Indian Tenders

Tender Notice

TDR 54803582
Tendering Authority Rajya Krishi Utpadan Mandi Parishad
Tender No 3035/16.03.2026
Tender ID 2026_RKUMP_1125943_1
Tender Brief Tender For The Construction Of The Link Road From Lohta Sanwara Link Road To Lohta Road, Via Pachahuwa Primary School. (Including 05 Years Of Maintenance) (As Per Boq)
City Mandi
State Uttar Pradesh
Document Fees INR 13100 /-
EMD INR 570000.0 /-
Tender Value INR 73.92 Lakhs /-
Tender Type Works
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender For The Construction Of The Link Road From Lohta Sanwara Link Road To Lohta Road, Via Pachahuwa Primary School. (Including 05 Years Of Maintenance) (As Per Boq)

Key Dates

Publish Date 23-03-2026
Last Date of Bid Submission 02-04-2026
Tender Opening Date 02-04-2026

Contact Information

Company Name Rajya Krishi Utpadan Mandi Parishad
Contact Person Dy. Director Const. Mandi Parishad Azamgarh
Address Dy. Director Const. Mandi Parishad Azamgarh

BOQ Items

Name of Work:- लोहटा संवरा सम्पर्क मार्ग से पचहुवा प्राथमिक विद्यालय होते हुए लोहटा मार्ग तक का निर्माण कार्य। (05 वर्षीय अनुरक्षण सहित) (As per BOQ)
Sl. No. Item Description
1Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8\\") layers, including ramming & dressing the surface to required levels and slopes and also including1.5 metre (5ffs) liíts and 30m. (100\\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee.
2Construction of (GSB)granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification clause 401.
3WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405
4WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405
5Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
6Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
7Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
8Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat
9Brick edging on both sides of roads of 1st class brick 8cm(3\\")wide & 12 cm (4.50\\")deep laid with mud mortor including labour & suplly of brick finished to required templete and in proper alignment and also includingdressing & ramming the excavated earth including all labour T&P sudries required for comption of work with material
10S/F of signboard as per direction of engineer in charge
11S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 450mm Dia Pipe
12The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 %
13The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75 %
14The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @1.50 %
15The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25 %
16The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 %
17Excavation in foundation in ordenary soil including lift up to 1.50M and lead upto30 Meter excavation earth in to the space between the building and the side of foundation trenches o in to the plainth and removal and disposal of surface earth as directed by E/I upto distance of 30 m from the foundation trenches (S.I.No.251A)
18Construction of (GSB)granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification clause 401.
19WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405
20Providing and laying in cement concrete 1:6:12(1cement:6fine sand:12 graded brickaggregate 40mm nominal size) and curing complete , including cost of formwork in foundation and floors.(S.I. No-273)
21M-150 Class brick work 1:4 cement and Ceorse sand of 1.25 mortar in foundation and plinth including supply of all materials labour T&P etc. required for proper completion of the work (S.I. No-305)
22Cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5 F.M. and cement proportion of M20 (1:1.5:3) including supply of all materials labour and T&P required for proper completion of work (Road Slab)
23Supply and laying of 125 micron pollythene sheet including supply of all material labour and T&P etc complete required for proper completion of works.
24Supply and laying cc culting in joibts of C.C. road including supply of all materials labour and T&P etc.(10X6cm)
25The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 %
26The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25 %
27The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50 %
28The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75 %
29The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00 % Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download Tendernotice_2 (2).pdf Tender Documents 0 KB
Download BOQ_2105579.xls Tender Documents 0 KB
Download e8feaa97-a8be-4b75-a179-78f290faeddf.html Tender Documents 0 KB
Download Tendernotice_1 (10).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.