| 1 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 2 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 3 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 4 | Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 5 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 6 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 7 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 8 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 9 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 10 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 11 | Dismantling one Anchor clamp /dead end clamp from 11 KV ABC |
| 12 | Erection of suspension clamp for 11KV ABC of any size |
| 13 | Erection of suspension clamp for LT ABC of any size |
| 14 | Dismantling of suspension clamp suitable for LT AB cable |
| 15 | Fitting one set AB switch and giving connection |
| 16 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 17 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 18 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 19 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 20 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 21 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 22 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 23 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 24 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 25 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16 (Street Light) + 1 x 50 Sq.mm. (Insulated Messenger) |
| 26 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 27 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 28 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 29 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 30 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 31 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 32 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 33 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 34 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 35 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 36 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 37 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm Please Enable Macros to View BoQ information |