| 1 | Scope of Work/Technical Specifications etc.1. Cutting, denting, fitting & welding of back and side wall. 2. Cutting, denting, fitting & welding of gantry ladder. 3. Cutting, denting, fitting & welding of platform. 4. Cutting, denting, fitting & welding of front wall. 5. Cutting, denting, fitting & welding of dynavane 6. Repairing/rewinding of counter box. 7. Repairing/fabrication of inner portion of operator cabin. 8. Removing of old scrap material of cabin. 9. Cleaning of wall and roof. 10. Fitting of insulation of roofs and walls. 11. Fitting of rexin and floor mat. 12. Replacement of door lock, hinge etc. 13. Cleaning and painting of machine. 14. Measurement of the inner portion of operator cabin: (i) RHS Wall- 6'x8'= 48 sqft (ii) LHS wall- 4'x8' = 32 sqft ( iii) 6'x9'= 54 sqft (iv) Roof area = 6'x9'= 54 sqft (v) Floor mat= 6'x9'= 54 sqft Maximum deployment of manpower for the above scope of work will be 1. Skilled Fitter for 87 nos. of manshifts, 2. Skilled welder for 10 nos. of manshifts, 3. Semi-Skilled for 24 nos. of manshift, Un-Skilled for 75 nos. of manshifts. |
| 2 | Labour charges for cleaning of working area including contractor’s profit. |
| 3 | Labour charges for Repairing/rewinding of counterbox including contractor’s profit. |
| 4 | Labour charges for Repairing/fabrication of inner portion of operator cabin including contractor’s profit. |
| 5 | Charges for cutting, denting, fitting & welding of back and side wall, Gantry Ladder, Platform, Front wall and Dynavane |
| 6 | Material Charges for above scope of work |
| 7 | HT Nut and Bolts with washer (5/8\\" x 1\\") |
| 8 | Doorbeat 1\\" (25 rft) |
| 9 | Door handle with door lock |
| 10 | Screw Nut Bolt 2.5\\" |
| 11 | Fitting of heat insulation of roofs and side, rear and door 1/2\\"walls |
| 12 | Hinge 5\\" |
| 13 | Latch 10'' |
| 14 | Ceiling rear, side wall and door board-(1/2\\"thick) |
| 15 | Fitting of floor mat (1/2'' thick) |
| 16 | Solution |
| 17 | Wooden beat-1'' |
| 18 | Ply fitting under roof side wall, rear wall and door-6mm |
| 19 | Rexine |
| 20 | Charges for Painting of machine-Red oxide coating 1 layer and 2 layer of colour paint matching to the machine as original colour |
| 21 | Charges for Name and number writing with paint |
| 22 | Charges for Tools and Tackles |
| 23 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |