delivery of Equipment’s for Software Testing and Development Center (SDC) and Software Production Test Lab with all associated accessories at Contractor's premises. B11 Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises. B12 Delivery of all Network equipments for OCC, BCC, SDC & R1A1 section such as Data Switches, Firewall etc. with all associated accessories at Contractor premises. B13 Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises. B14 Delivery of QR Ticket and other consumables at Contractor's premises B15 Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises. B16 Delivery of L2 & L3 Certification B17 Delivery of PCI-DSS Certification B18 Delivery of required hardware and software for integration with Phase-I AFC System (if any). B19 Delivery of requisites for integration with CCHS (if any). B20 Delivery of API & DLL B21 Delivery of TVM with all associated accessories at Contractor Premises. B22 Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 1.3 REACH 1A¹ SECTION (PS) - COST CENTRE No. C: Installation, Site Testing This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Shifting to Site from Contractor’s premises, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for OCC & BCC.B. Shifting to Site from Contractor’s premises at Nagpur Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for Software Development Centre.C. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for OCC & BCC.D. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for Software Development Centre.E. Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for 1A1 Section StationsF. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 1A1 Section Stations.G. Any other item(s) considered necessary to comply with Scope of Work. 1.3 REACH 1A¹ SECTION (PS) - COST CENTRE No. C: Installation, Site Testing Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: C1 Shifting to Site from Contractor’s premises, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for OCC & BCC. C2 Shifting to Site from Contractor’s premises at Nagpur Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for Software Development Centre. C3 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for OCC & BCC. C4 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for Software Development Centre. C5 Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for 1A1 Section Stations C6 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 1A1 Section Stations. C7 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 1.4 REACH 1A¹ SECTION (PS) - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R1A1 SectionB. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for OCC & BCC.C. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Software Development Centre.D. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System.E. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions.F. Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST).G. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with CCHS.H. As build drawings.I. Any other items considered necessary to comply with the Scope of Works. 1.4 REACH 1A¹ SECTION (PS) - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: D1 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R1A1 Section D2 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for OCC & BCC. D3 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Software Development Centre. D4 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System. D5 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions. D6 Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST). D7 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with CCHS. D8 As build drawings. D9 Any other items considered necessary to comply with the Scope of Works. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 1.5 REACH 1A¹ SECTION (PS) - COST CENTRE No. E (MISCELLANEOUS): Training This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Training of Operation and Maintenance personnel of the Employer in India.B. Training of Operation and Maintenance personnel of the Employer at the OEM facilities in overseas.C. Supplying training manuals and associated materials.D. Provision of Operating manuals- (Hard copies and in Electronic format).E. Provision of Maintenance Manuals (Hard copies and in Electronic format).F. Any other item(s) considered necessary to comply with the Scope of Work.Notes: The travel, boarding and lodging expenses for the Employer’s trainees shall be borne by the Employer. 1.5 REACH 1A¹ SECTION (PS) - COST CENTRE No. E (MISCELLANEOUS): Training Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: E1 Training of Employer’s personnel (30 Man Days) overseas in OEM premises. (Number of Trainees as per employer’s discretion) E2 Provision of OEM’s Instructors (20 days) for training of Employer’s Operating & Maintenance personnel in India. (Number of Trainees as per employer’s discretion) E3 Submission of Training Manuals, Operation Manuals, Spare part Catalogues , other documentation (Original plus two hard copies) and in electronic format. E4 Any other item(s) necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 1.6 REACH 1A¹ SECTION (PS) - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:A. Supply of Spares.B. Supply of special tools and equipment, testing and measuring instrumentsC. Any other item(s) considered necessary by the Contractor to comply with the Scope of Work.Note : Cost centre F will be only considered for price bid evaluation only. Spares will be procured after completion of CAMC.Contractor to furnish current price of the spares in BID. Spares will be procured after completion of CAMC at escalation rate of 05% for Indian rupee and 02% for foreign Currency per annum.Milestone and supply date will be finalised before 6 month of expiry of CAMC period. 1.6 REACH 1A¹ SECTION (PS) - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for delivery of the following in accordance with the Work’s Requirements: F1 Delivery of spares F2 Delivery of special tools, Testing Equipment and Measuring Instrument F3 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 1.7 REACH 1A¹ SECTION (PS) - COST CENTRE No. G (MISCELLANEOUS): Maintenance Service during DLP (24 Months) for the commissioned and tested Systems This Cost Centre comprises supervision of maintenance of AFC systems:• Maintenance Service during DLP (24 Months) for the commissioned and tested Systems.Note: Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. 1.7 REACH 1A¹ SECTION (PS) - COST CENTRE No. G (MISCELLANEOUS): Service during DLP (24 Months) for the commissioned and tested Systems Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Employer’s personnel for completion of the following in accordance with the Work’s Requirements: G1 Service during DLP 1st Year for the commissioned and tested Systems G2 Service during DLP 2nd Year for the commissioned and tested Systems COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2- REACH 1A2 SECTION 2.1 REACH 1A2 SECTION - COST CENTRE No. A: Plans & Design Documents This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:A. Specifications for Automatic Fare Collections equipment for 1A2 Section station including the requirement of power, space and mounting details. B. Layout Plan of Automatic Fare Collection equipment at for 1A2 Section station including cable routes.C. Detailed Interface Documents with the Designated Contractors for 1A2 Section station.D. Detailed design for interface with Bank/ Financial Institution.E. Detailed interface design document for integration with NMRP Phase-I AFC SystemF. Final drawings for the accepted Final Design for AFC systems for Stations for 1A2 Section.G. Complete software application, COTS, licenses for Station equipments for 1A2 Section.H. Any other item(s) considered necessary to comply with the Scope of Work. 2.1 REACH 1A2 SECTION - COST CENTRE No. A: Plans & Design Documents Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: A1 Specifications for Automatic Fare Collections equipment for 1A2 Section station including the requirement of power, space and mounting details. A2 Layout Plan of Automatic Fare Collection equipment at for 1A2 Section station including cable routes. A3 Detailed Interface Documents with the Designated Contractors for 1A2 Section station A4 Detailed design for interface with Bank/ Financial Institute. A5 Detailed interface design document for integration with NMRP Phase-I AFC System A6 Final drawings for the accepted Final Design for AFC systems for Stations for 1A2 Section. A7 Complete software application, COTS, licenses for Station equipments for 1A2 Section. A8 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2.2 REACH 1A2 SECTION - COST CENTRE No. B: Manufacture, and Delivery This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt / delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance: at Contractors premises in NagpurAFC SystemA. Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises.B. Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises.C. Delivery of EFO with all associated accessories at Contractor's premises.D. Delivery of Digital Kiosk with all associated accessories at Contractor Premises.E. Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises.F. Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises.G. Delivery of Hand-Held device (HHD) with all associated accessories at Contractor PremisesH. Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises I. Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises.J. Delivery of all Network equipments for 1A2 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises.K. Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises.L. Delivery of QR Ticket and other consumables at Contractor's premises M. Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises.N. Delivery of required hardware and software for integration with Phase-I AFC System (if any).O.Delivery of TVM with all associated accessories at Contractor Premises.P. Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. 2.2 REACH 1A2 SECTION - COST CENTRE No. B: Manufacture, and Delivery Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for:- Issue of Inspection Certificate on satisfactory completion of all Factory Tests / running - Delivery at Project site in Nagpur.- Transit Insurancefor: B1 Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises. B2 Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises. B3 Delivery of EFO with all associated accessories at Contractor's premises. B4 Delivery of Digital Kiosk with all associated accessories at Contractor Premises. B5 Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises. B6 Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises. B7 Delivery of Hand-Held device (HHD) with all associated accessories at Contractor Premises B8 Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises B9 Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises. B10 Delivery of all Network equipments for 1A2 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises. B11 Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises. B12 Delivery of QR Ticket and other consumables at Contractor's premises B13 Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises. B14 Delivery of required hardware and software for integration with Phase-I AFC System (if any). B15 Delivery of TVM with all associated accessories at Contractor Premises. B16 Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2.3 REACH 1A2 SECTION - COST CENTRE No. C: Installation, Site Testing This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for 1A2 Section StationsB. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 1A2 Section Stations.C. Any other item(s) considered necessary to comply with Scope of Work. 2.3 REACH 1A2 SECTION - COST CENTRE No. C: Installation, Site Testing Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: C1 Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for 1A2 Section Stations C2 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 1A2 Section Stations. C3 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2.4 REACH 1A2 SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R1A2 SectionB. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System.C. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions.D. Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST).E. As build drawings.F. Any other items considered necessary to comply with the Scope of Works. 2.4 REACH 1A2 SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: D1 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R1A2 Section D2 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System. D3 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions. D4 Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST). D5 As build drawings. D6 Any other items considered necessary to comply with the Scope of Works. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2.5 REACH 1A2 SECTION - COST CENTRE No. E (MISCELLANEOUS): Training This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Training of Operation and Maintenance personnel of the Employer in India.B. Training of Operation and Maintenance personnel of the Employer at the OEM facilities in overseas.C. Supplying training manuals and associated materials.D. Provision of Operating manuals- (Hard copies and in Electronic format).E. Provision of Maintenance Manuals (Hard copies and in Electronic format).F. Any other item(s) considered necessary to comply with the Scope of Work.Notes: The travel, boarding and lodging expenses for the Employer’s trainees shall be borne by the Employer. 2.5 REACH 1A2 SECTION - COST CENTRE No. E (MISCELLANEOUS): Training Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: E1 Training of Employer’s personnel (30 Man Days) overseas in OEM premises. (Number of Trainees as per employer’s discretion) E2 Provision of OEM’s Instructors (20 days) for training of Employer’s Operating & Maintenance personnel in India. (Number of Trainees as per employer’s discretion) E3 Submission of Training Manuals, Operation Manuals, Spare part Catalogues , other documentation (Original plus two hard copies) and in electronic format. E4 Any other item(s) necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2.6 REACH 1A2 SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:A. Supply of Spares.B. Supply of special tools and equipment, testing and measuring instrumentsC. Any other item(s) considered necessary by the Contractor to comply with the Scope of Work.Note : Cost centre F will be only considered for price bid evaluation only. Spares will be procured after completion of CAMC.Contractor to furnish current price of the spares in BID. Spares will be procured after completion of CAMC at escalation rate of 05% for Indian rupee and 02% for foreign Currency per annum.Milestone and supply date will be finalised before 6 month of expiry of CAMC period. 2.6 REACH 1A2 SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools,Testing Equipment and Measuring Instrument Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for delivery of the following in accordance with the Work’s Requirements: F1 Delivery of spares F2 Delivery of special tools, Testing Equipment and Measuring Instrument F3 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 2.7 REACH 1A2 SECTION - COST CENTRE No. G (MISCELLANEOUS): Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems This Cost Centre comprises supervision of maintenance of AFC systems:• Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems.Note: Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. 2.7 REACH 1A2 SECTION - COST CENTRE No. G (MISCELLANEOUS): Service during DLP (24 Months) for the commissioned and tested Systems Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Employer’s personnel for completion of the following in accordance with the Work’s Requirements: G1 Service during DLP 1st Year for the commissioned and tested Systems G2 Service during DLP 2nd Year for the commissioned and tested Systems COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3- REACH 2A1 SECTION 3.1 REACH 2A¹ SECTION - COST CENTRE No. A: Plans & Design Documents This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:A. Specifications for Automatic Fare Collections equipment for 2A1 Section station including the requirement of power, space and mounting details. B. Layout Plan of Automatic Fare Collection equipment at for 2A1 Section station including cable routes.C. Detailed Interface Documents with the Designated Contractors for 2A1 Section station.D. Detailed design for interface with Bank/ Financial Institution.E. Detailed interface design document for integration with NMRP Phase-I AFC SystemF. Final drawings for the accepted Final Design for AFC systems for Stations for 2A1 Section.G. Complete software application, COTS, licenses for Station equipments for 2A1 Section.H. Any other item(s) considered necessary to comply with the Scope of Work. 3.1 REACH 2A¹ SECTION - COST CENTRE No. A: Plans & Design Documents Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: A1 Specifications for Automatic Fare Collections equipment for 2A1 Section station including the requirement of power, space and mounting details. A2 Layout Plan of Automatic Fare Collection equipment at for 2A1 Section station including cable routes. A3 Detailed Interface Documents with the Designated Contractors for 2A1 Section station A4 Detailed design for interface with Bank/ Financial Institute. A5 Detailed interface design document for integration with NMRP Phase-I AFC System A6 Final drawings for the accepted Final Design for AFC systems for Stations for 2A1 Section. A7 Complete software application, COTS, licenses for Station equipments for 2A1 Section. A8 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.2 REACH 2A¹ SECTION - COST CENTRE No. B: Manufacture, and Delivery This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt / delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance: at Contractors premises in NagpurAFC SystemA. Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises.B. Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises.C. Delivery of EFO with all associated accessories at Contractor's premises.D. Delivery of Digital Kiosk with all associated accessories at Contractor Premises.E. Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises.F. Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises.G. Delivery of Hand-Held device (HHD) with all associated accessories at Contractor PremisesH. Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises I. Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises.J. Delivery of all Network equipments for 2A1 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises.K. Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises.L. Delivery of QR Ticket and other consumables at Contractor's premises M. Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises.N. Delivery of required hardware and software for integration with Phase-I AFC System (if any).O.Delivery of TVM with all associated accessories at Contractor Premises.P. Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. 3.2 REACH 2A¹ SECTION - COST CENTRE No. B: Manufacture, and Delivery Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for:- Issue of Inspection Certificate on satisfactory completion of all Factory Tests / running - Delivery at Project site in Nagpur.- Transit Insurancefor: B1 Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises. B2 Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises. B3 Delivery of EFO with all associated accessories at Contractor's premises. B4 Delivery of Digital Kiosk with all associated accessories at Contractor Premises. B5 Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises. B6 Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises. B7 Delivery of Hand-Held device (HHD) with all associated accessories at Contractor Premises B8 Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises B9 Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises. B10 Delivery of all Network equipments for 2A1 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises. B11 Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises. B12 Delivery of QR Ticket and other consumables at Contractor's premises B13 Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises. B14 Delivery of required hardware and software for integration with Phase-I AFC System (if any). B15 Delivery of TVM with all associated accessories at Contractor Premises. B16 Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.3 REACH 2A¹ SECTION - COST CENTRE No. C: Installation, Site Testing This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for 2A1 Section StationsB. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 2A1 Section Stations.C. Any other item(s) considered necessary to comply with Scope of Work. 3.3 REACH 2A¹ SECTION - COST CENTRE No. C: Installation, Site Testing Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: C1 Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for 2A1 Section Stations C2 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 2A1 Section Stations. C3 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.4 REACH 2A¹ SECTION (PS) - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R2A1 SectionB. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System.C. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions.D. Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST).E. As build drawings.F. Any other items considered necessary to comply with the Scope of Works. 3.4 REACH 2A¹ SECTION (PS) - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: D1 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R2A1 Section D2 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System. D3 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions. D4 Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST). D5 As build drawings. D6 Any other items considered necessary to comply with the Scope of Works. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.5 REACH 2A¹ SECTION - COST CENTRE No. E (MISCELLANEOUS): Training This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Training of Operation and Maintenance personnel of the Employer in India.B. Training of Operation and Maintenance personnel of the Employer at the OEM facilities in overseas.C. Supplying training manuals and associated materials.D. Provision of Operating manuals- (Hard copies and in Electronic format).E. Provision of Maintenance Manuals (Hard copies and in Electronic format).F. Any other item(s) considered necessary to comply with the Scope of Work.Notes: The travel, boarding and lodging expenses for the Employer’s trainees shall be borne by the Employer. Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.5 REACH 2A¹ SECTION - COST CENTRE No. E (MISCELLANEOUS): Training Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: E1 Training of Employer’s personnel (30 Man Days) overseas in OEM premises. (Number of Trainees as per employer’s discretion) E2 Provision of OEM’s Instructors (20 days) for training of Employer’s Operating & Maintenance personnel in India. (Number of Trainees as per employer’s discretion) E3 Submission of Training Manuals, Operation Manuals, Spare part Catalogues , other documentation (Original plus two hard copies) and in electronic format. E4 Any other item(s) necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.6 REACH 2A¹ SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:A. Supply of Spares.B. Supply of special tools and equipment, testing and measuring instrumentsC. Any other item(s) considered necessary by the Contractor to comply with the Scope of Work.Note : Cost centre F will be only considered for price bid evaluation only. Spares will be procured after completion of CAMC.Contractor to furnish current price of the spares in BID. Spares will be procured after completion of CAMC at escalation rate of 05% for Indian rupee and 02% for foreign Currency per annum.Milestone and supply date will be finalised before 6 month of expiry of CAMC period. 3.6 REACH 2A¹ SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Furniture, Testing Equipment and Measuring Instrument Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for delivery of the following in accordance with the Work’s Requirements: F1 Delivery of spares F2 Delivery of special tools, Testing Equipment and Measuring Instrument F3 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 3.7 REACH 2A¹ SECTION - COST CENTRE No. G (MISCELLANEOUS): Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems This Cost Centre comprises supervision of maintenance of AFC systems:• Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems.Note: Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. SECTION -III : REACH 2A1 Miscellaneous 3.7 REACH 2A¹ SECTION - COST CENTRE No. G (MISCELLANEOUS): Service during DLP (24 Months) for the commissioned and tested Systems Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Employer’s personnel for completion of the following in accordance with the Work’s Requirements: G1 Service during DLP 1st Year for the commissioned and tested Systems G2 Service during DLP 2nd Year for the commissioned and tested Systems COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4- REACH 2A2 SECTION 4.1 REACH 2A2 SECTION - COST CENTRE No. A: Plans & Design Documents This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:A. Specifications for Automatic Fare Collections equipment for 2A2 Section station including the requirement of power, space and mounting details. B. Layout Plan of Automatic Fare Collection equipment at for 2A2 Section station including cable routes.C. Detailed Interface Documents with the Designated Contractors for 2A1 Section station.D. Detailed design for interface with Bank/ Financial Institution.E. Detailed interface design document for integration with NMRP Phase-I AFC SystemF. Final drawings for the accepted Final Design for AFC systems for Stations for 2A2 Section.G. Complete software application, COTS, licenses for Station equipments for 2A2 Section.H. Any other item(s) considered necessary to comply with the Scope of Work. 4.1 REACH 2A2 SECTION - COST CENTRE No. A: Plans & Design Documents Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: A1 Specifications for Automatic Fare Collections equipment for 2A2 Section station including the requirement of power, space and mounting details. A2 Layout Plan of Automatic Fare Collection equipment at for 2A2 Section station including cable routes. A3 Detailed Interface Documents with the Designated Contractors for 2A2 Section station A4 Detailed design for interface with Bank/ Financial Institute. A5 Detailed interface design document for integration with NMRP Phase-I AFC System A6 Final drawings for the accepted Final Design for AFC systems for Stations for 2A2 Section. A7 Complete software application, COTS, licenses for Station equipments for 2A2 Section. A8 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.2 REACH 2A2 SECTION - COST CENTRE No. B: Manufacture, and Delivery This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt / delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance: at Contractors premises in NagpurAFC SystemA. Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises.B. Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises.C. Delivery of EFO with all associated accessories at Contractor's premises.D. Delivery of Digital Kiosk with all associated accessories at Contractor Premises.E. Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises.F. Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises.G. Delivery of Hand-Held device (HHD) with all associated accessories at Contractor PremisesH. Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises I. Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises.J. Delivery of all Network equipments for 2A2 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises.K. Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises.L. Delivery of QR Ticket and other consumables at Contractor's premises M. Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises.N. Delivery of required hardware and software for integration with Phase-I AFC System (if any).O.Delivery of TVM with all associated accessories at Contractor Premises.P. Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. 4.2 REACH 2A2 SECTION - COST CENTRE No. B: Manufacture, and Delivery Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for:- Issue of Inspection Certificate on satisfactory completion of all Factory Tests / running - Delivery at Project site in Nagpur.- Transit Insurancefor: B1 Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises. B2 Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises. B3 Delivery of EFO with all associated accessories at Contractor's premises. B4 Delivery of Digital Kiosk with all associated accessories at Contractor Premises. B5 Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises. B6 Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises. B7 Delivery of Hand-Held device (HHD) with all associated accessories at Contractor Premises B8 Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises B9 Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises. B10 Delivery of all Network equipments for 2A2 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises. B11 Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises. B12 Delivery of QR Ticket and other consumables at Contractor's premises B13 Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises. B14 Delivery of required hardware and software for integration with Phase-I AFC System (if any). B15 Delivery of TVM with all associated accessories at Contractor Premises. B16 Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.3 REACH 2A2 SECTION - COST CENTRE No. C: Installation, Site Testing This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for 2A2 Section StationsB. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 2A2 Section Stations.C. Any other item(s) considered necessary to comply with Scope of Work. 4.3 REACH 2A2 SECTION - COST CENTRE No. C: Installation, Site Testing Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: C1 Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for 2A2 Section Stations C2 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 2A2 Section Stations. C3 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.4 REACH 2A2 SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R2A2 SectionB. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System.C. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions.D. Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST).E. As build drawings.F. Any other items considered necessary to comply with the Scope of Works. 4.4 REACH 2A2 SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: D1 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of R2A2 Section D2 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System. D3 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions. D4 Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST). D5 As build drawings. D6 Any other items considered necessary to comply with the Scope of Works. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.5 REACH 2A2 SECTION - COST CENTRE No. E (MISCELLANEOUS): Training This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to: A. Training of Operation and Maintenance personnel of the Employer in India.B. Training of Operation and Maintenance personnel of the Employer at the OEM facilities in overseas.C. Supplying training manuals and associated materials.D. Provision of Operating manuals- (Hard copies and in Electronic format).E. Provision of Maintenance Manuals (Hard copies and in Electronic format).F. Any other item(s) considered necessary to comply with the Scope of Work.Notes: The travel, boarding and lodging expenses for the Employer’s trainees shall be borne by the Employer. Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.5 REACH 2A2 SECTION - COST CENTRE No. E (MISCELLANEOUS): Training Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: E1 Training of Employer’s personnel (30 Man Days) overseas in OEM premises. (Number of Trainees as per employer’s discretion) E2 Provision of OEM’s Instructors (20 days) for training of Employer’s Operating & Maintenance personnel in India. (Number of Trainees as per employer’s discretion) E3 Submission of Training Manuals, Operation Manuals, Spare part Catalogues , other documentation (Original plus two hard copies) and in electronic format. E4 Any other item(s) necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.6 REACH 2A2 SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:A. Supply of Spares.B. Supply of special tools and equipment, testing and measuring instrumentsC. Any other item(s) considered necessary by the Contractor to comply with the Scope of Work.Note : Cost centre F will be only considered for price bid evaluation only. Spares will be procured after completion of CAMC.Contractor to furnish current price of the spares in BID. Spares will be procured after completion of CAMC at escalation rate of 05% for Indian rupee and 02% for foreign Currency per annum.Milestone and supply date will be finalised before 6 month of expiry of CAMC period. 4.6 REACH 2A2 SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for delivery of the following in accordance with the Work’s Requirements: F1 Delivery of spares F2 Delivery of special tools, Testing Equipment and Measuring Instrument F3 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 4.7 REACH 2A2 SECTION - COST CENTRE No. G (MISCELLANEOUS): Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems This Cost Centre comprises supervision of maintenance of AFC systems: • Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems. Note: Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. 4.7 REACH 2A2 SECTION - COST CENTRE No. G (MISCELLANEOUS): Service during DLP (24 Months) for the commissioned and tested Systems Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Employer’s personnel for completion of the following in accordance with the Work’s Requirements: G1 Service during DLP 1st Year for the commissioned and tested Systems G2 Service during DLP 2nd Year for the commissioned and tested Systems COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5- REACH 3A SECTION 5.1 REACH 3A SECTION - COST CENTRE No. A: Plans & Design Documents This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:A. Specifications for Automatic Fare Collections equipment for 3A Section station including the requirement of power, space and mounting details. B. Layout Plan of Automatic Fare Collection equipment at for 3A Section station including cable routes.C. Detailed Interface Documents with the Designated Contractors for 3A Section station.D. Detailed design for interface with Bank/ Financial Institution.E. Detailed interface design document for integration with NMRP Phase-I AFC SystemF. Final drawings for the accepted Final Design for AFC systems for Stations for3A Section.G. Complete software application, COTS, licenses for Station equipments for 3A Section.H. Any other item(s) considered necessary to comply with the Scope of Work. 5.1 REACH 3A SECTION - COST CENTRE No. A: Plans & Design Documents Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: A1 Specifications for Automatic Fare Collections equipment for 3A Section station including the requirement of power, space and mounting details. A2 Layout Plan of Automatic Fare Collection equipment at for 3A Section station including cable routes. A3 Detailed Interface Documents with the Designated Contractors for 3A Section station A4 Detailed design for interface with Bank/ Financial Institute. A5 Detailed interface design document for integration with NMRP Phase-I AFC System A6 Final drawings for the accepted Final Design for AFC systems for Stations for 3A Section. A7 Complete software application, COTS, licenses for Station equipments for 3A Section. A8 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5.2 REACH 3A SECTION - COST CENTRE No. B: Manufacture, and Delivery This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt / delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance: at Contractors premises in NagpurAFC SystemA. Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises.B. Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises.C. Delivery of EFO with all associated accessories at Contractor's premises.D. Delivery of Digital Kiosk with all associated accessories at Contractor Premises.E. Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises.F. Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises.G. Delivery of Hand-Held device (HHD) with all associated accessories at Contractor PremisesH. Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises I. Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises.J. Delivery of all Network equipments for 2A2 section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises.K. Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises.L. Delivery of QR Ticket and other consumables at Contractor's premises M. Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises.N. Delivery of required hardware and software for integration with Phase-I AFC System (if any).O.Delivery of TVM with all associated accessories at Contractor Premises.P. Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. 5.2 REACH 3A SECTION - COST CENTRE No. B: Manufacture, and Delivery Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for:- Issue of Inspection Certificate on satisfactory completion of all Factory Tests / running - Delivery at Project site in Nagpur.- Transit Insurancefor: B1 Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises. B2 Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises. B3 Delivery of EFO with all associated accessories at Contractor's premises. B4 Delivery of Digital Kiosk with all associated accessories at Contractor Premises. B5 Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises. B6 Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises. B7 Delivery of Hand-Held device (HHD) with all associated accessories at Contractor Premises B8 Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises B9 Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises. B10 Delivery of all Network equipments for 3A section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises. B11 Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises. B12 Delivery of QR Ticket and other consumables at Contractor's premises B13 Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises. B14 Delivery of required hardware and software for integration with Phase-I AFC System (if any). B15 Delivery of TVM with all associated accessories at Contractor Premises. B16 Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5.3 REACH 3A SECTION - COST CENTRE No. C: Installation, Site Testing This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for 3A Section StationsB. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 3A Section Stations.C. Any other item(s) considered necessary to comply with Scope of Work. 5.3 REACH 3A SECTION - COST CENTRE No. C: Installation, Site Testing Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: C1 Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for 3A Section Stations C2 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 3A Section Stations. C3 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5.4 REACH 3A SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of 3A SectionB. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System.C. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions.D. Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST).E. As build drawings.F. Any other items considered necessary to comply with the Scope of Works. 5.4 REACH 3A SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: D1 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of 3A Section D2 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System. D3 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions. D4 Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST). D5 As build drawings. D6 Any other items considered necessary to comply with the Scope of Works. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5.5 REACH 3A SECTION - COST CENTRE No. E (MISCELLANEOUS): Training This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Training of Operation and Maintenance personnel of the Employer in India.B. Training of Operation and Maintenance personnel of the Employer at the OEM facilities in overseas.C. Supplying training manuals and associated materials.D. Provision of Operating manuals- (Hard copies and in Electronic format).E. Provision of Maintenance Manuals (Hard copies and in Electronic format).F. Any other item(s) considered necessary to comply with the Scope of Work.Notes: The travel, boarding and lodging expenses for the Employer’s trainees shall be borne by the Employer. 5.5 REACH 3A SECTION - COST CENTRE No. E (MISCELLANEOUS): Training Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: E1 Training of Employer’s personnel (30 Man Days) overseas in OEM premises. (Number of Trainees as per employer’s discretion) E2 Provision of OEM’s Instructors (20 days) for training of Employer’s Operating & Maintenance personnel in India. (Number of Trainees as per employer’s discretion) E3 Submission of Training Manuals, Operation Manuals, Spare part Catalogues , other documentation (Original plus two hard copies) and in electronic format. E4 Any other item(s) necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5.6 REACH 3A SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:A. Supply of Spares.B. Supply of special tools and equipment, testing and measuring instrumentsC. Any other item(s) considered necessary by the Contractor to comply with the Scope of Work.Note : Cost centre F will be only considered for price bid evaluation only. Spares will be procured after completion of CAMC.Contractor to furnish current price of the spares in BID. Spares will be procured after completion of CAMC at escalation rate of 05% for Indian rupee and 02% for foreign Currency per annum.Milestone and supply date will be finalised before 6 month of expiry of CAMC period. 5.6 REACH 3A SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for delivery of the following in accordance with the Work’s Requirements: F1 Delivery of spares F2 Delivery of special tools, Testing Equipment and Measuring Instrument F3 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 5.7 REACH 3A SECTION - COST CENTRE No. G (MISCELLANEOUS): Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems This Cost Centre comprises supervision of maintenance of AFC systems:• Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems.Note: Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. 5.7 REACH 3A SECTION - COST CENTRE No. G (MISCELLANEOUS): Service during DLP (24 Months) for the commissioned and tested Systems Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Employer’s personnel for completion of the following in accordance with the Work’s Requirements: G1 Service during DLP 1st Year for the commissioned and tested Systems G2 Service during DLP 2nd Year for the commissioned and tested Systems COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6- REACH 4A SECTION 6.1 REACH 4A SECTION - COST CENTRE No. A: Plans & Design Documents This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:A. Specifications for Automatic Fare Collections equipment for 4A Section station including the requirement of power, space and mounting details. B. Layout Plan of Automatic Fare Collection equipment at for 4A Section station including cable routes.C. Detailed Interface Documents with the Designated Contractors for 4A Section station.D. Detailed design for interface with Bank/ Financial Institution.E. Detailed interface design document for integration with NMRP Phase-I AFC SystemF. Final drawings for the accepted Final Design for AFC systems for Stations for 4A Section.G. Complete software application, COTS, licenses for Station equipments for 4A Section.H. Any other item(s) considered necessary to comply with the Scope of Work. 6.1 REACH 4A SECTION - COST CENTRE No. A: Plans & Design Documents Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: A1 Specifications for Automatic Fare Collections equipment for 4A Section station including the requirement of power, space and mounting details. A2 Layout Plan of Automatic Fare Collection equipment at for 4A Section station including cable routes. A3 Detailed Interface Documents with the Designated Contractors for 4A Section station A4 Detailed design for interface with Bank/ Financial Institute. A5 Detailed interface design document for integration with NMRP Phase-I AFC System A6 Final drawings for the accepted Final Design for AFC systems for Stations for 4A Section. A7 Complete software application, COTS, licenses for Station equipments for 4A Section. A8 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.2 REACH 4A SECTION - COST CENTRE No. B: Manufacture, and Delivery This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt / delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance: at Contractors premises in NagpurAFC SystemA. Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises.B. Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises.C. Delivery of EFO with all associated accessories at Contractor's premises.D. Delivery of Digital Kiosk with all associated accessories at Contractor Premises.E. Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises.F. Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises.G. Delivery of Hand-Held device (HHD) with all associated accessories at Contractor PremisesH. Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises I. Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises.J. Delivery of all Network equipments for 4A section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises.K. Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises.L. Delivery of QR Ticket and other consumables at Contractor's premises M. Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises.N. Delivery of required hardware and software for integration with Phase-I AFC System (if any).O.Delivery of TVM with all associated accessories at Contractor Premises.P. Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. 6.2 REACH 4A SECTION - COST CENTRE No. B: Manufacture, and Delivery Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for:- Issue of Inspection Certificate on satisfactory completion of all Factory Tests / running - Delivery at Project site in Nagpur.- Transit Insurancefor: B1 Delivery of Automatic Gates including, Entry, Exit, Reversible, Wide bidirectional gates with all associated accessories at Contractor's premises. B2 Delivery of Ticket Office Machine (TOM) with all associated accessories at Contractor's premises. B3 Delivery of EFO with all associated accessories at Contractor's premises. B4 Delivery of Digital Kiosk with all associated accessories at Contractor Premises. B5 Delivery of Cashless Card Dispenser with all associated accessories at Contractor Premises. B6 Delivery of Ticket Readers (TR) with all associated accessories at Contractor's premises. B7 Delivery of Hand-Held device (HHD) with all associated accessories at Contractor Premises B8 Delivery of Station Computer Unit (SCU) with all associated accessories at contractor premises B9 Delivery of all type of cables, connectors, Emergency Plunger at Contractor's premises. B10 Delivery of all Network equipments for 4A section such as Data Switches, Routers, Firewall etc. with all associated accessories at Contractor premises. B11 Delivery of all Racks (Network Switch rack, Server racks etc), DB at Contractor premises. B12 Delivery of QR Ticket and other consumables at Contractor's premises B13 Delivery of Swing Gate, Fixed Barricades etc with all associated accessories at Contractor premises. B14 Delivery of required hardware and software for integration with Phase-I AFC System (if any). B15 Delivery of TVM with all associated accessories at Contractor Premises. B16 Any other item(s) considered necessary to comply with Scope of Work. Specify the items with unit cost and quantity. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.3 REACH 4A SECTION - COST CENTRE No. C: Installation, Site Testing This includes but is not limited to: This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:A. Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation/Commissioning Verification Records (IVR) (includes pre-installation tests, post installation tests for all sub-system) for 4A Section StationsB. Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 4A Section Stations.C. Any other item(s) considered necessary to comply with Scope of Work. 6.3 REACH 4A SECTION - COST CENTRE No. C: Installation, Site Testing Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: C1 Shifting to Site from Contractor’s premises at Nagpur, Submission of Installation/Commissioning Verification Records (IVR) plan & procedure and Completion of Installation (includes pre-installation tests, post installation tests for all sub-system) for 4A Section Stations C2 Submission of Partial Acceptance Tests ( PAT) Plan & Procedure and Completion of Partial Acceptance Tests ( PAT) for 4A Section Stations. C3 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.4 REACH 4A SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of 4A SectionB. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System.C. Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions.D. Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST).E. As build drawings.F. Any other items considered necessary to comply with the Scope of Works. 6.4 REACH 4A SECTION - COST CENTRE No. D: System Acceptance Test, Integrated Testing and Commissioning Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: D1 Submission of System Acceptance tests (SAT) Plan & Procedure and Completion of System Acceptance tests (SAT) for Stations of 4A Section D2 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Phase-I AFC System. D3 Submission of Integrated testing Plan & Procedure and Completion of Integrated testing with Banks/ Financial Institutions. D4 Submission of Integrated testing and commissioning (ITC) and Service Trial (ST) Plan & Procedure and Completion of Integrated testing and commissioning (ITC) & Service trials (ST). D5 As build drawings. D6 Any other items considered necessary to comply with the Scope of Works. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.5 REACH 4A SECTION - COST CENTRE No. E (MISCELLANEOUS): Training This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:A. Training of Operation and Maintenance personnel of the Employer in India.B. Training of Operation and Maintenance personnel of the Employer at the OEM facilities in overseas.C. Supplying training manuals and associated materials.D. Provision of Operating manuals- (Hard copies and in Electronic format).E. Provision of Maintenance Manuals (Hard copies and in Electronic format).F. Any other item(s) considered necessary to comply with the Scope of Work.Notes: The travel, boarding and lodging expenses for the Employer’s trainees shall be borne by the Employer. Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.5 REACH 4A SECTION - COST CENTRE No. E (MISCELLANEOUS): Training Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for: E1 Training of Employer’s personnel (30 Man Days) overseas in OEM premises. (Number of Trainees as per employer’s discretion) E2 Provision of OEM’s Instructors (20 days) for training of Employer’s Operating & Maintenance personnel in India. (Number of Trainees as per employer’s discretion) E3 Submission of Training Manuals, Operation Manuals, Spare part Catalogues , other documentation (Original plus two hard copies) and in electronic format. E4 Any other item(s) necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.6 REACH 4A SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:A. Supply of Spares.B. Supply of special tools and equipment, testing and measuring instrumentsC. Any other item(s) considered necessary by the Contractor to comply with the Scope of Work.Note : Cost centre F will be only considered for price bid evaluation only. Spares will be procured after completion of CAMC.Contractor to furnish current price of the spares in BID. Spares will be procured after completion of CAMC at escalation rate of 05% for Indian rupee and 02% for foreign Currency per annum.Milestone and supply date will be finalised before 6 month of expiry of CAMC period. 6.6 REACH 4A SECTION - COST CENTRE No. F (MISCELLANEOUS): Spares, Special Tools, Testing Equipment and Measuring Instrument Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for delivery of the following in accordance with the Work’s Requirements: F1 Delivery of spares F2 Delivery of special tools, Testing Equipment and Measuring Instrument F3 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 6.7 REACH 4A SECTION - COST CENTRE No. G (MISCELLANEOUS): Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems This Cost Centre comprises supervision of maintenance of AFC systems:• Preventive Maintenance Service during DLP (24 Months) for the commissioned and tested Systems.Note: Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. 6.7 REACH 4A SECTION - COST CENTRE No. G (MISCELLANEOUS): Service during DLP (24 Months) for the commissioned and tested Systems Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Employer’s personnel for completion of the following in accordance with the Work’s Requirements: G1 Service during DLP 1st Year for the commissioned and tested Systems G2 Service during DLP 2nd Year for the commissioned and tested Systems COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 7. All Reaches COST CENTRE No. H (MISCELLANEOUS): SHE, IT and Any other Requirements (All Reaches) 7.1 COST CENTRE No. H: SHE, IT and Any other Requirements This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to:• Compliance to all SHE requirements as per work requirement• Compliance to IT requirements as per work requirement• Any other item considered necessary to comply with the Scope of Work. Bidder may add detailed scheduled/items which considered in this Cost centre. 