Name of Work:- Supply and fixing of mechanical store roof tin shade with chemical coating work in central store at at chilla central store | Sl. No. | Item Description | |
| 1 | Work: | | 2 | Making Arrangement for dismantling work of overhead roof by using hydra, Rope, Jhulla, Stairs, Lifting Device, Tools , Platform etc ..(as per technical specification) including all cost of material , tools , man power , loading , unloading , transportation etc. | | 3 | Dismantling of Old, Damage, Rusted, leaked Overhead roof sheets by using Cutting set , hydra ,Grinder , loosing screw , bolt etc . .(as per technical specification) including all cost of material , tools , man power , loading , unloading , transportation etc | | 4 | Repairing of damage Supporting Structure by welding , bolting etc. Provide and fabrication of missing structure by using angle , pipe etc including all cost of Manpower ,Tools, cutting set, gas cutting etc (as per technical specification) | | 5 | Providing and Installation of roof purlin mild steel 1.5 square mm pipe by cutting, welding, bolting etc. (as per technical specification)(make : tata /Apollo / mandi / Jindal etc.) including all cost of material , tools , man power , loading , unloading , transportation etc. | | 6 | Providing and fixing of new Colour Coated Sheet to covering Overhead roof size of sheet 3.5 feet (width) x5 feet (length)x 0.45mm (thickness), along with new bolt/nut/screw total area of roof 35x65.sheet colour: Blue , Green, silver (as per technical specification) make : JSW/Tata/Century . including all cost of material , tools , man power , loading , unloading , transportation etc | | 7 | Applying One Coat Protective Chemical Coating of DTM 200 to all roof mild steel Structure total area 463 sq/mtr ,(as per technical specification) including all cost of material , tools , man power , loading , unloading , transportation etc. | | 8 | Testing of all welded joints by using D.P test kit.(as per technical specification) including all cost of material , tools , man power , loading , unloading , transportation etc. | | 9 | Lifting, loading, unloading all scrap from site to other place of store. Including all cost of man power, hydra, loading – unloading, Transport etc.(as per technical specification) Please Enable Macros to View BoQ information |
|