Indian Tenders

Tender Notice

TDR 54724363
Tendering Authority Uttar Pradesh Jal Nigam
Tender No 415/V-14/66, Dated - 13.03.2026
Tender ID 2026_UPJNM_1125948_1
Tender Brief Corrigendum : Tender For Nagar Palika Parishad Tundla Interception And Diversion And Stp Work Under Sbm 2.0 Programme
City Tundla
State Uttar Pradesh
Document Fees INR 23600 /-
EMD INR 1124000.0 /-
Tender Value INR 11.23 Crore /-
Tender Type Works
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender For Nagar Palika Parishad Tundla Interception And Diversion And Stp Work Under Sbm 2.0 Programme- 1 I&D Network 2 Excavation Below G.L. Upto Depth As Specified For Laying Sewer And Manhole Ordinary Soil (Earth, Sand, Loam And Clay) Including Cutting Of Joints Pits Ramming Dressing) Leveling, Refilling Of Trenches In 20 Cm Layer Watering And Ramming The Same Including. 3 (A) 0.00 To 1.50 M 4 (B) 01.50 To 03.00 M 5 (C) 03.00 To 04.50 M 6 Provide And Fix Close Timbering In Trenches For The Depth As Specified Below G.L. Consisting Of 40 Mm Thick Approved Country Wood Plank For Polling Board 125 X 75 Mm Eucalyptus-Safeda-Sal Wood Wallers And 100 Mm Dia Ballies For Shuttering At 1.5 M C/C Including All Labour Etc , Complete 7 (A) 0.00 To 3 M 8 (B) 03.00 To 06.00 M 9 Same As Item No. 3 But For Open Timbering (No Timbering For Depth Less Than 1.50M) 10 (A) 1.50 To 03.00 M 11 Supply Of Following Sizes Of Rcc Spigotted And Socketed Non Pressure Pipes( Dia. In Mm ) With Structural Strength As Per Is 458 : 2003 And Its Latest Amendment(S). 12 600 Dia Pipe 13 700 Dia Pipe 14 1000 Dia Pipe 15 Carting Following Sizes Of R.C.C. Hume Pipe Np3 Class Socket / Spigot Rubber Ring Jointing And Specials From Store To The Work Lowering And Laying The Same In To The Trenches Upto Depth As Specified Below G.L. True To Alignment 16 600 Mm Dia Pipe 17 01.50 - 0 3.00 M 18 700 Mm Dia Pipe 19 04.50 - 06.00 M 20 1000 Mm Dia Pipe 21 04.50 - 06.00 M 22 Cement Concrete Work In Bedding Below G.L. At Specified Depth With Cement, Coarse Sand And 20 Mm Gauge Approved Stone Ballast (1:2:4) Including Supply Of All Materials, Labour, T&P Etc. Required For The Proper Completion Of Work. 23 (D) 04.50 To 06.00 M 24 Filling Granular Material (Well Graded Crushed Rock Or Gravel Maximum Size 20Mm) Into The Trenches For Class B Bedding (Granular Bedding) Including Watering Compaction, Labour T&P Etc. For Completion Of Work. 25 (B) 01.50 To 03.00 M 26 Supply (Excluding Cartage) Of Granular Material (Well Graded Crushed Rock Or Gravel Of Maximum Size 20Mm) For Class B Bedding (Granular Bedding) 27 Construction Of Circular Type Brick Masonry Hd (Hd20) Manhole (With Extra Heavy Duty Type Manhole Cover) With Top Slab Made Of Cement Concrete 1:1.5:3 With Graded Granite Stone Aggregate (12 Mm Nominal Size), Wall Made Of Brick Masonry Using 1St Class Bricks Having Crushing Strength Between 100 To 149 Kg/Cm² In Cement Mortar 1:4 Inside Plastering 12 Mm Thick 1:4 Finished Smooth With Neat Cement, Pinning, Outside Plaster 1:4 And Making Channels With Cement Concrete 1:2:4 Graded Granite Stone Aggregate (12 Mm Nominal Size) Complete As Per Specifications. 