| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical specification clause 405 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405. |
| 7 | Brick edging on both side of road of 1st class brick 8 cm. (3\\") wide and 12 cm. (4.5) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour, T&P sudries required for proper completion of work material. (SOR) |
| 8 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical specifications Clause 502 |
| 9 | Providing and applying tack coat with Bitumen VG-10 using at the rate of 0.35 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 10 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by a seal coat of either Type c as per technical Specication clause 508 |
| 11 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510. |
| 12 | Earthwork in. excavation for structures as per drawing and technical specifications Clause 305.1 including setting out. construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Clause 300 |
| 13 | Providing concrete for plain/reinforced concrete (1:3:6) in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 |
| 14 | Brick masonry work in cement mortar (1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 |
| 15 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 |
| 16 | Providing and laying reinforced cement conrete pipe (600mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106. |
| 17 | Providing and laying reinforced cement conrete pipe (350mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106. |
| 18 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 19 | Providing & fixing Km stone, Hectometer stone etc. complete |
| 20 | Providing & fixing of sign Board etc. complete |
| 21 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 20) |
| 22 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 20) |
| 23 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 20) |
| 24 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 20) |
| 25 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 20) Please Enable Macros to View BoQ information |