| 1 | Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300.2 per Technical Specification Clause 301.5 |
| 2 | Construction of granular sub-base (grading-1) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 3 | Providing, laying, spreading and compacting stone aggregates of 45-63mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 4 | Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 5 | Brick edging on both side of theS.O.B. brick 8 cm. (3\\") wide and 12 cm. (4 1/2) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour T & P sudries required for proper completion of the work as per S.O.R. 2014 S.I. No. 765 |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 7 | Providing and applying tack coat with V.G.-10 Bitumen using distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 8 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 |
| 10 | E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I as per S.I. No. 251 |
| 11 | Providing and laying Cement concrete 1:4:8( 1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. As per SI No. 275 |
| 12 | Supply and laying and 15mm gauge Brick Ballast compacting with fine sand as 1st class beding cradle below the pipe in 15 cm thickness and up to 10 % hight of pipe on either side. |
| 13 | Clas-150 brick work with 1:4 cement and coarse sand in foundation and plinth including supply of all materials labour and T&P etc. Requuired for proper completion of work as per S.I No. 305(b) |
| 14 | Struck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and TandP etc Requuired for proper completion of work as per S.I No. 574. |
| 15 | Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar. Please Enable Macros to View BoQ information |