Name of Work:- Dredging & Reclamation work for establishment of an Industrial Estate at Paradip, Odisha, India - reg. | Sl. No. | Item Description | |
| 1 | Laying and Jointing PVC Pipe. Heading | | 2 | Construction of the Peripheral Bund for the entire reclamation area of 685 Acres including the Top and Side Slope Protection Works as per the specifications, design and requirements as per Drawings/ Charts and documents mentioned under Section IX & X for execution of the Dredging and Reclamation Works and as defined elsewhere in these Tender Documents etc. all complete as per the directions of DCI. | | 3 | Completion of laying of all the pipelines as per the required specifications- both pumping and return water/ backwash | | 4 | Completion of installation of all Booster pumps as per the required specifications | | 5 | Arrival of TSHD(s) at site along with requisite crew members and commencement of dredging | | 6 | Arrival of CSD(s) at site along with requisite crew members and commencement of dredging | | 7 | Demobilisation of the dredgers, dredger spreads, earth moving equipment from the work site and from dredging & reclamation location including transportation of equipment and making the area clear of any construction materials, pipelines, temporary structures etc. | | 8 | Carrying out Reclamation works at the 685 acres of acquired land (only after completion of the entire Peripheral Bund) by Surveys including Construction of Permanent Benchmarks, dredging of the material at the designated/identified Borrow Areas including making access channels (if any) to the Borrow Areas, dredging of material at the Borrow Areas, pumping the same through pipeline to the Reclamation Area, clearing and stripping at reclamation site prior to the pumping of material, making of internal bunds at reclamation sites as required, filling and levelling with dredge material, compacting, testing, rectification works (if any), etc., complete so as to attain the required compaction parameters and the levels as per the approved drawings and as per the details laid down in the technical specifications, and under Drawings/ Charts and documents mentioned under IX & X, carrying backwash water back to the final disposal point at Sea by pumping, including construction of all necessary approaches, intermediate booster pumping stations, site offices, laboratories, equipment for backwash water pumping etc., taking all steps to protect the environment conditions, supply of manpower, materials, fuels and consumables etc., all complete as per the attached scope of work, specifications, Tender Documents, instructions of DCI, meeting the requirements of Environmental Clearance, Forest Clearance, CRZ Clearance, Detailed Project Report, Statutory Approvals etc. to complete the Dredging and Reclamation Works in all respects Please Enable Macros to View BoQ information |
|