Name of Work:- WIDENING AND STRENGTHENING OF CHHAWNI CHANDRAPALIYA SHANKARPUR ROAD KA AWASHESH BHAG ROAD (ODR) (LENTH 11.000 TO 18.150) | Sl. No. | Item Description | |
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2..(Carted not less than 4.0 km) complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) as per Job mix formula. | | 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MORT&H specification clause No. 301 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) | | 3 | Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction. As per MORT& H Specifications Clause No. 305.3.4 completein all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) as per Job mix formula. | | 4 | Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) | | 5 | Construction of granular sub-base (Grade-1) by providing close graded material, spreading in uniform layers with 3.5 metre blade motor grader on prepared surface, mixing by mix in place method with 1 cum capacity front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRTH clause 401 With Design Job Mix Approved By Competent Authority complete in all Aspects. (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) | | 6 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical 100 tonne mix plant carriage of mixed Material by 10 cum capacity tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.complete as per MoRTH clause 406 With Design Job Mix Approved By Competent Authority complete in all Aspects. ( Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) | | 7 | Providing and applying Primer Coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 Kg/sqm using mechanical means. as per MoRTH specification clause No. 502 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) | | 8 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRTH specification clause No. 503 complete in all Aspects. (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) | | 9 | Providing and laying dense graded bituminous macadam (grade-2) thikness 75 mm with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous V.G-30 binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. With Design Job Mix Approved By Competent Authority complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P). | | 10 | Providing and laying bituminous concrete (Grade-II) thickness 30 mm with higher capacity batch type hot mix plant capacity 120 HMP using crushed aggregates of specified grading, premixed with bituminous VG-30 binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling smooth wheeled, vibratory with and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respects With Design Job Mix Approved By Competent Authority complete in all Aspects.(Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P). | | 11 | Earth work in excavation of foundation of structures of drain and Hume Pipe Culvert as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with the excavation earth to the extent required and utilising the remaining earth locally for road work. as per MORT&H specification clause No. 304 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P). | | 12 | Plain cement concrete 1:3:6 nominal mix in foundation of drain and RCC Culvert with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P)..with curing | | 13 | Plain cement concrete 1:4:8 nominal mix in foundation of drain and Hume Pipe Culvert with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P)..with curing | | 14 | Brick masonry work in 1:3 in sub-structure/Super Structure complete excluding pointing and plastering, as per drawing and Technical Specifications S.I. No. 307 in.all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P).with curing | | 15 | Brick masonry work in 1:3 in Super Structure complete excluding pointing and plastering, as per drawing and Technical Specifications S.I. No. 307+309 in.all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P).with curing | | 16 | Providing laying and fixing of 600 mm dia Hume Pipe NP-3 type all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P). | | 17 | Struck Pointing with 1:2 cement and fine sand. As per SI. NO. 574 all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P).with curing | | 18 | Brick on edge floor 1:6 & Pointed 1:2 over 8 cm. base cement concrete in 1:4:8 As per SI No. 614 all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P).with curing | | 19 | R.C.C. M-20 (1:11/2:3) in slab with Cement, C/sand & 20 mm grit fom approved quarry I/C cost of all materials labour T&P etc complete as required for proper completion of work and slab. As per S.I. No.(284) all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P).with curing | | 20 | R.C.C. work on 1:2:4 with cement , C/sand & 20 mm grit in bed block As per S.I. No.(282 ) all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P). with curing | | 21 | Placing reinforcement HYSD bars I/C cost of steel, cutting bending & T&P for proper completion of the work as per S.I. No. 504all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P). | | 22 | Executing work of Maintenance Cost [email protected]%including complete in all Aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | | 23 | Executing work of Maintenance Cost [email protected]%including complete in all Aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | | 24 | Executing work of Maintenance Cost [email protected]%including complete in all Aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | | 25 | Executing work of Maintenance Cost [email protected]%including complete in all Aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | | 26 | Executing work of Maintenance Cost [email protected]%including complete in all Aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. Please Enable Macros to View BoQ information |
|