| 1 | Earthwork in excavation in hard soil within initial lead and lift inclusive levelling the edge and bed inclusive all cost complete. |
| 2 | Filling foundation and plinth with filling sand well watered and rammed including all costs etc complete. |
| 3 | Providing Cement Concrete(1:4:8) using 40mm.C.B size metal including all cost,carrige,compaction and curing etc complete |
| 4 | Fly Ash brick masonry in C.M.(1:6) in F & P including s.plays, cutting, circular molding with cost, conveyance and taxes, royalty, labour, T&P etc. complete. Foundation and Plinth |
| 5 | Superstructure |
| 6 | RCC work of M20 grade with 20mm and downgraded black granite (Crusher broken) stone chips including watering curing and cost of all labour T&P etc complete. |
| 7 | Rigid smooth centering shuttering for C.C.work including all cost and as per specification etc complete Column Base & Ffting |
| 8 | Column & beam |
| 9 | Lintel |
| 10 | Slab Edge |
| 11 | Cutting,bending,binding of HYSD (Fe-415) Steel including all cost,cost of carriage etc. complete as per approved specification. |
| 12 | 16 mm thick Cement plaster with C.M. (1:6) over brick works with cost, carriage, royalties, taxes etc. complete as per the direction of the E.I.C.. |
| 13 | 12 mm thick Cement plaster with C.M. (1:6) over brick works with cost, carriage, royalties, taxes etc. complete as per the direction of the E.I.C.. |
| 14 | Fixing Vertified Tiles in Floor laid on 20mm cement plaster (1:4) c.m.jointed with cement slusy mixed with pigment to match the shade of the tiles including rubbing & polishing complete including cost of tiles. |
| 15 | Fixing Vertified Tiles in dado with 12mm thick cement plaster (1:3) c.m.jointed with cement slusy mixed with pigment to match the shade of the tiles including rubbing & polishing complete including cost of tiles. |
| 16 | Finishing wall surface of wall with Acrylic wall putty (Water based) of approved make and finished smooth and even surface to received painting including cost of scaffolding staging charge with all cost |
| 17 | Wall painting with 2 coat Plastic emulsion paint of approved shade on new work to give an even shade including cost of paint etc complete. |
| 18 | Supplying,fitting and fixing of stainless steel of 304 grade in hand railling using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.9mt c/c and stainless steel square pipe braceing of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and spacifaction,buffing,polishing etc with cost,conveyance,taxes oe all materials,labour t&petc |
| 19 | Electrical works including internal wiring Please Enable Macros to View BoQ information |