28 1200Mm Internal Dia., 2.30M Deep 29 1500Mm Internal Dia., 4.95M Deep 30 1800Mm Internal Dia., 9.0 M Deep 31 Dismantling/Cutting Of The Following Type Of Road For Laying Sewers, Manholes, Sewer Connection Chambers Etc. Including Shorting Out And Stacking Serviceable Materials And Disposal Of Unserviceable Materials Upto Distance Of 50 M. 32 Interlocking Tile Road 33 Reinstatement Of The Following Type Of Road For Laying Sewers, Manholes, Sewer Connection Chambers Etc. Including Shorting Out And Stacking Serviceable Materials And Disposal Of Unserviceable Materials Upto Distance Of 50 M. 34 Interlocking Tile Road 35 Providing And Erecting Temporary Barricading At Site As Per Drawing/ Direction Of Engineer-In-Charge Which Includes Hiring Of Ballies And Arrangement For Traffic Diversion Such As Traffic Signals During Construction At Site As Directed By The Engineer-In-Charge. The Barricading Provided Shall Be Retained In Position At Site Continuously I/C Shifting Of Barricading From One Location To Another Location As Many Times As Required During The Execution Of The Entire Work Till Its Completion. Rate Include Its Maintenance For Damages, Painting, All Incidentals, Labour Materials, Equipments And Works Required To Execute The Job. The Barricading Shall Not Be Removed Without Prior Approval Of Engineer-In-Charge. (Note :- One Time Payment Shall Be Made For Providing Barricading From Start Of Work Till Completion Of Work I/C Shifting. The Barricading Provided Shall Remain To Be The Property Of The Contractor On Completion Of The Work). The Rate Is For Unit Length Of Pipe Laying. 36 Interception & Diversion Works 37 Excavation In Foundation In Ordinary Soil (Loam, Clay & Sand) Including Lift Upto 1.5M And Lead Upto 50M Watering & Ramming Of Excavated Earth Into The Trenches Or Into The Space Between The Building And The Sides Of The Foundation Or Into The Plinth And Disposal Of Surplus Earth Upto A Distance 38 In Screen Channel 39 0.00 To 1.50 M 40 1.50 To 3.00 M 41 In Silt Chamber 42 0.00 To 1.50 M 43 1.50 To 3.00 M 44 In Outlet Chamber 45 0.00 To 1.50 M 46 1.50 To 3.00 M 47 Providing And Laying Pcc In Following Proportion In Foundation And Floor Including Supply Of All Materials, Labour, T&P Etc. Complete Required For The Work 1:4:8 With Coarse Sand And 40Cm Gauge Stone Ballast. 48 In Screen Channel 49 In Chamber 50 In Outlet Chamber 51 Providing Lay In Pcc In Following Proportion In Foundation And Floor Including Supply Of All Materials, Labour, T&P Etc. Complete Required For The Work 1:2:4 With Coarse Sand And 2Cm Gauge Stone Ballast. 52 In Screen Channel 53 In Chamber 54 In Outlet Chamber 55 Rcc Work With Cement, Coarse Sand And Graded Stone Aggregate 20Mm Nominal Size In Proportion Of 1:1.5:3 Excluding Supply Of The Reinforcement And Its Bending But Including Its Fixing And Binding With 0.5Mm Thick Binding Wire (To Be Supplied By The Contractor) & Including Necessary Centering And Shuttering, Supply Of All Materials Labour, T&P Etc. Required For Proper Completion Of Work. 56 0 -1.5M Depth 57 1.5-3.0M Depth 58 12 Mm Thick Plaster With Cement & Coarse Sand Mortar In 1:6 Over Brick Work Minimum Thickness Not To Be Less Than 10 Mm Including Supply Of All Materials, Labour, T & P Etc. Required For Proper Completion Of The Work. 59 0 -1.5M Depth 60 1.5-3.0M Depth 61 Rcc Work With Cement, Coarse Sand And Graded Stone Aggregate 20Mm Nominal Size In Proportion Of 1:2:4 Excluding Supply Of The Reinforcement And Its Bending But Including Its Fixing And Binding With 0.5Mm Thick Binding Wire (To Be Supplied By The Contractor) & Including Necessary Centering And Shuttering, Supply Of All Materials Labour, T&P Etc. Required For Proper Completion Of Work. 62 Mild Steel Or Iron Work In R.C.C. Work Wrought To Required Shape As Necessaty Including Bending For Proper Completion Of Work Including Supply Of Steel & Wastage Etc. In Slab 63 Providing And Fixing Perforated Rcc Slab. (100Mm Thick) 64 Provision Of Nalla Diversion At The Time Of Cunstructionincluding Making Bandha And Diversion Of Drain. 