7.1 COST CENTRE No. H: SHE, IT and Any other Requirements Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for completion of the following in accordance with the Work’s Requirements: H1 Deployment of SHE personnel and Key personnel as per Appendix-G of works requirement. Particular Specifications H2 IT requirements of MAHA-METRO (online project management platform, documentation management system, enterprise work program platform, 5D BIM modelling etc.) – Refer Annexure IX D (Part-3 of Contract). H3 Office accommodation & Site Facility for Employer’s Representative as per Appendix-5 of works requirement. General Specification H4 Any other item considered necessary to comply with the Scope of Work. Bidder may add detailed scheduled/items which considered in this Cost centre. COST CENTRE TOTAL = 0.0 0.0 0.0 Note : *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer. 8. COST CENTRE No. I: Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) Milestone No. Work Description Total Apportioned Amounts of Cost Centre Items Weeks for completion of Milestone from Commencement Date (In USD) (In EURO) (In INR) Milestone Activity [Col A] [Col B] [Col C] Payment on :Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ____”*(1) from the Engineer for completion of the following in accordance with the Work’s Requirements: I1 Comprehensive Annual Maintenance Contract (CAMC) OCC, BCC & SDC ( 1st Year ) I2 Comprehensive Annual Maintenance Contract (CAMC) R1A1 Section ( 1st Year ) I3 Comprehensive Annual Maintenance Contract (CAMC) R1A2 Section ( 1st Year ) I4 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 1st Year ) I5 Comprehensive Annual Maintenance Contract (CAMC) R2A2 Section ( 1st Year ) I6 Comprehensive Annual Maintenance Contract (CAMC) R3A Section ( 1st Year ) I7 Comprehensive Annual Maintenance Contract (CAMC) R4A Section ( 1st Year ) Sub-Total For 1st Year 0.0 0.0 0.0 I8 Comprehensive Annual Maintenance Contract (CAMC) OCC, BCC & SDC ( 2nd Year ) I9 Comprehensive Annual Maintenance Contract (CAMC) R1A1 Section ( 2nd Year ) I10 Comprehensive Annual Maintenance Contract (CAMC) R1A2 Section ( 2nd Year ) I11 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 2nd Year ) I12 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 2nd Year ) I13 Comprehensive Annual Maintenance Contract (CAMC) R3A Section ( 2nd Year ) I14 Comprehensive Annual Maintenance Contract (CAMC) R4A Section ( 2nd Year ) Sub-Total For 2nd Year 0.0 0.0 0.0 I15 Comprehensive Annual Maintenance Contract (CAMC) OCC, BCC & SDC ( 3rd Year ) I16 Comprehensive Annual Maintenance Contract (CAMC) R1A1 Section ( 3rd Year ) I17 Comprehensive Annual Maintenance Contract (CAMC) R1A2 Section ( 3rd Year ) I18 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 3rd Year ) I19 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 3rd Year ) I20 Comprehensive Annual Maintenance Contract (CAMC) R3A Section ( 3rdYear ) I21 Comprehensive Annual Maintenance Contract (CAMC) R4A Section ( 3rd Year ) Sub-Total For 3rd Year 0.0 0.0 0.0 I22 Comprehensive Annual Maintenance Contract (CAMC) OCC, BCC & SDC ( 4th Year ) I23 Comprehensive Annual Maintenance Contract (CAMC) R1A1 Section ( 4th Year ) I24 Comprehensive Annual Maintenance Contract (CAMC) R1A2 Section ( 4th Year ) I25 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 4th Year ) I26 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 4th Year ) I27 Comprehensive Annual Maintenance Contract (CAMC) R3A Section ( 4th Year ) I28 Comprehensive Annual Maintenance Contract (CAMC) R4A Section ( 4th Year ) Sub-Total For 4th Year 0.0 0.0 0.0 I22 Comprehensive Annual Maintenance Contract (CAMC) OCC, BCC & SDC ( 5th Year ) I23 Comprehensive Annual Maintenance Contract (CAMC) R1A1 Section ( 5th Year ) I24 Comprehensive Annual Maintenance Contract (CAMC) R1A2 Section ( 5th Year ) I25 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 5th Year ) I26 Comprehensive Annual Maintenance Contract (CAMC) R2A1 Section ( 5th Year ) I27 Comprehensive Annual Maintenance Contract (CAMC) R3A Section ( 5th Year ) I28 Comprehensive Annual Maintenance Contract (CAMC) R4A Section ( 5th Year ) Sub-Total For 5th Year 0.0 0.0 0.0 COST CENTRE TOTAL = 0.0 0.0 0.0 Note : 1. *1. Notice of No Objection Subject to ____” will qualify for partial payment to be decided by Engineer.2. Payment for this Cost Centre will be made on Quarterly basis. However, in case of taking over of part of the work payment will be made on prorata basis. MAHARASHTRA METRO RAIL CORPORATION LIMITEDDESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II” (THIS DOCUMENT IS TO BE PREAPARED AND COMPLETED BY THE TENDERER) Annexure-2 MILESTONE PAYMENT SCHEDULE SHOWING MONTHLY CASH FLOWS FOR THE CONTRACT This document to be prepared and completed as required by the Bidder and submitted as part of Schedules’ under Section IV: Bidding Forms. 1- The monthly cash flows shall be worked out as per the methodology indicated in relevant format under Section IV: Bidding Forms. 2- The amount of Cost Centre “E” of Section MS and Cost Centre “G” of Section MS will not be included in the Monthly Cash Flows 3- It is certified that “Annexure-4” annexed in Technical Package is a “TRUE COPY” (with prices blanked off) of said “Annexure-4” in the Financial Package- DELETED SIGNATURE OF BIDDER MAHARASHTRA METRO RAIL CORPORATION LIMITEDDESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II” (THIS DOCUMENT IS TO BE PREAPARED AND COMPLETED BY THE TENDERER) Annexure-3 LIST OF SPARES 1- We hereby confirm that we shall submit a schedule of spare parts duly indicating, for each item of spares, its description and number of units required for the system during the expected life and during the first ten years, principal source of supply, part number, drawing number, lead time, shelf life and the secondary source of supply within 96 weeks of Commencement date and the submission of these details shall be considered as a pre-requisite for accomplishment of Key Date as described in the relevant clause of the Employer’s Requirement-General Specifications 2- It is certified that ‘Annexure-4’ annexed in Technical Package is a “TRUE COPY” (with prices blanked off) of said Annexure-4 in the financial package - DELETED. SIGNATURE OF BIDDER MAHARASHTRA METRO RAIL CORPORATION LIMITED\\"DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II” (THIS DOCUMENT IS TO BE PREAPARED AND COMPLETED BY THE TENDERER) Annexure-4 DELETED SIGNATURE OF BIDDER
3Application Engineering, Design, Layout and Documentations
4Interface Application Engineering and design with designated DDC, contractors of Civil, E&M, Telecommunication, Signalling etc.
5Detailed interface design document for integration with NMRP Phase-I AFC System
6Detailed design for interface with Bank/ Financial Institute
7Detailed design for interface with CCHS
8Any other Item to comply the TS requirement Schedule Total for Schedule A = Manufacture & Delivery
9Entry Gate with all associated accessories as per PS
10Reversible Gate with all associated accessories as per PS
11Exit Gate with all associated accessories as per PS
12Wide Gate with all associated accessories as per PS
13Swing Gate with all associated accessories as per PS
14TOM with all associated accessories as per PS
15EFO with all associated accessories as per PS
16Digital Kiosk (complete module) with all associated accessories as per PS
17TVM (complete module) with all associated accessories as per PS
18HHD with all associated accessories as per PS
19Station Computer System (SCS) with all associated accessories as per PS
20Cashless Card Dispenser
21Ticket Reader (complete module) with all associated accessories as per PS
22Central AFC Back office System/ CCS including QRTE with all associated accessories at OCC as per PS
23Central AFC Back office System/ CCS with all associated accessories at BCC & SDC as per PS
24Work Stations for AFC System at OCC, BCC & SDC with all associated accessories as per PS
25Delivery of L2 & L3 Certification
26Delivery of PCI-DSS Certification
27Delivery of required hardware and software for integration with Phase-I AFC System (if any).
28Delivery of requisites for integration with CCHS (if any).
29Delivery of Source Code
30Delivery of API & DLL Network Equipment
31Switches with all associated accessories as per PS
32KVM Switch
33Firewall with all associated accessories as per PS
34Installation Accessories
35All types of Power Cable as per PS
36All types of Data Cable as per PS
37Electrical Cabinets including MCBs/Terminal blocks
38Power distribution boards, Patch panels, connectors, patch chords, racks etc.
39Emergency Switch
40Fixed Barrier with all associated accessories as per PS
41Any other item required to complete the scope of work (to be listed by Tenderer) Total Cost of Schedule B = Installation, Site Testing
42OCC & BCC
43Stations Total Cost of Schedule C = System Acceptance Test, Integrated Testing and Commissioning
44OCC & BOCC
45Stations
46As build Drawings Total Cost of Schedule D = Training
47Offshore training
48Onshore Training Total Cost of Schedule E = Spares, Special Tools, Testing Equipment and Measuring Instrument
49Spares
50Special Tools, Testing Equipment and Measuring Instrument Total Cost of Schedule F = Service during DLP (24 Months) for the commissioned and tested Systems
51Service during Defect Liability Period - DLP (24 Months) Total Cost of Schedule G = MS - MISCELLANEOUS (ALL REACH)
52SHE, IT and Any other Requirements Total Cost of Schedule H = Comprehensive Annual Maintenance Contract (CAMC) Service
53Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) Total Cost of Schedule I = Total Cost (A+B+C+D+E+F+G+H+I) = Minimum BOQ for Spares, Special Tools, Testing Equipment and Measuring Instrument Item Description
54Entry Gate With Complete Module
55Reversible Gate With Complete Module
56Exit Gate With Complete Module
57Wide Gate With Complete Module
58Swing Gate With Complete Module
59TOM With Complete Module
60EFO With Complete Module
61Digital Kiosk (complete module)
62TVM (complete module)
63HHD With Complete Module
64Cashless Card Dispenser (complete module)
65Station Computer System (SCS) (complete module)
66Ticket Reader (complete module)
67Central AFC Back office System/ CCS
68Work Stations for AFC System at OCC, BCC & SDC Network Equipment
69Each type of Network Switch
70KVM Switch
71Firewall Installation Accessories
72Power Cable
73Data Cable
74Electrical Cabinets including MCBs/Terminal blocks
75Power distribution boards, Patch panels, connectors, patch chords, racks etc.
