Indian Tenders

Tender Notice

TDR 54818696
Tendering Authority Command Area Development Authority
Tender No 202581AF8B7A B949 4FEF 955A C8F3F40A0214442CAD
Tender ID 2026_HBC_510366_1
Tender Brief Corrigendum : Tender For Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (24 X 24) , Sup
City Hisar
State Haryana
Document Fees INR 1000 /-
EMD INR 6060.0 /-
Tender Value INR 3.03 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (24 X 24) , Supply, Carriage And Fixing Of Reinforced Cement Concrete Lids Dia 18 , Civil Work , Hsr Item 4.12.1-Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Up To 50 M And Lift Up To 1.5 M, As Directed By Engineerin-Charge. 1. All Kinds Of Soil Hsr Rate(Rs.) 78.00 Through Rate , Hsr Item 4.33-Excavating, Supplying And Filling Of Local Earth (Including Royalty) By Mechanical Transport Up To A Lead Of 1 Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches, Plinth, Sides Of Foundation Etc. Complete. Hsr Rate(Rs.) 138.00 Through Rate , [14.1]Dressing Bed And Preparation Of Sub Grade For Lining By Mechanical/ Mannual Means Hsr Rate (Rs.) 4.00 Labour Rate , Hsr Item 6.1.6-Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (Zone-Iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) Hsr Rate(Rs.) 2442.00 Through Rate , Hsr Item 7.21.1-Brick Work With Common Burnt Clay Nonmodular Bricks Of Class Designation 10.5 In Foundation And Plinth In: 1. Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Hsr Rate(Rs.) 4128.00 Through Rate , [11.8.1]12 Mm Cement Plaster Of Mix : 1. 1:4 (1 Cement: 4 Coarse Sand) Hsr Rate (Rs.) 114.00 Through Rate , [7.65]Extra For Specially Moulded Brick Work In Circular Work Such As Wells, Shafts, Circular Sumps, Pumps Chambers, Etc. In Which Specially Moulded Or Cut-Bricks Have To Be Used: But For Which No Centring Or Supports Are Required Up To 4.5 Metres Internal Diameter. Hsr Rate (Rs.) 131.00 Through Rate

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 27-04-2026 Corrigendum8 Date 01-05-2026
2 24-04-2026 Corrigendum 7 Date 27-04-2026
3 24-04-2026 Corrigendum 7 Date 27-04-2026
4 22-04-2026 Corrigendum 6 Date 24-04-2026
5 22-04-2026 Corrigendum 6 Date 24-04-2026
6 22-04-2026 Corrigendum 6 Date 24-04-2026
7 20-04-2026 Corrigendum 5 Date 22-04-2026
8 20-04-2026 Corrigendum 5 Date 22-04-2026
9 20-04-2026 Corrigendum 5 Date 22-04-2026
10 20-04-2026 Corrigendum 5 Date 22-04-2026
11 15-04-2026 Corrigendum 4 Date 20-04-2026
12 15-04-2026 Corrigendum 4 Date 20-04-2026
13 15-04-2026 Corrigendum 4 Date 20-04-2026
14 15-04-2026 Corrigendum 4 Date 20-04-2026
15 15-04-2026 Corrigendum 4 Date 20-04-2026
16 13-04-2026 Corrigendum 3 Date 15-04-2026
17 13-04-2026 Corrigendum 3 Date 15-04-2026
18 13-04-2026 Corrigendum 3 Date 15-04-2026
19 13-04-2026 Corrigendum 3 Date 15-04-2026
20 13-04-2026 Corrigendum 3 Date 15-04-2026
21 13-04-2026 Corrigendum 3 Date 15-04-2026
22 08-04-2026 Corrigendum 2 Date 13-04-2026
23 08-04-2026 Corrigendum 2 Date 13-04-2026
24 08-04-2026 Corrigendum 2 Date 13-04-2026
25 08-04-2026 Corrigendum 2 Date 13-04-2026
26 08-04-2026 Corrigendum 2 Date 13-04-2026
27 08-04-2026 Corrigendum 2 Date 13-04-2026
28 08-04-2026 Corrigendum 2 Date 13-04-2026
29 06-04-2026 Corrigendum 1 Date 08-04-2026
30 06-04-2026 Corrigendum 1 Date 08-04-2026
31 06-04-2026 Corrigendum 1 Date 08-04-2026
32 06-04-2026 Corrigendum 1 Date 08-04-2026
33 06-04-2026 Corrigendum 1 Date 08-04-2026
34 06-04-2026 Corrigendum 1 Date 08-04-2026
35 06-04-2026 Corrigendum 1 Date 08-04-2026
36 06-04-2026 Corrigendum 1 Date 08-04-2026
37 03-04-2026 Corrigendum Date 06-04-2026
38 03-04-2026 Corrigendum Date 06-04-2026
39 03-04-2026 Corrigendum Date 06-04-2026
40 03-04-2026 Corrigendum Date 06-04-2026
41 03-04-2026 Corrigendum Date 06-04-2026
42 03-04-2026 Corrigendum Date 06-04-2026
43 03-04-2026 Corrigendum Date 06-04-2026
44 03-04-2026 Corrigendum Date 06-04-2026
45 03-04-2026 Corrigendum Date 06-04-2026

Key Dates

Publish Date 27-04-2026
Last Date of Bid Submission 01-05-2026
Tender Opening Date 01-05-2026

Contact Information

Company Name Command Area Development Authority
Contact Person DHARAM PAL
Address MICAD Division Hisar

BOQ Items

Name of Work:-
Sl. No. Item Description
1Supply carriage and laying of 100 micron polythene under bed lining watercourse
2Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (24` x 24`)
3Supply, carriage and fixing of R.C.C lids Dia 18`
4Civil Work
5HSR Item 4.12.1-Earth work in excavation by mechanicalmeans (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqmon plan) including getting out and disposal of excavated earthlead up to 50 m and lift up to 1.5 m, as directed by Engineerin-charge. 1. All kinds of soilHSR Rate(Rs.) 78.00 Through Rate
6HSR Item 4.33-Excavating, supplying and filling of local earth(including royalty) by mechanical transport up to a lead of 1km also including ramming and watering of the earth in layersnot exceeding 20 cm in trenches, plinth, sides of foundationetc. complete.HSR Rate(Rs.) 138.00 Through Rate
7[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means HSR Rate (Rs.) 4.00 Labour Rate
8HSR Item 6.1.6-Providing and laying in position cementconcrete of specified grade excluding the cost of centeringand shuttering - All work below plinth level and up to Floor IVlevel: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 gradedstone aggregate 40 mm nominal size)HSR Rate(Rs.) 2442.00 Through Rate
9HSR Item 7.21.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation andplinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4128.00 Through Rate
10[11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) HSR Rate (Rs.) 114.00 Through Rate
11[7.65]Extra for specially moulded brick work in circular work such as wells, shafts, circular sumps, pumps chambers, etc. in which specially moulded or cut-bricks have to be used: but for which no centring or supports are required up to 4.5 metres internal diameter. HSR Rate (Rs.) 131.00 Through Rate Please Enable Macros to View BoQ information

Other Detail

Information Source https://etenders.hry.nic.in
Download FileName File Description File Size
Download BOQ_589172.xls Tender Documents 0 KB
Download d6820a36-f8a4-4969-a4df-f188f87b325f.html Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.