65 Providing And Fixing Footsteps In The Walls. 66 Providing And Fixing In Position Precast Rcc Manhole Cover And Frame Of Required Shape And Approved Quality.Circular Shape 560 Mm Internal Dia 67 Hand Operated Cast Iron Single Phases Weir Gate, Rising Spindle Type Generally As Per Is 13349 Class-1, Having Cast Iron Frame & Door Fitted With St. Steel Cf-8M Faces M.S Extension Road With Coupling And Ci Guide Brackets Suitable To A Required Distance. Sluice Gate Shall Be Provided With C.I. Geared Head Stock With Hand Wheel &Supporting M.S Channel. In Nala (Size-1.0X0.50M) 68 Manual Coarse Bar Screen Size 2.0Mx1.00M Meter And Barspacing 40Mm In Ss-304 As Per Site Requirement. 69 Site Clearance And Other Unforeseen Items. 70 Stp & Co-Treatment Facility 71 Design, Construction, Supply Of All Materials, Erection And Commissioning Of Sewage Treatment Facilities (7.00 Mld Stp Cum 6.00 Kld Co-Treatment And 12.45 Mld Mps) With All The Civil Construction, Electrical , Mechanical, Instrumentation And Scada System, Lt/Ht Panel, Sub Station & Its Building, Dg Set And Its Foundation, Admin Buidling, Laboratories, Meter Room And Campus Development [Construction Of Internal Road (Cc Road, 3.5M Wide, Area Approx 1000Sqm.), Staff Quarters As Per Requirement And Specification, External Water Supply (20Kl Tank Including Tube Well And Pumping Arrangement, Electrification & Street Llighting And Sanitation Work) Etc. All Complete For Stp With Co-Treatment Facilities. Stp Shall Be Based On Sbr Technology. The Effluent Quality For Agricultural Uses (Ph-6.5 To 8.3, Ss-30 Mg/L, Oil&Grease-10 Mg/L, Bod-10Mg/L) , Cod-30 Mg/L , Residual Chlorine-Nil , Tkn-10Mg/L, Nitrate N-10 Mg/L, F.C.-230 Mpn/100 Ml, Dissolved P-5 Mg/L (Preferable 2 Mg/L). Shall Be Maintained As Per Cpheeo Manuals. Latest Ngt Norms For Effluent Discharge Shall Be Adhered. The Cost Of Mps Of 12.45 Mld (Average Peak Flow) With Civil & E&M Is Included In This Cost. Co-Treatment Facility Of To Be Constructed To Treat Fecal 6 Kld Sludge. (Civil And E&M Works) In Included In This Cost. 72 Civil Work 73 E&M Work 74 Construction Of Boundary Wall 1.8M Ht. Above Plinth Level With Rcc Column @3M C/C With Plinth Beam And Foundation Avg. 1.2M Depth Including Reinforcement And Rcc Coping On Top Of Wall With Plaster (1:4) And Painting (Apex Painting 3 Coat) As Per Type Design And Drawing At The Stp Site 75 Ms Gate (3.6M Wide Gate) 76 Treated Effluent Pipe 77 Excavating Trenches For Pipes Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Upto 1.5 M Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth Including Consolidating Each Deposited Layer By Ramming, Watering Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. 78 0.0 To 1.5 Mtr. Depth 79 1.5 To 3.0 Mtr. Depth 80 Supply Of 800Mm Dia. Rcc Np3 Pipe And Special For The Pumping Mains Including All Complete (Upjn Rate) 81 Carting Following Sizes Of R.C.C. Hume Pipe Np3 Class Socket / Spigot Rubber Ring Jointing And Specials From Store To The Work Lowering And Laying The Same In To The Trenches Upto Depth As Specified Below G.L. True To Alignment

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 24-04-2026 Date Extension Corrigendum 2 Date 04-05-2026
2 15-04-2026 Date Extension Corrigendum Date 24-04-2026
3 15-04-2026 Date Extension Corrigendum Date 24-04-2026

Key Dates

Publish Date 24-04-2026
Last Date of Bid Submission 04-05-2026
Tender Opening Date 05-05-2026

Contact Information

Company Name Uttar Pradesh Jal Nigam
Contact Person Superintending Engineer
Address Construction Circle UPJN Urban Agra

BOQ Items

Name of Work:- NAGAR PALIKA PARISHAD TUNDLA I&D & STP WORK Under SBM 2.0 Programme
Sl. No. Item Description
1I&D NETWORK
2Excavation below G.L. upto depth as specified for laying sewer and manhole ordinary soil (earth, sand, loam and clay) including cutting of joints pits ramming dressing) leveling, refilling of trenches in 20 cm layer watering and ramming the same including.
3(a) 0.00 to 1.50 m
4(b) 01.50 to 03.00 m
5(c) 03.00 to 04.50 m
6Provide and fix close timbering in trenches for the depth as specified below G.L. consisting of 40 mm thick approved country wood plank for polling board 125 x 75 mm eucalyptus-Safeda-Sal Wood wallers and 100 mm dia ballies for shuttering at 1.5 m C/C including all labour etc , complete
7(a) 0.00 to 3 m
8(b) 03.00 to 06.00 m
9Same as item No. 3 but for open timbering (No timbering for depth less than 1.50m)
10(a) 1.50 to 03.00 m
11Supply of following sizes of RCC spigotted and socketed non pressure pipes( Dia. In mm ) with structural strength as per IS 458 : 2003 and its latest amendment(s).
12600 Dia Pipe
13700 Dia Pipe
141000 Dia Pipe
15Carting following sizes of R.C.C. Hume pipe NP3 Class Socket / spigot rubber ring jointing and specials from store to the work lowering and laying the same in to the trenches upto depth as specified below G.L. true to alignment
16600 mm dia pipe
1701.50 - 0 3.00 m
18700 mm dia pipe
1904.50 - 06.00 m
201000 mm dia pipe
2104.50 - 06.00 m
22Cement concrete work in bedding below G.L. at specified depth with cement, coarse sand and 20 mm gauge approved stone ballast (1:2:4) including supply of all materials, labour, T&P etc. required for the proper completion of work.
23(d) 04.50 to 06.00 m
24Filling granular material (well graded crushed rock or gravel maximum size 20mm) into the trenches for class B bedding (granular bedding) including watering compaction, labour T&P etc. for completion of work.
25(b) 01.50 to 03.00 m
26Supply (excluding cartage) of granular material (well graded crushed rock or gravel of maximum size 20mm) for class B bedding (granular bedding)
27Construction of circular type brick masonry HD (HD20) manhole (with Extra Heavy Duty type manhole cover) with top slab made of cement concrete 1:1.5:3 with graded granite stone aggregate (12 mm nominal size), wall made of brick masonry using 1st class bricks having crushing strength between 100 to 149 kg/cm² in cement mortar 1:4 inside plastering 12 mm thick 1:4 finished smooth with neat cement, pinning, outside plaster 1:4 and making channels with cement concrete 1:2:4 graded granite stone aggregate (12 mm nominal size) complete as per specifications.
281200mm internal dia., 2.30m deep
291500mm internal dia., 4.95m deep
301800mm internal dia., 9.0 m deep
31Dismantling/Cutting of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.
32Interlocking tile road
33Reinstatement of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.
34Interlocking tile road
35Providing and erecting temporary barricading at site as per drawing/ direction of Engineer-in-Charge which includes hiring of Ballies and arrangement for traffic diversion such as traffic signals during construction at site as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). The rate is for unit length of pipe laying.
36Interception & Diversion works
37Excavation in foundation in ordinary soil (loam, clay & sand) including lift upto 1.5m and lead upto 50m watering & ramming of excavated earth into the trenches or into the space between the building and the sides of the foundation or into the plinth and disposal of surplus earth upto a distance
38In Screen Channel
390.00 to 1.50 m
401.50 to 3.00 m
41In Silt Chamber
420.00 to 1.50 m
431.50 to 3.00 m
44In Outlet chamber
450.00 to 1.50 m
461.50 to 3.00 m
47Providing and laying PCC in following proportion in foundation and floor including supply of all materials, labour, T&P etc. complete required for the work 1:4:8 with coarse sand and 40cm gauge stone ballast.
48In Screen Channel
49In Chamber
50In Outlet Chamber
51Providing lay in PCC in following proportion in foundation and floor including supply of all materials, labour, T&P etc. complete required for the work 1:2:4 with coarse sand and 2cm gauge stone ballast.
52In Screen Channel
53In Chamber
54In Outlet Chamber
