Indian Tenders

Tender Notice

TDR 55016856
Tendering Authority Public Works Department
Tender No 3139/SETender/jnp-gzp circle/25 Date-31-03-2026
Tender ID 2026_CEUVZ_1134839_1
Tender Brief Corrigendum : Tender For Construction And Maintenance Of Road Jaunpur Mirzapur Highway (Nh-135A) Ke Km-41 Se Nikalkar Musaipur, Mai, Bahedua Hote Hue Sakra Pal Basti Tak Link Road In Distt. Jaunpur
City Jaunpur
State Uttar Pradesh
Document Fees INR 2714 /-
EMD INR 721000.0 /-
Tender Value INR 1.04 Crore /-
Tender Type Works
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender For Construction And Maintenance Of Road Jaunpur Mirzapur Highway (Nh-135A) Ke Km-41 Se Nikalkar Musaipur, Mai, Bahedua Hote Hue Sakra Pal Basti Tak Link Road In Distt. Jaunpur

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 05-05-2026 DateCorrigendum3 Date 11-05-2026
2 02-05-2026 DateCorrigendum2 Date 05-05-2026
3 02-05-2026 DateCorrigendum2 Date 05-05-2026
4 24-04-2026 Date 1 Date 02-05-2026
5 24-04-2026 Date 1 Date 02-05-2026
6 24-04-2026 Date 1 Date 02-05-2026
7 15-04-2026 DateCorrigendum Date 25-04-2026
8 15-04-2026 DateCorrigendum Date 25-04-2026
9 15-04-2026 DateCorrigendum Date 25-04-2026
10 15-04-2026 DateCorrigendum Date 25-04-2026

Key Dates

Publish Date 05-05-2026
Last Date of Bid Submission 11-05-2026
Tender Opening Date 11-05-2026

Contact Information

Company Name Public Works Department
Contact Person SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
Address SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur

BOQ Items

Name of Work:- Construction & Maintanance of Jaunpur Mirzapur Highway (NH-135A) ke Km-41 se Nikalkar Musaipur, Mai, Bahedua Hote hue Sakra Pal Basti tak Link Road in Distt. Jaunpur(As per BOQ)
Sl. No. Item Description
1Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST
2Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. Including All material T&P, Labour cess etc But Excluding cost of GST
3W.B.M (Grade-2) Providing, laying, spreading and compacting stone aggregates of specific sizes 63mm to 45 mm to water bound macadam (G-2) specification including spreading in uniform loose thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone dust to fill-up the interstices of coarse aggregate, watering and compacting 7.50/9.00 cm thickness to the required density Grading 2 as per Technical Specification Clause 405. Including All material T&P, Labour cess etc But Excluding cost of GST
4W.B.M (Grade-3) Providing, laying, spreading and compacting stone aggregates of specific sizes 53mm to 22.4mm to water bound macadam (G-3) specification including spreading in uniform loose thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone dust to fill-up the interstices of coarse aggregate, watering and compacting 7.50 cm thickness to the required density Grading 3 as per Technical Specification Clause 405.Including All material T&P, Labour cess etc But Excluding cost of GST
5Providing and applying Primer coat with bitumen emulson using bitumen emulsion distributor at the rate of 0.70 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 502. Including All material T&P, Labour cess etc But Excluding cost of GST and Bitumen
6Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Including All material T&P, Labour cess etc But Excluding cost of GST and Bitumen
7Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion
8Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion
9Brick edging 7.00 cm. wide on both sides of the road by M-150 bricks complete as per PWD detailed specification No. 20.15 as per Technical Specification clause Including All material T&P, Labour cess etc But Excluding cost of GST
10Construction of subgrade & earthen shoulder with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST
11PART AMaintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
121st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
132nd year- maintainance cost 0.75% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
143rd year- maintainance cost 1.50 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
154th year- maintainance cost 2.25% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
165th year- maintainance cost 3.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download Tendernotice_1 (14).pdf Tender Documents 0 KB
Download T2.pdf Tender Documents 0 KB
Download 795af1a3-58dd-4856-87f9-aaf7b6c9f83a.html Tender Documents 0 KB
Download BOQ_2118613.xls Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.