| 1 | Providing & Fixing of Phase Protector including cost of making connection, testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 2 | Providing and fixing of DP Switch of chiller including, testing, commisssioning to entire satisfaction of EIC .NSR |
| 3 | Providing & Fixing of Human Interface Machine (HMI) including cost of making connection, testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 4 | Providing & Fixing of Thermal Relay including cost of making connection, testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 5 | Providing & Fixing of 24V DC Relay including cost of making connection, testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 6 | Providing & Fixing of Discharge Temperature Sensor including testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 7 | Providing & Fixing of Oil Pressure Sensor including testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 8 | Providing & Fixing of EM 222 Module including cost of making connection, testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 9 | Providing & Fixing of EM 231 Module including cost of making connection, testing and commissioning at site to the entire satisfaction of EIC. .NSR |
| 10 | Providing and Fixing of Temperature Sensor complete in all respect .NSR |
| 11 | De-scailing of Screw Chillers including cost of coil clean chemical, mechanical cleaning of tubes with opening of end covers. The work includes the cost of nuts & bolts, Gaskets including cleaning of floor area to entire satisfaction of EIC. .NSR |
| 12 | RMS (Routine Maintenance Service) including installation of spare parts, Re-Thimbling of input power supply cables, Maintenance of chiller, calibration of sensors and transducers, motor and compressor inspection etc. .NSR |
| 13 | Scope of work:(i) Tightness check of all electrical and control connections.(ii) Claibration of all sensors and transducers(iii) Thermal imaging of electrical cables for any overheating using infrared thermometre.(iv) Cleaing of all valves for any rust or moisture.(v) Soap solution leakage test in chiller.(vi) Motor terminals cleaning with CRC(vii) Compressor motor testing(viii) Observation of running parameters of chiller.(ix) Visual inspection of oil and gas from sight glasses.(x) Testing of chiller safety devices. . |
| 14 | Visit Charges: Daikin Engineer Site Visit, Inspection, and Report Submission Charges, including submission of the report after installation of spare parts (for 03 Nos. Chillers). .NSR |
| 15 | Supplying, fixing, testing and commissioning of Butterfly Valve of PN 1.6 rating with bronze/gunmetal seat duly ISI marked complete with nuts, bolts, washers, gaskets conforming to IS 13095 of following sizes as required as per approved make list .27.11 |
| 16 | 150 mm dia .27.11.6 |
| 17 | This is a specialized job; therefore, only the OEM or an enlisted air-conditioning contractor with proven experience in chiller repair with authorized by the OEM’s Applied Service Department shall be eligible to participate in the work . Authorization Letter will be verified from OEM. The work must be carried out strictly by an authorized Daikin Service Engineer using only genuine Daikin parts and equipment. A copy of the original Daikin invoice of parts shall be submitted to the department for verification and payment. Please Enable Macros to View BoQ information |