55RCC work with cement, coarse sand and graded stone aggregate 20mm nominal size in proportion of 1:1.5:3 excluding supply of the reinforcement and its bending but including its fixing and binding with 0.5mm thick binding wire (to be supplied by the contractor) & including necessary centering and shuttering, supply of all materials labour, T&P etc. required for proper completion of work.
560 -1.5m depth
571.5-3.0m depth
5812 mm thick plaster with cement & coarse sand mortar in 1:6 over brick work minimum thickness not to be less than 10 mm including supply of all materials, labour, T & P etc. required for proper completion of the work.
590 -1.5m depth
601.5-3.0m depth
61RCC work with cement, coarse sand and graded stone aggregate 20mm nominal size in proportion of 1:2:4 excluding supply of the reinforcement and its bending but including its fixing and binding with 0.5mm thick binding wire (to be supplied by the contractor) & including necessary centering and shuttering, supply of all materials labour, T&P etc. required for proper completion of work.
62Mild steel or iron work in R.C.C. work wrought to required shape as necessaty including bending for proper completion of work including supply of steel & wastage etc. In Slab
63Providing and fixing Perforated RCC Slab. (100mm thick)
64Provision of nalla diversion at the time of cunstructionincluding making bandha and diversion of drain.
65Providing and fixing footsteps in the walls.
66Providing and fixing in position precast RCC manhole cover and frame of required shape and approved quality.Circular shape 560 mm internal dia
67Hand operated cast iron single phases Weir Gate, rising spindle type generally as per IS 13349 Class-1, having cast iron frame & door fitted with St. Steel CF-8M faces M.S extension road with coupling and CI Guide brackets suitable to a required distance. Sluice gate shall be provided with C.I. Geared head stock with hand wheel &supporting M.S Channel. In Nala (Size-1.0x0.50m)
68Manual coarse bar screen size 2.0mx1.00m meter and barspacing 40mm in SS-304 as per site requirement.
69Site clearance and other unforeseen items.
70STP & Co-treatment facility
71Design, Construction, Supply of all materials, Erection and Commissioning of Sewage Treatment Facilities (7.00 MLD STP cum 6.00 KLD Co-treatment and 12.45 MLD MPS) with all the civil construction, electrical , mechanical, instrumentation and scada system, LT/HT panel, sub station & its building, DG set and its foundation, admin buidling, laboratories, meter room and campus development [Construction of Internal Road (CC Road, 3.5m wide, area approx 1000sqm.), staff quarters as per requirement and specification, external water supply (20KL tank including tube well and pumping arrangement, electrification & street llighting and sanitation work) etc. all complete for STP with co-treatment facilities. STP shall be based on SBR Technology. The effluent quality for agricultural uses (PH-6.5 TO 8.3, SS-30 mg/l, Oil&Grease-10 mg/l, BOD-10mg/l) , COD-30 mg/l , Residual chlorine-nil , TKN-10mg/l, Nitrate N-10 mg/l, F.C.-230 MPN/100 ml, Dissolved P-5 mg/l (preferable 2 mg/l). Shall be maintained as per CPHEEO manuals. Latest NGT norms for effluent discharge shall be adhered. The cost of MPS of 12.45 MLD (average peak flow) with Civil & E&M is included in this cost. Co-treatment facility of to be constructed to treat fecal 6 KLD sludge. (Civil and E&M works) in included in this cost.
72Civil Work
73E&M Work
74Construction of Boundary Wall 1.8m ht. above plinth level with RCC Column @3m c/c with plinth beam and foundation avg. 1.2m depth including reinforcement and RCC coping on top of wall with plaster (1:4) and painting (apex painting 3 coat) as per type design and drawing at the STP site
75MS gate (3.6m wide gate)
76Treated Effluent Pipe
77Excavating trenches for pipes including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed, within a lead of 50 m.
780.0 to 1.5 mtr. Depth
791.5 to 3.0 mtr. Depth
80Supply of 800mm dia. RCC NP3 pipe and special for the pumping mains including all complete (UPJN Rate)
81Carting following sizes of R.C.C. Hume pipe NP3 Class Socket / spigot rubber ring jointing and specials from store to the work lowering and laying the same in to the trenches upto depth as specified below G.L. true to alignment
82Dismantling/cutting of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.TILE road
83Reinstatement of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m. (1323)TILE road
84Trial & Run period of STP, Co-treatment facility and MPS successfully for 03 months with staffs , consumables etc. ( excluding electricity charges) Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 049a7e32-75cb-4b50-b3fb-0e21462e5ab2.html Tender Documents 0 KB
Download BOQ_2099409.xls Tender Documents 0 KB
Download TDTundla.pdf Tender Documents 0 KB
Download Tendernotice_1 (8).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.