76Emergency Switch
77Any other item required to complete the scope of work (to be listed by Tenderer) Sub Total = Total Cost for Schedule 2-A = Item Description
78Cable Fault Locator (Megger or Equivalent)
79Basic Digital Multimeter (Fluke or Equivalent)
80Earth ground tester (Fluke or Equivalent)
81LAN Tester (D-Link or Equivalent)
82Multimeter Digital (hand-held) (Fluke or Equivalent)
83Power Supply (Regulated (±) 0-30 VDC, 10 A
84Soldering iron with necessary consumables (Stanley or Equivalent)
85Soldering Work Station (Temperature Regulated ) (Stanley or Equivalent)
86T Spanner 8MM, 3.5 inch length (Stanley or Equivalent)
87Power screw driver (Stanley or Equivalent)
88Blower (Stanley or Equivalent)
89Screw Driver set (Stanley or Equivalent)
90Wire Stripper & Cutter (Stanley or Equivalent)
91Combination plier (Stanley or Equivalent)
92Long screw driver (Two side changeable) (Stanley or Equivalent)
93Tool bag (Stanley or Equivalent)
94RJ45 Crimping Tool (D-Link or Equivalent)
95IO/Patch Panel Punch Down Tool (D-Link or Equivalent)
96Sealant gun
97Torque Wrench with 8mm allen key (Stanley or Equivalent) Sub Total = Total Cost for Schedule 2-B = Minimum BOQ for SHE, IT and Any other Requirements Item Description
98Deployment of SHE personnel and Key personnel as per Appendix-G of works requirement. Particular Specifications
99IT requirements of MAHA-METRO (online project management platform, documentation management system, enterprise work program platform, 5D BIM modelling etc.) – Refer Annexure IX D (Part-3 of Contract).
100Office accommodation & Site Facility for Employer’s Representative as per Appendix-5 of works requirement. General Specification Sub Total for SHE, IT and Any other Requirements- H= MAHARASHTRA METRO RAIL CORPORATION LIMITED\\"DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPEN LOOP EMV NCMC CARD AND QR BASED AUTOMATIC FARE COLLECTION (AFC) SYSTEM ALONG WITH CAMC FOR NAGPUR METRO RAIL PROJECT PHASE-II” (THIS DOCUMENT IS TO BE PREAPARED AND COMPLETED BY THE TENDERER) (Bill of Quantities to be proposed by Bidder along with the cost therein) APPENDIX 2- SUMMARY OF MINIMUM BILL OF QUANTITIES Sr. No. Description of System Total Apportioned Amounts of Cost Centre Items (In USD)[Col A] (In EURO)[Col B] (In INR)[Col C] A Plans & Design Document 0.0 0.0 0.0 B Manufacture & Delivery 0.0 0.0 0.0 C Installation, Site Testing 0.0 0.0 0.0 D System Acceptance Test, Integrated Testing and Commissioning 0.0 0.0 0.0 E Training 0.0 0.0 0.0 F Spares, Special Tools, Testing Equipment and Measuring Instrument 0.0 0.0 0.0 G Service during DLP (24 Months) for the commissioned and tested Systems 0.0 0.0 0.0 H MS - Miscellaneous (All Reach) 0.0 0.0 0.0 I Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) 0.0 0.0 0.0 BID TOTAL = 0.0 0.0 0.0 Note-1-Total price quoted in the BOQs should be unit price multiplied by the total indicative quantity.2-The BOQ indicated is the indicative BOQ and any additional items or enhancement of any quantity to complete the scope of work shall be borne by the AFC Contractor. Appendix to Bid Total DETAILS OF TAXES / DUTIES / LEVIES ETC. INCLUDED IN THE FIXED LUMPSUM PRICE (COST CENTRE WISE) (Refer Para A of Part -4 Section XII A ‘Instructions for completing the Pricing Document’) Section / Cost Centre Taxes, Duties, Levies etc. Total Amount of all Taxes / Duties / Levies / Cess # Custom Duty CGST SGST IGST Royalty BOCW Cess Any other Tax / Levy / Cess 1.0 2.0 3.0 4.0 5.0 6.0 7.0 (8) = Sum of (1) to (7) Rate (%) Amt Rate (%) Amt Rate (%) Amt Rate (%) Amt Rate (%) Amt Rate (%) Amt Rate (%) Amt Amt SECTION : FOR ALL REACH A 0.0 B 0.0 C 0.0 D 0.0 Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 SECTION MS – Miscellaneous E 0.0 F 0.0 G 0.0 H 0.0 Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 SECTION - Comprehensive Annual Maintenance Contract (CAMC) Service (60 Months) I 0.0 Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Notes: The Bidder is required to give in its Bid offer breakdown of fixed lump sum price clearly giving the following: (a) Customs duty on offshore manufactured items, if any along with rate of Customs duty. (b) Customs duty on imported material supply and spares, jigs, fixtures, special tools and diagnostic equipment etc. forming part of Cost Centre-F of SECTION MS - MISCELLANEOUS (Annexure-1) along with rate of Customs duty. (c) GST and any other taxes on completely assembled / manufactured components, if any along with rate of GST. (d) GST on material supply and spares, jigs, fixtures, special tools, testing and diagnostic equipments etc. forming part of Cost Centre-F of SECTION MS - MISCELLANEOUS (Annexure-1) along with rate of GST. (e) GST on maintenance contract items along with applicable rates. (f) Other levies / Cess/ Royalty etc. as applicable along with rate. (g) The amount mentioned other than INR for the purpose of comparison of the applicable taxes and levies, the exchange rate prevailing on the date 28 days before the latest date of submission of this Tender would be considered. (h) In case of multiple tax rates, same is to be informed separately along with the amount of tax for each tax rate. Please Enable Macros to View BoQ information

Other Detail

Information Source https://mahatenders.gov.in
Download FileName File Description File Size
Download BOQ_2224552.xls Tender Documents 0 KB
Download f4c163e6-2bee-4f1a-a874-930420b2059b.html Tender Documents 0 KB
Download Tendernotice_1 (14).pdf Tender Documents 0 KB
Download Tender_Document.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.